KYTC contract 25-1016 bid tabulation
GRADE, DRAIN & SURFACE WITH BRIDGE I-75. Let by Kentucky Transportation Cabinet on July 24, 2025. 1 bid received; low bid $147,559,358 by L-M Asphalt DBA Ats Const J/V Kay & Kay Contracting LLC, -16% against the engineer's estimate of $176,079,897.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 403
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | L-M Asphalt DBA Ats Const J/V Kay & Kay Contracting LLC | $147,559,358 | Low | -16% |
Engineer's estimate: $176,079,897.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. L-M Asphalt DBA Ats Const J/V Kay & Kay Contracting LLC |
|---|---|---|---|---|
| 0010 | Dga base | TON A A | 185,197 | $35.00 |
| 0020 | Cement stabilized roadbed | SQYD A A | 174,500 | $3.00 |
| 0030 | Drainage blanket-type II-asph | TON A A | 128,683 | $77.00 |
| 0040 | Asphalt seal aggregate | TON A A | 828 | $130.00 |
| 0050 | Asphalt seal coat | TON A A | 100.10 | $1,100.00 |
| 0060 | Leveling & wedging PG64-22 | TON A A | 36,704 | $110.00 |
| 0070 | CL2 asph base 1.00D PG64-22 | TON A A | 1,076 | $110.00 |
| 0080 | CL3 asph base 1.00D PG64-22 | TON A A | 52,180 | $90.00 |
| 0090 | CL4 asph base 1.00D PG64-22 | TON A A | 24,527 | $91.75 |
| 0100 | CL4 asph base 1.00D PG76-22 | TON A A | 47,500 | $95.00 |
| 0110 | CL2 asph surf 0.38D PG64-22 | TON A A | 345 | $165.00 |
| 0120 | CL3 asph surf 0.38D PG64-22 | TON A A | 19,057 | $105.50 |
| 0130 | CL4 asph surf 0.38A PG76-22 | TON A A | 23,597 | $130.00 |
| 0140 | Asphalt curing seal | TON A A | 217 | $775.00 |
| 0150 | Cement | TON A A | 3,801 | $240.00 |
| 0160 | Mobilization for mill & text | LS A A | 1 | $7,500.00 |
| 0170 | Mobilization for mill & text | LS A A | 1 | $7,500.00 |
| 0180 | Asphalt pave milling & texturing | TON A A | 14,648 | $24.00 |
| 0190 | Sand for blotter | TON A A | 677 | $45.00 |
| 0200 | CL3 asph base CK PG64-22 | TON A A | 29,551 | $98.50 |
| 0210 | CL4 asph base CK PG64-22 | TON A A | 32,608 | $97.25 |
| 0220 | Asphalt material for tack non-tracking | TON A A | 625 | $5.00 |
| 0230 | Crushed aggregate size no 2 | TON A A | 20,264 | $38.00 |
| 0240 | Perforated pipe-4 in | LF A A | 58,647 | $10.35 |
| 0250 | Perforated pipe-6 in | LF A A | 25,364 | $10.55 |
| 0260 | Non-perforated pipe-4 in | LF A A | 2,004 | $18.50 |
| 0270 | Non-perforated pipe-6 in | LF A A | 744 | $25.00 |
| 0280 | Inspect & certify edge drain system | LS A A | 1 | $10,000 |
| 0290 | Inspect & certify edge drain system | LS A A | 1 | $27,500 |
| 0300 | Perf pipe headwall TY 1-4 in | EACH A A | 91 | $605.00 |
| 0310 | Perf pipe headwall TY 3-4 in | EACH A A | 26 | $610.00 |
| 0320 | Perf pipe headwall TY 4-4 in | EACH A A | 44 | $625.00 |
| 0330 | Perf pipe headwall TY 4-6 in | EACH A A | 3 | $650.00 |
| 0340 | Cored hole drainage box con-4 in | EACH A A | 2 | $300.00 |
| 0350 | Cored hole drainage box con-6 in | EACH A A | 59 | $350.00 |
| 0360 | Conc median barrier type A TL5 56 in | LF A A | 24,879 | $175.35 |
| 0370 | Delineator for guardrail mono directional white | EACH A A | 482 | $13.00 |
| 0380 | Delineator for guardrail mono directional yello | EACH A A | 16 | $13.00 |
| 0390 | Delineator for barrier - white | EACH A A | 764 | $17.41 |
