KYTC contract 25-1109 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE US 68. Let by Kentucky Transportation Cabinet on June 5, 2025. 1 bid received; low bid $13,691,645 by Haydon Materials LLC, -3.7% against the engineer's estimate of $14,221,384.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 05 JUN 2025
- Pay items
- 116
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Haydon Materials LLC | $13,691,645 | Low | -4.0% |
Engineer's estimate: $14,221,384.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Haydon Materials LLC |
|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 26,921 | $31.44 |
| 0020 | Crushed aggregate size no 2 | TON A A | 3,241 | $32.00 |
| 0030 | Asphalt seal aggregate | TON A A | 399 | $76.25 |
| 0040 | Asphalt seal coat | TON A A | 38 | $995.01 |
| 0050 | Leveling & wedging PG64-22 | TON A A | 7,428 | $100.00 |
| 0055 | CL2 asph base 1.00D PG64-22 | TON A A | 2,264 | $88.00 |
| 0060 | CL3 asph base 0.75D PG64-22 | TON A A | 47,720 | $88.00 |
| 0070 | CL3 asph surf 0.38B PG64-22 | TON A A | 22,192 | $95.00 |
| 0080 | JPC pavement-8 in | SQYD A A | 916 | $122.71 |
| 0100 | Asphalt material for tack non-tracking | TON A A | 86 | $700.00 |
| 0105 | Lime | TON A A | 21.70 | $85.00 |
| 0110 | Entrance pipe-15 in | LF A A | 204 | $90.00 |
| 0120 | Entrance pipe-18 in | LF A A | 169 | $95.00 |
| 0130 | Entrance pipe-24 in | LF A A | 48 | $110.00 |
| 0140 | Remove pipe | LF A A | 4 | $100.00 |
| 0150 | Flume inlet type 1 | EACH A A | 5 | $6,200.57 |
| 0160 | Flume inlet type 2 | EACH A A | 5 | $6,900.71 |
| 0175 | Standard curb and gutter mod | LF A A | 3,565 | $36.90 |
| 0190 | Standard header curb | LF A A | 358 | $25.65 |
| 0195 | Asphalt wedge curb | LF A A | 1,965 | $18.00 |
| 0197 | Cem conc ent pavement-8 in | SQYD A A | 354 | $116.73 |
| 0200 | Delineator for guardrail BI directional white | EACH A A | 195 | $13.25 |
| 0210 | Barricade-type III | EACH A A | 8 | $100.00 |
| 0220 | Cement concrete island | SQYD A A | 1,198 | $73.70 |
| 0230 | Roadway excavation | CUYD A A | 7,630 | $32.50 |
| 0240 | Granular embankment | CUYD A A | 6,280 | $58.00 |
| 0250 | Ditching | LF A A | 1,375 | $9.00 |
| 0260 | Guardrail terminal section no 1 | EACH A A | 11 | $77.57 |
| 0270 | Guardrail end treatment type 1 | EACH A A | 46 | $3,252.24 |
| 0280 | Remove guardrail | LF A A | 15,350 | $2.67 |
| 0285 | Channel lining class II | TON A A | 3,000 | $38.50 |
| 0290 | Clearing and grubbing | LS A A | 1 | $3,500.00 |
| 0295 | Concrete-class B | CUYD A A | 225.50 | $399.45 |
| 0300 | Temporary signs | SQFT A A | 426 | $4.00 |
| 0310 | Edge key | LF A A | 1,907 | $21.00 |
| 0320 | Fabric-geotextile class 1 | SQYD A A | 50,784 | $2.00 |
| 0330 | Fabric-geotextile class 2 for pipe | SQYD A A | 1,173 | $2.00 |
| 0340 | Maintain & control traffic | LS A A | 1 | $294,000 |
| 0350 | Maintain & control traffic | LS A A | 1 | $304,000 |
| 0360 | Portable changeable message sign | EACH A A | 8 | $7,632.00 |
| 0370 | Safeloading | CUYD A A | 4.84 | $1,000.00 |
| 0390 | Staking | LS A A | 1 | $125,000 |
| 0400 | Staking | LS A A | 1 | $125,000 |
| 0410 | Temp signal | LS A A | 1 | $12,500 |
| 0420 | Temp signal | LS A A | 1 | $12,500 |
| 0430 | Erosion control blanket | SQYD A A | 1,375 | $2.45 |
| 0440 | Temp mulch | SQYD A A | 35,129 | $0.33 |
| 0450 | Temp seeding and protection | SQYD A A | 35,129 | $0.35 |
| 0455 | Fertilizer 10-10-10 | TON A A | 5.50 | $1,500.00 |
| 0460 | Seeding and protection | SQYD A A | 35,129 | $0.64 |
| 0465 | Topsoil furnished and placed | CUYD A A | 580 | $78.34 |
| 0470 | Pave striping-temp paint-6 in | LF A A | 950,000 | $0.01 |
| 0480 | Pave marking-thermo stop bar-24IN | LF A A | 48 | $12.00 |
