KYTC contract 25-1103 bid tabulation
ASPHALT REHAB WITH BRIDGE (S) I-75. Let by Kentucky Transportation Cabinet on February 20, 2025, Madison, District 7. 1 bid received; low bid $13,501,558 by The Allen Company Inc, -5.5% against the engineer's estimate of $14,284,893.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 20 FEB 2025
- Pay items
- 116
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | The Allen Company Inc | $13,501,558 | Low | -5.0% |
Engineer's estimate: $14,284,893.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. The Allen Company Inc |
|---|---|---|---|---|
| 0010 | Dga base | TON A | 9,246 | $34.00 |
| 0020 | Asphalt seal aggregate | TON A | 1,448 | $95.00 |
| 0030 | Asphalt seal coat | TON A | 173 | $1,000.00 |
| 0040 | Leveling & wedging PG76-22 | TON A | 1,927 | $116.90 |
| 0050 | CL4 asph base 1.00D PG76-22 | TON A | 5,137 | $109.10 |
| 0060 | CL4 asph surf 0.38A PG76-22 | TON A | 53,721 | $118.85 |
| 0070 | Mobilization for mill & text | LS A | 1 | $2,695.00 |
| 0080 | Asphalt pave milling & texturing | TON A | 55,645 | $19.30 |
| 0090 | Edgeline rumble strips | LF A | 270,158 | $0.13 |
| 0100 | Joint adhesive | LF A | 511,734 | $0.42 |
| 0110 | Pave mount infrared temp equipment | SF A | 5,328,000 | $0.01 |
| 0120 | Asphalt material for tack non-tracking | TON A | 241.10 | $2.00 |
| 0130 | Crushed aggregate size no 2 | TON A | 217 | $86.90 |
| 0140 | Delineator for guardrail mono directional white | EACH A | 100 | $15.00 |
| 0150 | Delineator for guardrail mono directional yello | EACH A | 50 | $15.00 |
| 0160 | Delineator for barrier - yellow | EACH A | 142 | $20.00 |
| 0170 | Delineator for barrier wall-B/Y | EACH A | 383 | $20.00 |
| 0175 | Relocate temp conc barrier | LF A | 2,400 | $5.10 |
| 0180 | Roadway excavation | CUYD A | 544 | $40.00 |
| 0190 | Guardrail end treatment type 1 | EACH A | 3 | $4,000.00 |
| 0200 | Guardrail end treatment type 2A | EACH A | 4 | $1,200.00 |
| 0210 | Guardrail end treatment type 3 | EACH A | 1 | $2,900.00 |
| 0220 | Remove guardrail | LF A | 2,923.20 | $4.25 |
| 0230 | Channel lining class II | TON A | 1,482 | $55.85 |
| 0240 | Temporary signs | SQFT A | 1,500 | $12.75 |
| 0250 | Fabric-geotextile class 2 | SQYD A | 815 | $3.45 |
| 0260 | Maintain & control traffic | LS A | 1 | $550,000 |
| 0270 | Portable changeable message sign | EACH A | 10 | $4,250.00 |
| 0280 | Temp silt fence | LF A | 1,000 | $0.35 |
| 0290 | Silt trap type B | EACH A | 10 | $0.01 |
| 0300 | Silt trap type C | EACH A | 10 | $0.01 |
| 0310 | Staking | LS A | 1 | $20,750 |
| 0320 | Arrow panel | EACH A | 4 | $1,175.00 |
| 0322 | Relocate crash cushion | EACH A | 8 | $2,800.00 |
| 0324 | Conc barrier wall type 9T | LF A | 1,200 | $36.50 |
| 0330 | Clean roadway drains | EACH A | 9 | $1,440.00 |
| 0340 | Reference marker | EACH A | 6 | $500.00 |
| 0350 | Erosion control blanket | SQYD A | 5,000 | $2.20 |
| 0360 | Flexible delineator post-M/W | EACH A | 200 | $75.00 |
| 0370 | Flexible delineator post-M/Y | EACH A | 100 | $75.00 |
| 0380 | Steel post mile markers | EACH A | 5 | $400.00 |
| 0390 | Pave striping-temp paint-6 in | LF A | 344,654 | $0.24 |
| 0400 | Pave striping-thermo-6 in W | LF A | 197,368 | $1.02 |
| 0410 | Pave striping-thermo-6 in Y | LF A | 135,554 | $1.02 |
| 0420 | Pave striping-thermo-12 in W | LF A | 11,732 | $2.10 |
| 0430 | Pave striping-temp rem tape-B | LF A | 5,000 | $3.00 |
| 0440 | Pave striping-temp rem tape-W | LF A | 2,500 | $2.50 |
| 0450 | Pave striping-temp rem tape-Y | LF A | 2,500 | $2.50 |
| 0460 | Pave striping-dur TY 1-6 in W | LF A | 772 | $9.00 |
| 0470 | Pave striping-dur TY 1-6 in Y | LF A | 514 | $9.00 |
| 0480 | Pave marking-thermo stop bar-24IN | LF A | 88 | $12.00 |
| 0490 | Pave marking-thermo curv arrow | EACH A | 23 | $120.00 |