| 0400 | Delineator for barrier - yellow | EACH A A | 855 | $17.41 |
| 0410 | Delineator for barrier wall-B/Y | EACH A A | 306 | $17.41 |
| 0420 | Remove temp conc barrier wall | LF A A | 575 | $12.20 |
| 0430 | Relocate temp conc barrier | LF A A | 44,690 | $2.10 |
| 0440 | Barricade-type III | EACH A A | 8 | $500.00 |
| 0450 | Temp ditch | LF A A | 18,481 | $1.00 |
| 0460 | Clean temp ditch | LF A A | 9,240 | $0.01 |
| 0470 | Roadway excavation | CUYD A A | 879,672 | $16.00 |
| 0480 | Water | MGAL A A | 8,902 | $0.01 |
| 0490 | Fence-woven wire type 1 | LF A A | 1,921 | $9.62 |
| 0500 | Remove fence | LF A A | 1,830 | $7.10 |
| 0510 | Remove & replace fence | LF A A | 58,417 | $18.15 |
| 0520 | Guardrail-steel W beam-S face | LF A A | 37,525 | $26.95 |
| 0530 | Guardrail terminal section no 1 | EACH A A | 2 | $90.00 |
| 0540 | Guardrail end treatment type 1 | EACH A A | 31 | $3,100.00 |
| 0550 | Guardrail end treatment type 2A | EACH A A | 31 | $1,800.00 |
| 0560 | Remove guardrail | LF A A | 33,109 | $4.50 |
| 0570 | Right-of-way monument type 1 | EACH A A | 15 | $125.00 |
| 0580 | Witness post | EACH A A | 15 | $100.00 |
| 0590 | Channel lining class III | TON A A | 553 | $58.00 |
| 0600 | Clearing and grubbing | LS A A | 1 | $700,000 |
| 0610 | Clearing and grubbing | LS A A | 1 | $100,000 |
| 0620 | Concrete-class B | CUYD A A | 25.10 | $450.00 |
| 0630 | Temporary signs | SQFT A A | 1,012.40 | $13.00 |
| 0640 | Edge key | LF A A | 593 | $10.00 |
| 0645 | Fabric-geotextile class 2 | SQYD A A | 26,420 | $1.65 |
| 0650 | Fabric-geotextile class 2 for pipe | SQYD A A | 11,036 | $2.00 |
| 0660 | Maintain & control traffic | LS A A | 1 | $1,000,000 |
| 0670 | Maintain & control traffic | LS A A | 1 | $2,450,000 |
| 0680 | Portable changeable message sign | EACH A A | 10 | $28,000 |
| 0690 | Shoulder rumble strips | LF A A | 133,151 | $0.17 |
| 0700 | Temp silt fence | LF A A | 18,481 | $3.50 |
| 0710 | Silt trap type A | EACH A A | 154 | $350.00 |
| 0720 | Silt trap type B | EACH A A | 154 | $150.00 |
| 0730 | Silt trap type C | EACH A A | 154 | $125.00 |
| 0740 | Clean silt trap type A | EACH A A | 154 | $50.00 |
| 0750 | Clean silt trap type B | EACH A A | 154 | $50.00 |
| 0760 | Clean silt trap type C | EACH A A | 154 | $50.00 |
| 0770 | Staking | LS A A | 1 | $350,000 |
| 0780 | Staking | LS A A | 1 | $150,000 |
| 0790 | Remove structure | LS A A | 1 | $487,000 |
| 0800 | Remove structure | LS A A | 1 | $517,500 |
| 0810 | Remove structure | LS A A | 1 | $176,000 |
| 0820 | Remove structure | LS A A | 1 | $255,000 |
| 0830 | Remove structure | LS A A | 1 | $278,000 |
| 0840 | Arrow panel | EACH A A | 8 | $2,500.00 |
| 0850 | Relocate crash cushion | EACH A A | 7 | $2,900.00 |
| 0860 | Conc barrier wall type 9T | LF A A | 70,055 | $27.00 |
| 0870 | Tubular markers | EACH A A | 96 | $100.22 |
| 0880 | Erosion control blanket | SQYD A A | 1,183 | $2.25 |
| 0890 | Temp mulch | SQYD A A | 500,818 | $0.30 |
| 0900 | Temp seeding and protection | SQYD A A | 373,745 | $0.31 |
| 0910 | Initial fertilizer | TON A A | 23 | $980.00 |
| 0920 | Maintenance fertilizer | TON A A | 38.70 | $1,400.00 |
| 0930 | Seeding and protection | SQYD A A | 747,490 | $0.46 |