| 0490 | Pave marking-thermo curv arrow | EACH A A | 52 | $120.00 |
| 0500 | Pave marking-thermo merge arrow | EACH A A | 18 | $300.00 |
| 0502 | Inlaid pavement marker-MW | EACH A A | 296 | $26.00 |
| 0504 | Inlaid pavement marker-by | EACH A A | 1,186 | $26.00 |
| 0510 | Fuel adjustment | DOLL A A | 143,857 | $1.00 |
| 0520 | Asphalt adjustment | DOLL A A | 277,842 | $1.00 |
| 0530 | Saw cut | LF A A | 4,360 | $4.00 |
| 0540 | Longitudinal edge key | LF A A | 4,360 | $3.19 |
| 0550 | Embankment | CUYD A A | 17,300 | $4.00 |
| 0560 | Excavation | CUYD A A | 3,690 | $27.50 |
| 0570 | G/R steel W beam-S face (7 FT post) | LF A A | 13,100 | $29.32 |
| 0580 | Pave marking-thermo yield bar-36 in | LF A A | 48 | $35.00 |
| 0590 | Water blasting existing stripe | LF A A | 225,000 | $0.50 |
| 0600 | Detectable warnings | SQFT A A | 285 | $50.06 |
| 0610 | Remove thermoplastic arrows | EACH A A | 35 | $100.00 |
| 0620 | Clean slope | LF A A | 400 | $18.00 |
| 0630 | Roundabout arrow | EACH A A | 8 | $450.00 |
| 0635 | Island curb and gutter(modified) | LF A A | 566 | $28.97 |
| 0640 | Pave marking-thermo dotted lane exten | LF A A | 120 | $7.00 |
| 0650 | Remove signal equipment | EACH A A | 2 | $12,000 |
| 0660 | Pave striping-spray thermo-6 in W | LF A A | 94,378 | $0.75 |
| 0670 | Pave striping-spray thermo-6 in Y | LF A A | 117,071 | $0.75 |
| 0675 | Groove for pave striping - 7 in | LF A A | 19,974 | $0.95 |
| 0680 | Sinusoidal rumble strips | LF A A | 143,484 | $0.40 |
| 0690 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.01 |
| 0700 | Culvert pipe-18 in | LF A A | 18 | $175.00 |
| 0710 | Culvert pipe-24 in | LF A A | 45 | $185.00 |
| 0720 | Pipe culvert headwall-18 in | EACH A A | 1 | $1,500.00 |
| 0730 | Pipe culvert headwall-24 in | EACH A A | 2 | $1,700.00 |
| 0740 | Remove culvert pipe headwall | EACH A A | 3 | $900.00 |
| 0750 | Remove signal equipment | EACH A A | 2 | $12,000 |
| 0760 | Pole 40 FT MTG HT | EACH A A | 26 | $2,500.00 |
| 0770 | Bracket 8 FT | EACH A A | 12 | $250.00 |
| 0780 | Bracket 10 FT | EACH A A | 4 | $400.00 |
| 0790 | Bracket 12 FT | EACH A A | 10 | $500.00 |
| 0800 | Pole base | EACH A A | 26 | $2,917.00 |
| 0810 | Transformer base | EACH A A | 26 | $1,500.00 |
| 0820 | Lighting control equipment | EACH A A | 2 | $10,000 |
| 0830 | Fused connector kit | EACH A A | 52 | $150.00 |
| 0840 | Trenching and backfilling | LF A A | 3,225 | $10.81 |
| 0850 | Wire-no. 12 | LF A A | 4,075 | $0.21 |
| 0860 | Pole 45 FT wooden | EACH A A | 2 | $3,500.00 |
| 0870 | Remove lighting | LS A A | 1 | $11,000 |
| 0880 | Electrical junction box type A | EACH A A | 4 | $3,000.00 |
| 0890 | Temporary lighting | LS A A | 1 | $13,000 |
| 0900 | Temporary lighting | LS A A | 1 | $13,000 |
| 0910 | Bore and jack conduit | LF A A | 670 | $12.90 |
| 0920 | Wire-no. 10 | LF A A | 6,175 | $0.61 |
| 0930 | LED luminaire | EACH A A | 26 | $1,500.00 |
| 0940 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 3,060 | $1.09 |
| 0950 | PVC conduit-2 in-schedule 80 | LF A A | 965 | $1.86 |
| 0960 | Tree | EACH A A | 6 | $575.35 |
| 0970 | Shrub | EACH A A | 9 | $159.20 |
| 0980 | Shrub | EACH A A | 27 | $123.36 |
| 0990 | Shrub | EACH A A | 3 | $159.20 |
| 1000 | Shrub | EACH A A | 66 | $159.20 |
| 1010 | Shrub | EACH A A | 24 | $126.62 |
| 1020 | Container plants | EACH A A | 63 | $134.77 |
| 1030 | Container plants | EACH A A | 27 | $94.04 |
| 1040 | Container plants | EACH A A | 111 | $77.75 |
| 1050 | Decorative rock | SQFT A A | 3,000 | $6.13 |
| 1060 | Mobilization | LS A A | 1 | $471,161 |
| 1070 | Demobilization | LS A A | 1 | $194,402 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of June 5, 2025. Compiled by Mirage Metrics.