| 0500 | Inlaid pavement marker-B W/R | EACH A | 2,316 | $26.00 |
| 0510 | Inlaid pavement marker-B Y/R | EACH A | 201 | $26.00 |
| 0515 | Crash cushion TY VI class BT TL3 | EACH A | 4 | $5,000.00 |
| 0520 | Fuel adjustment | DOLL A | 97,941 | $1.00 |
| 0530 | Asphalt adjustment | DOLL A | 237,645 | $1.00 |
| 0540 | Object marker TY 3 | EACH A | 7 | $85.00 |
| 0550 | Law enforcement officer | HOUR A | 800 | $100.00 |
| 0560 | G/R steel W beam-S face (7 FT post) | LF A | 2,625 | $27.65 |
| 0570 | Clean | EACH A | 28 | $55.00 |
| 0580 | Pave mark thermo chevron | SQFT A | 3,382 | $4.00 |
| 0590 | Pave marking-thermo dotted lane exten | LF A | 14,431 | $2.10 |
| 0595 | Queue protection vehicle | HOUR A | 560 | $75.00 |
| 0600 | Thrie beam guardrail transition TL-3 | EACH A | 5 | $4,000.00 |
| 0610 | Thrie beam guardrail transition TL-2 | EACH A | 4 | $2,200.00 |
| 0615 | Furnish queue protection vehicles | MONT A | 7 | $6,000.00 |
| 0620 | Portable queue warning alert system | MONT A | 7 | $2,200.00 |
| 0630 | Queue warning PCMS | MONT A | 42 | $800.00 |
| 0640 | Queue warning portable radar sensors | MONT A | 42 | $0.01 |
| 0650 | Mobilization for concrete surf treatment | LS A | 1 | $3,500.00 |
| 0660 | Connected arrow panel | MONT A | 8 | $325.00 |
| 0670 | Remove concrete masonry | CUYD A | 84 | $450.00 |
| 0680 | Concrete-class A | CUYD A | 140 | $1,075.00 |
| 0690 | Steel reinforcement | LB A | 9,424 | $3.75 |
| 0700 | Remove conc median barrier | LF A | 50 | $300.00 |
| 0710 | Concrete sealing | SQFT A | 2,560 | $4.00 |
| 0720 | Remove concrete masonry | CUYD A | 3 | $780.00 |
| 0730 | Concrete-class AA | CUYD A | 3 | $3,000.00 |
| 0740 | Steel reinforcement-epoxy coated | LB A | 418 | $5.75 |
| 0750 | Concrete sealing | SQFT A | 97 | $4.00 |
| 0760 | Remove concrete masonry | CUYD A | 73 | $550.00 |
| 0770 | Concrete-class A | CUYD A | 260 | $1,050.00 |
| 0780 | Steel reinforcement | LB A | 20,239 | $2.80 |
| 0790 | Remove conc median barrier | LF A | 50 | $300.00 |
| 0800 | Concrete sealing | SQFT A | 4,980 | $3.00 |
| 0810 | Remove concrete masonry | CUYD A | 69 | $500.00 |
| 0820 | Concrete-class A | CUYD A | 155 | $1,100.00 |
| 0830 | Steel reinforcement | LB A | 8,728 | $3.75 |
| 0840 | Remove conc median barrier | LF A | 50 | $300.00 |
| 0850 | Concrete sealing | SQFT A | 2,590 | $4.00 |
| 0860 | Remove concrete masonry | CUYD A | 17 | $400.00 |
| 0870 | Concrete-class A | CUYD A | 110 | $1,345.00 |
| 0880 | Steel reinforcement | LB A | 8,658 | $3.75 |
| 0890 | Remove conc median barrier | LF A | 50 | $300.00 |
| 0900 | Concrete sealing | SQFT A | 2,440 | $3.50 |
| 0910 | SBM alum sheet signs .125 in | SQFT A | 330.75 | $45.00 |
| 0920 | Steel post type 1 | LF A | 291 | $45.00 |
| 0930 | Class A concrete for signs | CUYD A | 4.60 | $1,000.00 |
| 0940 | GMSS type D | EACH A | 20 | $1,000.00 |
| 0950 | Install sign post reflectors | EACH A | 26 | $100.00 |
| 0960 | Barcode sign inventory | EACH A | 32 | $45.00 |
| 0970 | Pave mark thermo-wrong way arrow | EACH A | 10 | $325.00 |
| 0980 | Remove signal equipment | EACH A | 3 | $2,008.40 |
| 0990 | Install radar presence detector type A | EACH A | 9 | $1,043.92 |
| 1000 | Conduit-1 1/4 in | LF A | 240 | $15.31 |
| 1010 | Conduit-2 in | LF A | 60 | $20.10 |
| 1020 | Trenching and backfilling | LF A | 270 | $7.59 |
| 1030 | Piezoelectric sensor | EACH A | 18 | $1,949.19 |
| 1040 | Loop wire | LF A | 7,950 | $0.85 |
| 1050 | Loop saw slot and fill | LF A | 1,800 | $14.47 |
| 1060 | Galvanized steel cabinet | EACH A | 6 | $867.47 |
| 1070 | Wood post | EACH A | 12 | $488.46 |
| 1080 | Electrical junction box type A | EACH A | 6 | $1,445.53 |
| 1090 | Mobilization | LS A | 1 | $618,120 |
| 1100 | Demobilization | LS A | 1 | $185,440 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of February 20, 2025. Compiled by Mirage Metrics.