| 0940 | Agricultural limestone | TON A A | 463.30 | $95.00 |
| 0950 | Pave striping-temp paint-6 in | LF A A | 454,600 | $0.28 |
| 0960 | Pave striping-thermo-6 in W | LF A A | 109,551 | $1.25 |
| 0970 | Pave striping-thermo-6 in Y | LF A A | 70,939 | $1.25 |
| 0980 | Pave striping-thermo-12 in W | LF A A | 5,648 | $3.00 |
| 0990 | Pave striping-temp rem tape-B | LF A A | 137,815 | $2.60 |
| 1000 | Pave striping-dur TY 1-6 in W | LF A A | 4,750 | $8.00 |
| 1010 | Pave striping-dur TY 1-6 in Y | LF A A | 3,550 | $8.00 |
| 1020 | Pave striping-dur TY 1-12 in W | LF A A | 4,172 | $14.00 |
| 1030 | Pave marking-thermo stop bar-24IN | LF A A | 190 | $12.00 |
| 1040 | Pave marking-thermo cross-hatch | SQFT A A | 319 | $6.00 |
| 1050 | Pave marking-thermo curv arrow | EACH A A | 78 | $120.00 |
| 1060 | Pave marking-thermo merge arrow | EACH A A | 21 | $300.00 |
| 1070 | Pavement marker type V-MW | EACH A A | 104 | $40.00 |
| 1080 | Inlaid pavement marker-MW | EACH A A | 147 | $36.00 |
| 1090 | Inlaid pavement marker-MY | EACH A A | 110 | $36.00 |
| 1100 | Inlaid pavement marker-B W/R | EACH A A | 1,403 | $36.00 |
| 1110 | Inlaid pavement marker-B Y/R | EACH A A | 1,720 | $36.00 |
| 1120 | Remove superstructure | LS A A | 1 | $218,000 |
| 1130 | Crash cushion TY 6 class B TL3 | EACH A A | 16 | $4,500.00 |
| 1140 | Crash cushion TY 6 class D TL3 | EACH A A | 3 | $57,500 |
| 1150 | Fuel adjustment | DOLL A A | 834,888 | $1.00 |
| 1160 | Asphalt adjustment | DOLL A A | 1,044,430 | $1.00 |
| 1170 | Object marker TY 3 | EACH A A | 31 | $60.00 |
| 1175 | Law enforcement officer | HOUR A A | 2,500 | $80.00 |
| 1180 | Relocate tubular marker | EACH A A | 48 | $60.00 |
| 1190 | Sawcut pavement | LF A A | 59,443 | $2.50 |
| 1200 | Water blasting existing stripe | LF A A | 3,341 | $0.75 |
| 1205 | End anchors | EACH A A | 1 | $19,755 |
| 1210 | Turf reinforcement mat 1 | SQYD A A | 3,689 | $4.80 |
| 1220 | Turf reinforcement mat 2 | SQYD A A | 1,330 | $6.30 |
| 1230 | Remove thermoplastic arrows | EACH A A | 14 | $100.00 |
| 1240 | Lightweight aggregate fill | CUYD A A | 6,187 | $210.00 |
| 1250 | Remove cable guardrail barrier system | LF A A | 24,661 | $3.30 |
| 1260 | Object marker type 1 | EACH A A | 3 | $200.00 |
| 1270 | Pave mark thermo chevron | SQFT A A | 833 | $6.00 |
| 1280 | Intelligent compaction for soil | CUYD A A | 500,000 | $0.01 |
| 1290 | Intelligent compaction for aggregate | TON A A | 184,919 | $0.01 |
| 1300 | Intelligent compaction for asphalt | TON A A | 420,315 | $0.01 |
| 1310 | Pave mount infrared temp equipment | SF A A | 17,521,974 | $0.01 |
| 1320 | Queue protection vehicle | HOUR A A | 2,000 | $99.72 |
| 1330 | Thrie beam guardrail transition TL-3 | EACH A A | 18 | $5,750.00 |
| 1340 | Thrie beam guardrail transition TL-2 | EACH A A | 10 | $1,975.00 |
| 1350 | Furnish queue protection vehicles | MONT A A | 60 | $4,450.00 |
| 1360 | Portable queue warning alert system | MONT A A | 30 | $1,375.00 |
| 1370 | Queue warning PCMS | MONT A A | 180 | $530.00 |
| 1380 | Queue warning portable radar sensors | MONT A A | 180 | $0.01 |
| 1390 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 |
| 1400 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 |
