KYTC contract 25-1107 bid tabulation
ASPHALT REHAB WITH BRIDGE (S) BG-9002. Let by Kentucky Transportation Cabinet on April 24, 2025, Nelson, District 4. 2 bids received; low bid $11,660,410 by Mago Construction Company LLC, -22% against the engineer's estimate of $14,865,226.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 APR 2025
- Pay items
- 104
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Mago Construction Company LLC | $11,660,410 | Low | -22% |
| 2 | Louisville Paving Company Inc | $11,898,500 | +2.0% | -20% |
Engineer's estimate: $14,865,226.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mago Construction Company LLC | 2. Louisville Paving Company Inc |
|---|---|---|---|---|---|
| 0010 | Dga base | TON A | 9,092 | $34.72 | $40.00 |
| 0020 | Asphalt seal aggregate | TON A | 1,507 | $83.00 | $88.00 |
| 0030 | Asphalt seal coat | TON A | 181.20 | $890.00 | $850.00 |
| 0040 | Leveling & wedging PG64-22 | TON A | 1,000 | $84.06 | $80.00 |
| 0050 | CL3 asph base 1.00D PG64-22 | TON A | 5,895 | $75.54 | $72.00 |
| 0060 | CL3 asph surf 0.38D PG64-22 | TON A | 50,295 | $83.09 | $80.00 |
| 0070 | Mobilization for mill & text | LS A | 1 | $12,000 | $10,000 |
| 0080 | Asphalt pave milling & texturing | TON A | 63,811 | $4.05 | $3.50 |
| 0090 | Edgeline rumble strips | LF A | 243,255 | $0.17 | $0.13 |
| 0100 | Joint adhesive | LF A | 240,768 | $0.38 | $0.36 |
| 0110 | Remove traffic island | SQYD A | 196 | $41.00 | $96.00 |
| 0120 | CL3 asph surf 0.38A PG64-22 | TON A | 30,609 | $85.11 | $85.00 |
| 0130 | Pave mount infrared temp equipment | SF A | 3,198,159 | $0.01 | $0.01 |
| 0140 | Asphalt material for tack non-tracking | TON A | 355.60 | $1.00 | $0.01 |
| 0150 | Crushed aggregate size no 2 | TON A | 71 | $340.00 | $77.00 |
| 0160 | Asphalt wedge curb | LF A | 835 | $35.00 | $47.00 |
| 0170 | Delineator for guardrail mono directional white | EACH A | 150 | $15.00 | $15.00 |
| 0180 | Delineator for guardrail mono directional yello | EACH A | 50 | $15.00 | $15.00 |
| 0185 | Relocate temp conc barrier | LF A | 4,800 | $20.00 | $15.62 |
| 0190 | Barricade-type III | EACH A | 8 | $100.00 | $100.00 |
| 0200 | Roadway excavation | CUYD A | 385 | $50.00 | $37.00 |
| 0210 | Guardrail end treatment type 1 | EACH A | 6 | $3,900.00 | $3,900.00 |
| 0220 | Guardrail end treatment type 2A | EACH A | 12 | $1,500.00 | $1,500.00 |
| 0230 | Remove guardrail | LF A | 5,536.50 | $5.00 | $5.00 |
| 0240 | Channel lining class II | TON A | 100 | $48.00 | $115.00 |
| 0250 | Temporary signs | SQFT A | 1,000 | $5.00 | $5.00 |
| 0260 | Maintain & control traffic | LS A | 1 | $360,000 | $150,000 |
| 0270 | Truck mounted attenuator | EACH A | 1 | $13,410 | $7,500.00 |
| 0280 | Portable changeable message sign | EACH A | 4 | $3,498.00 | $3,180.00 |
| 0290 | Temp silt fence | LF A | 1,000 | $3.85 | $4.00 |
| 0300 | Silt trap type B | EACH A | 10 | $220.00 | $220.00 |
| 0310 | Silt trap type C | EACH A | 10 | $220.00 | $350.00 |
| 0320 | Staking | LS A | 1 | $15,000 | $15,000 |
| 0325 | Relocate crash cushion | EACH A | 16 | $3,900.00 | $3,900.00 |
| 0326 | Conc barrier wall type 9T | LF A | 1,200 | $45.00 | $32.15 |
| 0330 | Remove lighting | LS A | 1 | $7,500.00 | $10,611 |
| 0340 | Erosion control blanket | SQYD A | 4,669 | $2.20 | $2.20 |
| 0350 | Initial fertilizer | TON A | 0.50 | $1,500.00 | $1,500.00 |
| 0360 | Maintenance fertilizer | TON A | 0.50 | $1,500.00 | $1,500.00 |
| 0370 | Agricultural limestone | TON A | 2.20 | $85.00 | $85.00 |
| 0380 | Flexible delineator post-M/W | EACH A | 100 | $95.00 | $95.00 |
| 0390 | Flexible delineator post-M/Y | EACH A | 50 | $95.00 | $95.00 |
| 0400 | Pave striping-temp paint-6 in | LF A | 261,536 | $0.26 | $0.26 |
| 0410 | Pave striping-thermo-6 in W | LF A | 150,998 | $1.05 | $1.05 |
| 0420 | Pave striping-thermo-6 in Y | LF A | 121,916 | $1.05 | $1.05 |
| 0430 | Pave striping-thermo-12 in W | LF A | 2,535 | $2.40 | $2.40 |
| 0440 | Pave striping-temp rem tape-B | LF A | 5,000 | $2.75 | $2.75 |