| 1410 | Entrance pipe-15 in | LF A A | 216 | $135.00 |
| 1420 | Culvert pipe-15 in | LF A A | 375 | $145.00 |
| 1430 | Culvert pipe-18 in | LF A A | 278 | $150.00 |
| 1440 | Culvert pipe-24 in | LF A A | 169 | $160.00 |
| 1450 | Culvert pipe-42 in | LF A A | 11 | $450.00 |
| 1460 | Storm sewer pipe-15 in | LF A A | 2,069 | $110.00 |
| 1470 | Storm sewer pipe-18 in | LF A A | 1,073 | $120.00 |
| 1480 | Storm sewer pipe-24 in | LF A A | 18 | $300.00 |
| 1490 | Pipe culvert headwall-15 in | EACH A A | 5 | $3,000.00 |
| 1500 | Pipe culvert headwall-15 in | EACH A A | 4 | $3,000.00 |
| 1510 | Pipe culvert headwall-18 in | EACH A A | 3 | $3,250.00 |
| 1520 | Pipe culvert headwall-18 in | EACH A A | 11 | $3,250.00 |
| 1530 | Pipe culvert headwall-24 in | EACH A A | 2 | $3,350.00 |
| 1540 | Pipe culvert headwall-24 in | EACH A A | 6 | $3,350.00 |
| 1550 | Pipe culvert headwall-42 in | EACH A A | 1 | $4,500.00 |
| 1560 | Remove pipe | LF A A | 1,728 | $75.00 |
| 1570 | S & F box inlet-outlet-18 in | EACH A A | 2 | $4,000.00 |
| 1580 | Curb box inlet type B | EACH A A | 14 | $9,500.00 |
| 1590 | Drop box inlet type 1 | EACH A A | 2 | $7,500.00 |
| 1600 | Drop box inlet type 5B | EACH A A | 1 | $8,000.00 |
| 1610 | Drop box inlet type 5F | EACH A A | 2 | $7,000.00 |
| 1620 | Conc med barr box inlet TY B2 TL5 56 | EACH A A | 53 | $17,000 |
| 1630 | Conc med barr box inlet TY A2 TL5 56 | EACH A A | 3 | $18,000 |
| 1640 | Junction box-15 in | EACH A A | 8 | $4,000.00 |
| 1650 | Junction box-18 in | EACH A A | 4 | $4,000.00 |
| 1660 | Junction box-24 in | EACH A A | 3 | $5,000.00 |
| 1670 | Manhole type A | EACH A A | 7 | $7,000.00 |
| 1680 | Manhole type B | EACH A A | 1 | $8,000.00 |
| 1690 | PVC fold and form pipe liner-15 in | LF A A | 4,776 | $110.00 |
| 1700 | PVC fold and form pipe liner-18 in | LF A A | 4,603 | $105.00 |
| 1710 | PVC fold and form pipe liner-24 in | LF A A | 3,370 | $140.00 |
| 1720 | PVC fold and form pipe liner-30 in | LF A A | 1,020 | $160.00 |
| 1730 | PVC fold and form pipe liner-36 in | LF A A | 299 | $180.00 |
| 1740 | PVC fold and form pipe liner-42 in | LF A A | 494 | $220.00 |
| 1750 | Conc median barrier type A TL5 56 in | LF A A | 204 | $300.00 |
| 1760 | Structure granular backfill | CUYD A A | 366 | $145.00 |
| 1770 | Armored edge for concrete | LF A A | 251.20 | $105.00 |
| 1780 | Foundation preparation | LS A A | 1 | $130,000 |
| 1790 | Crushed aggregate slope prot | TON A A | 648 | $85.00 |
| 1800 | Test piles | LF A A | 55 | $295.00 |
| 1810 | Piles-steel HP12X53 | LF A A | 840 | $140.00 |
| 1820 | Pile points-12 in | EACH A A | 40 | $175.00 |
| 1830 | Concrete-class A | CUYD A A | 813.60 | $1,315.00 |
| 1840 | Concrete-class AA | CUYD A A | 845.20 | $1,430.00 |
| 1850 | Mechanical reinf coupler #5 epoxy coated | EACH A A | 1,686 | $48.00 |
| 1860 | Steel reinforcement-epoxy coated | LB A A | 424,236 | $1.93 |
| 1870 | Precast PC box beam SB21 | LF A A | 3,176 | $345.00 |
| 1880 | Drilled shaft-rock 48 in | LF A A | 243 | $2,100.00 |
| 1890 | Drilled shaft 54 in-solid rock | LF A A | 168 | $2,500.00 |
| 1900 | Rock soundings | LF A A | 264.80 | $112.00 |
| 1910 | Rock corings | LF A A | 609 | $142.00 |
| 1920 | CSL testing (4 tubes) | EACH A A | 27 | $3,100.00 |
| 1930 | Drilled shaft-54 in-common | LF A A | 120 | $2,350.00 |
| 1940 | Concrete sealing | SQFT A A | 50,662 | $2.50 |
| 1950 | Mechanical reinf coupler #8-epoxy coated | EACH A A | 34 | $110.00 |
| 1960 | Rail system single slope - 40 in | LF A A | 407 | $200.00 |
| 1970 | Conc median barrier type A TL5 56 in | LF A A | 186 | $325.00 |
| 1976 | Mobilization for concrete surf treatment | LS A A | 1 | $3,500.00 |
| 1980 | Structure granular backfill | CUYD A A | 260 | $145.00 |
| 1990 | Remove concrete masonry | CUYD A A | 84.50 | $955.00 |
| 2000 | Masonry coating | SQYD A A | 972 | $27.00 |
| 2010 | Expan joint replace 1 1/2 in | LF A A | 169.80 | $975.00 |
| 2020 | Armored edge for concrete | LF A A | 255.30 | $150.00 |
| 2030 | Foundation preparation | LS A A | 1 | $110,000 |
| 2040 | Crushed aggregate slope prot | TON A A | 278 | $103.00 |
| 2050 | Test piles | LF A A | 79 | $240.00 |
| 2060 | Piles-steel HP12X53 | LF A A | 769 | $135.00 |
| 2070 | Pile points-12 in | EACH A A | 24 | $175.00 |
| 2080 | Concrete-class A | CUYD A A | 319 | $1,530.00 |
| 2090 | Concrete-class AA | CUYD A A | 616.70 | $1,595.00 |
| 2100 | Mechanical reinf coupler #5 epoxy coated | EACH A A | 801 | $65.00 |
| 2110 | Steel reinforcement-epoxy coated | LB A A | 185,135 | $1.86 |
| 2120 | Jack & support bridge span | LS A A | 1 | $60,000 |
| 2125 | Blast cleaning | SQYD A A | 1,570 | $22.00 |
| 2130 | Expansion dam-1.5 in neoprene | LF A A | 95 | $280.00 |
| 2135 | Epoxy sand slurry | SQYD A A | 49 | $50.00 |
| 2140 | Rem epoxy bit foreign overlay | SQYD A A | 1,570 | $32.00 |
| 2150 | Conc class M full depth patch | CUYD A A | 6.60 | $1,000.00 |
| 2170 | Precast PC box beam SB33 | LF A A | 901.70 | $480.00 |
| 2180 | Drilled shaft-rock 48 in | LF A A | 52 | $1,800.00 |
| 2190 | Drilled shaft 54 in-solid rock | LF A A | 70 | $2,150.00 |
| 2200 | Rock soundings | LF A A | 113 | $135.00 |
| 2210 | Rock corings | LF A A | 132 | $220.00 |
| 2220 | CSL testing (4 tubes) | EACH A A | 6 | $3,300.00 |
| 2230 | Bearing replacement | EACH A A | 20 | $7,000.00 |
| 2240 | Drilled shaft-54 in-common | LF A A | 98 | $1,850.00 |
| 2250 | Bridge barrier retrofit | LF A A | 372 | $495.00 |
| 2260 | Concrete sealing | SQFT A A | 27,657 | $2.10 |
| 2270 | Partial depth patching | CUYD A A | 6.60 | $2,000.00 |
| 2280 | Mechanical reinf coupler #4-epoxy coated | EACH A A | 18 | $57.00 |
| 2290 | Concrete coating | LS A A | 1 | $20,000 |
| 2295 | Mobilization for concrete surf treatment | LS A A | 1 | $3,500.00 |
| 2300 | Remove concrete masonry | CUYD A A | 12.50 | $1,165.00 |
| 2310 | Structure excav-solid rock | CUYD A A | 13 | $300.00 |
| 2320 | Foundation preparation | LS A A | 1 | $35,000 |
| 2330 | Concrete-class A | CUYD A A | 31 | $3,200.00 |
| 2340 | Steel reinforcement | LB A A | 3,307 | $3.00 |
| 2350 | Structure granular backfill | CUYD A A | 1,295 | $55.00 |
| 2360 | Remove concrete masonry | CUYD A A | 116.80 | $745.00 |
| 2370 | Masonry coating | SQYD A A | 1,165 | $26.25 |
| 2380 | Armored edge for concrete | LF A A | 330 | $113.00 |
| 2390 | Foundation preparation | LS A A | 1 | $205,000 |
| 2400 | Crushed aggregate slope prot | TON A A | 2,687 | $35.50 |