| 0450 | Pave striping-temp rem tape-W | LF A | 2,500 | $2.50 | $2.50 |
| 0460 | Pave striping-temp rem tape-Y | LF A | 2,500 | $2.50 | $2.50 |
| 0470 | Pave marking-thermo stop bar-24IN | LF A | 112 | $10.00 | $10.00 |
| 0480 | Inlaid pavement marker-B W/R | EACH A | 1,643 | $27.00 | $30.00 |
| 0490 | Inlaid pavement marker-B Y/R | EACH A | 67 | $27.00 | $30.00 |
| 0495 | Crash cushion TY VI class BT TL3 | EACH A | 4 | $5,200.00 | $5,200.00 |
| 0500 | Fuel adjustment | DOLL A | 139,775 | $1.00 | $1.00 |
| 0510 | Asphalt adjustment | DOLL A | 343,259 | $1.00 | $1.00 |
| 0520 | Rem asphalt wedge curb | LF A | 873 | $3.00 | $20.57 |
| 0530 | Law enforcement officer | HOUR A | 250 | $75.00 | $120.00 |
| 0540 | Remove crash cushion | EACH A | 10 | $950.00 | $950.00 |
| 0550 | Thrie beam to W beam connector | EACH A | 2 | $350.00 | $350.00 |
| 0560 | Guardrail thrie beam | LF A | 587.50 | $72.00 | $72.00 |
| 0570 | G/R steel W beam-S face (7 FT post) | LF A | 4,837.50 | $30.95 | $30.95 |
| 0580 | Remove concrete median barrier end | EACH A | 10 | $5,500.00 | $3,000.00 |
| 0590 | Object marker type 1 | EACH A | 14 | $430.00 | $430.00 |
| 0600 | Pave mark thermo chevron | SQFT A | 800 | $6.00 | $6.00 |
| 0610 | Pave marking-thermo dotted lane exten | LF A | 755 | $5.00 | $5.00 |
| 0620 | Thrie beam guardrail transition TL-3 | EACH A | 7 | $4,450.00 | $3,300.00 |
| 0630 | Thrie beam guardrail transition TL-2 | EACH A | 5 | $3,450.00 | $2,200.00 |
| 0640 | Portable queue warning alert system | MONT A | 5 | $1,484.00 | $1,696.00 |
| 0650 | Queue warning PCMS | MONT A | 30 | $530.00 | $530.00 |
| 0660 | Queue warning portable radar sensors | MONT A | 30 | $265.00 | $1.00 |
| 0670 | Mobilization for concrete surf treatment | LS A | 1 | $4,000.00 | $1.00 |
| 0680 | Thrie beam bullnose terminal | EACH A | 10 | $25,000 | $25,000 |
| 0690 | Connected arrow panel | MONT A | 10 | $450.00 | $450.00 |
| 0700 | Culvert pipe-18 in | LF A | 16 | $220.00 | $152.00 |
| 0710 | S & F box inlet-outlet-18 in | EACH A | 1 | $4,100.00 | $9,200.00 |
| 0720 | Drop box inlet type 1 | EACH A | 1 | $5,875.00 | $3,800.00 |
| 0730 | Cap drop box inlet | EACH A | 1 | $1,850.00 | $12,800 |
| 0740 | Flume inlet type 2 | EACH A | 3 | $8,225.00 | $10,340 |
| 0750 | Channel lining class III | TON A | 105 | $57.00 | $115.00 |
| 0760 | Replace grate | EACH A | 5 | $1,050.00 | $985.00 |
| 0770 | Concrete-class A | CUYD A | 134 | $1,100.00 | $1,629.46 |
| 0780 | Steel reinforcement | LB A | 10,185 | $2.00 | $2.05 |
| 0790 | Remove barrier | LF A | 15 | $300.00 | $350.00 |
| 0800 | Concrete sealing | SQFT A | 3,560 | $4.00 | $2.25 |
| 0810 | Remove concrete masonry | CUYD A | 8 | $400.00 | $450.00 |
| 0820 | Concrete-class A | CUYD A | 65 | $1,100.00 | $1,911.26 |
| 0830 | Steel reinforcement | LB A | 5,334 | $2.00 | $2.15 |
| 0840 | Concrete sealing | SQFT A | 1,440 | $4.00 | $2.75 |
| 0850 | Remove concrete masonry | CUYD A | 12 | $400.00 | $450.00 |
| 0860 | Concrete-class A | CUYD A | 77 | $1,100.00 | $2,026.36 |
| 0870 | Steel reinforcement | LB A | 5,886 | $2.00 | $2.13 |
| 0880 | Remove barrier | LF A | 15 | $300.00 | $350.00 |
| 0890 | Concrete sealing | SQFT A | 1,640 | $4.00 | $2.35 |
| 0900 | Remove concrete masonry | CUYD A | 6 | $400.00 | $450.00 |
| 0910 | Concrete-class A | CUYD A | 40 | $1,100.00 | $2,451.46 |
| 0920 | Steel reinforcement | LB A | 3,406 | $2.00 | $2.23 |
| 0930 | Concrete sealing | SQFT A | 820 | $4.00 | $3.00 |
| 0940 | Remove concrete masonry | CUYD A | 23 | $400.00 | $450.00 |
| 0950 | Concrete-class A | CUYD A | 75 | $1,100.00 | $1,998.16 |
| 0960 | Steel reinforcement | LB A | 6,152 | $2.00 | $2.15 |
| 0970 | Remove barrier | LF A | 15 | $300.00 | $350.00 |
| 0980 | Concrete sealing | SQFT A | 1,710 | $4.00 | $2.50 |
| 0990 | Mobilization | LS A | 1 | $142,731 | $481,648 |
| 1000 | Demobilization | LS A | 1 | $164,000 | $178,478 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of April 24, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.