| 2410 | Test piles | LF A A | 133 | $106.00 |
| 2420 | Piles-steel HP12X53 | LF A A | 1,264 | $72.00 |
| 2430 | Pile points-12 in | EACH A A | 32 | $165.00 |
| 2440 | Concrete-class A | CUYD A A | 609.60 | $1,133.00 |
| 2450 | Concrete-class AA | CUYD A A | 1,028.20 | $1,820.00 |
| 2460 | Mechanical reinf coupler #6 epoxy coated | EACH A A | 1,712 | $105.00 |
| 2470 | Steel reinforcement | LB A A | 14,193 | $3.95 |
| 2480 | Steel reinforcement-epoxy coated | LB A A | 358,978 | $1.70 |
| 2490 | Precast PC box beam SB42 | LF A A | 2,964.40 | $530.00 |
| 2500 | Drilled shaft-rock 48 in | LF A A | 64 | $2,300.00 |
| 2510 | Drilled shaft 54 in-solid rock | LF A A | 10 | $3,770.00 |
| 2520 | Rock soundings | LF A A | 138 | $53.50 |
| 2530 | Rock corings | LF A A | 172 | $80.00 |
| 2540 | CSL testing (4 tubes) | EACH A A | 8 | $1,575.00 |
| 2550 | Drilled shaft-54 in-common | LF A A | 132 | $2,550.00 |
| 2560 | Barrier wall transition | LF A A | 70 | $913.38 |
| 2570 | Concrete sealing | SQFT A A | 41,069 | $1.90 |
| 2580 | Rail system single slope - 40 in | LF A A | 890 | $190.00 |
| 2585 | Mobilization for concrete surf treatment | LS A A | 1 | $2,000.00 |
| 2590 | Structure granular backfill | CUYD A A | 93 | $65.00 |
| 2600 | Armored edge for concrete | LF A A | 52.30 | $145.00 |
| 2610 | Foundation preparation | LS A A | 1 | $76,500 |
| 2620 | Crushed aggregate slope prot | TON A A | 769 | $45.00 |
| 2630 | Test piles | LF A A | 59 | $135.00 |
| 2640 | Piles-steel HP12X53 | LF A A | 245 | $115.00 |
| 2650 | Pile points-12 in | EACH A A | 12 | $164.00 |
| 2660 | Concrete-class A | CUYD A A | 166.20 | $1,550.00 |
| 2670 | Concrete-class AA | CUYD A A | 328.50 | $1,438.91 |
| 2680 | Steel reinforcement-epoxy coated | LB A A | 120,892 | $2.26 |
| 2690 | Precast PC box beam SB33 | LF A A | 1,154 | $395.00 |
| 2700 | Drilled shaft-rock 48 in | LF A A | 48 | $2,500.00 |
| 2710 | Drilled shaft 54 in-solid rock | LF A A | 9 | $2,300.00 |
| 2720 | Rock soundings | LF A A | 142 | $53.50 |
| 2730 | Rock corings | LF A A | 129 | $80.00 |
| 2740 | CSL testing (4 tubes) | EACH A A | 6 | $1,685.00 |
| 2750 | Drilled shaft-54 in-common | LF A A | 118 | $2,500.00 |
| 2760 | Concrete sealing | SQFT A A | 20,787 | $2.50 |
| 2770 | Rail system single slope - 40 in | LF A A | 586 | $200.00 |
| 2775 | Mobilization for concrete surf treatment | LS A A | 1 | $2,000.00 |
| 2780 | Structure granular backfill | CUYD A A | 137 | $61.00 |
| 2790 | Armored edge for concrete | LF A A | 89.50 | $165.00 |
| 2800 | Structure excav-solid rock | CUYD A A | 88 | $145.00 |
| 2810 | Foundation preparation | LS A A | 1 | $105,250 |
| 2820 | Crushed aggregate slope prot | TON A A | 505 | $45.00 |
| 2830 | Concrete-class A | CUYD A A | 316 | $1,620.00 |
| 2840 | Concrete-class AA | CUYD A A | 489 | $1,292.83 |
| 2850 | Mechanical reinf coupler #9 | EACH A A | 14 | $180.00 |
| 2860 | Mechanical reinf coupler #5 epoxy coated | EACH A A | 30 | $75.00 |
| 2870 | Steel reinforcement | LB A A | 6,387 | $2.60 |
| 2880 | Steel reinforcement-epoxy coated | LB A A | 199,125 | $2.13 |
| 2890 | Precast PC box beam SB33 | LF A A | 1,641 | $410.00 |
| 2900 | Drilled shaft-rock 48 in | LF A A | 10 | $2,650.00 |
| 2910 | Rock soundings | LF A A | 144 | $55.00 |
| 2920 | Rock corings | LF A A | 285 | $80.00 |
| 2930 | CSL testing (4 tubes) | EACH A A | 15 | $1,420.00 |
| 2940 | Concrete sealing | SQFT A A | 27,464 | $2.00 |
| 2950 | Drilled shaft-48 in-common | LF A A | 115 | $2,800.00 |
| 2960 | Drilled shaft-42 in-rock | LF A A | 105 | $2,500.00 |
| 2970 | Rail system single slope - 40 in | LF A A | 555 | $250.00 |
| 2975 | Mobilization for concrete surf treatment | LS A A | 1 | $2,000.00 |
| 2980 | Remove concrete masonry | CUYD A A | 80 | $2,020.00 |
| 2990 | Fabric-geotextile class 2 | SQYD A A | 1,454 | $2.00 |
| 3000 | Fabric-geotextile class 1A | SQYD A A | 8,359 | $2.50 |
| 3010 | Masonry coating | SQYD A A | 2,199 | $21.00 |
| 3020 | Armored edge for concrete | LF A A | 256 | $108.00 |
| 3030 | Structure excavation-common | CUYD A A | 2,525 | $33.50 |
| 3040 | Structure excav-solid rock | CUYD A A | 1,495 | $94.00 |
| 3050 | Foundation preparation | LS A A | 1 | $225,000 |
| 3060 | Cyclopean stone rip rap | TON A A | 419 | $64.00 |
| 3070 | Crushed aggregate slope prot | TON A A | 930 | $55.00 |
| 3080 | Test piles | LF A A | 106 | $110.00 |
| 3090 | Piles-steel HP14X89 | LF A A | 1,391 | $110.00 |
| 3100 | Pile points-14 in | EACH A A | 34 | $187.00 |
| 3110 | Concrete-class A | CUYD A A | 1,629 | $1,050.00 |
| 3120 | Concrete-class AA | CUYD A A | 1,229 | $1,224.00 |
| 3130 | Concrete-class M 2 | CUYD A A | 30 | $1,500.00 |
| 3140 | Mechanical reinf coupler #5 | EACH A A | 44 | $70.00 |
| 3150 | Mechanical reinf coupler #6 | EACH A A | 22 | $85.00 |
| 3160 | Mechanical reinf coupler #7 | EACH A A | 32 | $106.00 |
| 3170 | Mechanical reinf coupler #9 | EACH A A | 40 | $135.00 |
| 3180 | Mechanical reinf coupler #10 | EACH A A | 48 | $175.00 |
| 3190 | Mechanical reinf coupler #11 | EACH A A | 80 | $211.00 |
| 3200 | Mechanical reinf coupler #5 epoxy coated | EACH A A | 1,389 | $54.00 |
| 3210 | Mechanical reinf coupler #6 epoxy coated | EACH A A | 1,303 | $63.00 |
| 3220 | Steel reinforcement | LB A A | 225,614 | $1.90 |
| 3230 | Steel reinforcement-epoxy coated | LB A A | 498,471 | $1.53 |
| 3240 | Structural steel | LS A A | 1 | $5,289,000 |
| 3250 | Shear connectors | LS A A | 1 | $79,500 |
| 3260 | Approach slab | SQYD A A | 185 | $750.00 |
| 3270 | Clearing bridge site | LS A A | 1 | $63,000 |
| 3280 | Rock soundings | LF A A | 37 | $55.00 |
| 3290 | Rock corings | LF A A | 196.80 | $80.00 |
| 3300 | Concrete patching repair | SQFT A A | 80 | $510.00 |
| 3310 | Concrete sealing | SQFT A A | 34,572 | $2.20 |
| 3320 | Epoxy injection crack repair | LF A A | 40 | $172.00 |
| 3330 | Finger expansion joint | LF A A | 64 | $6,050.00 |
| 3340 | Mechanical reinf coupler #8-epoxy coated | EACH A A | 45 | $165.00 |
| 3350 | Granular backfill | CUYD A A | 2,190 | $71.50 |
| 3360 | Drilled shaft - 108 in (common) | LF A A | 29 | $6,700.00 |
| 3370 | Drilled shaft - 102 in (solid rock) | LF A A | 94.80 | $6,425.00 |
| 3380 | Rail system single slope - 40 in | LF A A | 1,195 | $200.00 |
| 3390 | Remove concrete masonry | CUYD A A | 80 | $2,020.00 |
| 3400 | Fabric-geotextile class 2 | SQYD A A | 1,494 | $2.00 |
| 3410 | Fabric-geotextile class 1A | SQYD A A | 8,726 | $2.50 |
| 3420 | Masonry coating | SQYD A A | 2,339 | $21.00 |
| 3430 | Armored edge for concrete | LF A A | 256 | $135.00 |
| 3440 | Structure excavation-common | CUYD A A | 2,581 | $35.00 |
| 3450 | Structure excav-solid rock | CUYD A A | 1,674 | $100.00 |
| 3460 | Foundation preparation | LS A A | 1 | $225,000 |
| 3470 | Cyclopean stone rip rap | TON A A | 965 | $61.00 |
| 3480 | Crushed aggregate slope prot | TON A A | 666 | $56.00 |
| 3490 | Test piles | LF A A | 83 | $100.00 |
| 3500 | Piles-steel HP14X89 | LF A A | 967 | $100.00 |
| 3510 | Pile points-14 in | EACH A A | 34 | $187.00 |
| 3520 | Concrete-class A | CUYD A A | 1,568 | $1,100.00 |
| 3530 | Concrete-class AA | CUYD A A | 1,392 | $1,395.00 |
| 3540 | Concrete-class M 2 | CUYD A A | 30 | $1,500.00 |
| 3550 | Mechanical reinf coupler #11 | EACH A A | 80 | $220.00 |
| 3560 | Steel reinforcement | LB A A | 204,772 | $1.90 |
| 3570 | Steel reinforcement-epoxy coated | LB A A | 557,100 | $1.90 |
| 3580 | Structural steel | LS A A | 1 | $6,750,000 |
| 3590 | Shear connectors | LS A A | 1 | $89,000 |
| 3600 | Approach slab | SQYD A A | 185 | $675.00 |
| 3610 | Clearing bridge site | LS A A | 1 | $62,000 |
| 3620 | Rock soundings | LF A A | 64 | $55.00 |
| 3630 | Rock corings | LF A A | 202 | $80.00 |
| 3640 | Concrete patching repair | SQFT A A | 80 | $510.00 |
| 3650 | Concrete sealing | SQFT A A | 39,232 | $2.00 |
| 3660 | Epoxy injection crack repair | LF A A | 40 | $180.00 |
| 3670 | Finger expansion joint | LF A A | 64 | $6,050.00 |
| 3680 | Granular backfill | CUYD A A | 2,390 | $72.00 |
| 3690 | Drilled shaft - 108 in (common) | LF A A | 56 | $6,700.00 |
| 3700 | Drilled shaft - 102 in (solid rock) | LF A A | 100 | $6,425.00 |
| 3710 | Rail system single slope - 40 in | LF A A | 1,336 | $200.00 |
| 3720 | Remove concrete masonry | CUYD A A | 17 | $850.00 |
| 3730 | Foundation preparation | LS A A | 1 | $35,000 |
| 3740 | Concrete-class A | CUYD A A | 28.70 | $3,325.00 |
| 3750 | Steel reinforcement | LB A A | 2,480 | $3.50 |
| 3760 | Reference marker | EACH A A | 40 | $449.91 |
| 3770 | GMSS galv steel type A | LB A A | 14,939 | $4.88 |
| 3780 | SBM aluminum panel signs | SQFT A A | 6,466.90 | $35.48 |
| 3790 | SBM alum sheet signs .080 in | SQFT A A | 75 | $38.20 |
| 3800 | SBM alum sheet signs .125 in | SQFT A A | 879 | $41.90 |
| 3810 | Steel post type 1 | LF A A | 1,850 | $27.38 |
| 3820 | Steel post mile markers | EACH A A | 12 | $352.95 |
| 3830 | GMSS galv steel type C | LB A A | 10,294 | $9.56 |
| 3840 | Oss galv steel 70 FT truss | EACH A A | 2 | $140,041 |
| 3850 | Oss galv steel 75 FT truss | EACH A A | 1 | $180,276 |
| 3860 | Oss galv steel 85 FT truss | EACH A A | 4 | $189,729 |
| 3870 | Class A concrete for signs | CUYD A A | 367.97 | $1,082.63 |
| 3880 | Steel reinforcement for signs | LB A A | 30,173 | $2.10 |
| 3890 | Roadway cross section | EACH A A | 37 | $171.17 |
| 3900 | Barrier wall post | EACH A A | 20 | $1,763.95 |
| 3910 | GMSS type D | EACH A A | 18 | $424.91 |
| 3920 | Barcode sign inventory | EACH A A | 100 | $42.79 |
| 3930 | Mobilization | LS A A | 1 | $4,462,500 |
| 3940 | Demobilization | LS A A | 1 | $2,090,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.