KYTC contract 25-1109 bid tabulation

GRADE & DRAIN WITH ASPHALT SURFACE US 68. Let by Kentucky Transportation Cabinet on June 5, 2025. 1 bid received; low bid $13,691,645 by Haydon Materials LLC, -3.7% against the engineer's estimate of $14,221,384.

Owner
Kentucky Transportation Cabinet
Letting
05 JUN 2025
Pay items
116
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Haydon Materials LLC$13,691,645Low-4.0%
KYTC contract 25-1109: bids by rank

Engineer's estimate: $14,221,384.

Bid tabulation

LinePay itemUnitQuantity1. Haydon Materials LLC
0010Crushed stone baseTON A A26,921$31.44
0020Crushed aggregate size no 2TON A A3,241$32.00
0030Asphalt seal aggregateTON A A399$76.25
0040Asphalt seal coatTON A A38$995.01
0050Leveling & wedging PG64-22TON A A7,428$100.00
0055CL2 asph base 1.00D PG64-22TON A A2,264$88.00
0060CL3 asph base 0.75D PG64-22TON A A47,720$88.00
0070CL3 asph surf 0.38B PG64-22TON A A22,192$95.00
0080JPC pavement-8 inSQYD A A916$122.71
0100Asphalt material for tack non-trackingTON A A86$700.00
0105LimeTON A A21.70$85.00
0110Entrance pipe-15 inLF A A204$90.00
0120Entrance pipe-18 inLF A A169$95.00
0130Entrance pipe-24 inLF A A48$110.00
0140Remove pipeLF A A4$100.00
0150Flume inlet type 1EACH A A5$6,200.57
0160Flume inlet type 2EACH A A5$6,900.71
0175Standard curb and gutter modLF A A3,565$36.90
0190Standard header curbLF A A358$25.65
0195Asphalt wedge curbLF A A1,965$18.00
0197Cem conc ent pavement-8 inSQYD A A354$116.73
0200Delineator for guardrail BI directional whiteEACH A A195$13.25
0210Barricade-type IIIEACH A A8$100.00
0220Cement concrete islandSQYD A A1,198$73.70
0230Roadway excavationCUYD A A7,630$32.50
0240Granular embankmentCUYD A A6,280$58.00
0250DitchingLF A A1,375$9.00
0260Guardrail terminal section no 1EACH A A11$77.57
0270Guardrail end treatment type 1EACH A A46$3,252.24
0280Remove guardrailLF A A15,350$2.67
0285Channel lining class IITON A A3,000$38.50
0290Clearing and grubbingLS A A1$3,500.00
0295Concrete-class BCUYD A A225.50$399.45
0300Temporary signsSQFT A A426$4.00
0310Edge keyLF A A1,907$21.00
0320Fabric-geotextile class 1SQYD A A50,784$2.00
0330Fabric-geotextile class 2 for pipeSQYD A A1,173$2.00
0340Maintain & control trafficLS A A1$294,000
0350Maintain & control trafficLS A A1$304,000
0360Portable changeable message signEACH A A8$7,632.00
0370SafeloadingCUYD A A4.84$1,000.00
0390StakingLS A A1$125,000
0400StakingLS A A1$125,000
0410Temp signalLS A A1$12,500
0420Temp signalLS A A1$12,500
0430Erosion control blanketSQYD A A1,375$2.45
0440Temp mulchSQYD A A35,129$0.33
0450Temp seeding and protectionSQYD A A35,129$0.35
0455Fertilizer 10-10-10TON A A5.50$1,500.00
0460Seeding and protectionSQYD A A35,129$0.64
0465Topsoil furnished and placedCUYD A A580$78.34
0470Pave striping-temp paint-6 inLF A A950,000$0.01
0480Pave marking-thermo stop bar-24INLF A A48$12.00
0490Pave marking-thermo curv arrowEACH A A52$120.00
0500Pave marking-thermo merge arrowEACH A A18$300.00
0502Inlaid pavement marker-MWEACH A A296$26.00
0504Inlaid pavement marker-byEACH A A1,186$26.00
0510Fuel adjustmentDOLL A A143,857$1.00
0520Asphalt adjustmentDOLL A A277,842$1.00
0530Saw cutLF A A4,360$4.00
0540Longitudinal edge keyLF A A4,360$3.19
0550EmbankmentCUYD A A17,300$4.00
0560ExcavationCUYD A A3,690$27.50
0570G/R steel W beam-S face (7 FT post)LF A A13,100$29.32
0580Pave marking-thermo yield bar-36 inLF A A48$35.00
0590Water blasting existing stripeLF A A225,000$0.50
0600Detectable warningsSQFT A A285$50.06
0610Remove thermoplastic arrowsEACH A A35$100.00
0620Clean slopeLF A A400$18.00
0630Roundabout arrowEACH A A8$450.00
0635Island curb and gutter(modified)LF A A566$28.97
0640Pave marking-thermo dotted lane extenLF A A120$7.00
0650Remove signal equipmentEACH A A2$12,000
0660Pave striping-spray thermo-6 in WLF A A94,378$0.75
0670Pave striping-spray thermo-6 in YLF A A117,071$0.75
0675Groove for pave striping - 7 inLF A A19,974$0.95
0680Sinusoidal rumble stripsLF A A143,484$0.40
0690Electronic delivery MGMT system - aggLS A A1$0.01
0700Culvert pipe-18 inLF A A18$175.00
0710Culvert pipe-24 inLF A A45$185.00
0720Pipe culvert headwall-18 inEACH A A1$1,500.00
0730Pipe culvert headwall-24 inEACH A A2$1,700.00
0740Remove culvert pipe headwallEACH A A3$900.00
0750Remove signal equipmentEACH A A2$12,000
0760Pole 40 FT MTG HTEACH A A26$2,500.00
0770Bracket 8 FTEACH A A12$250.00
0780Bracket 10 FTEACH A A4$400.00
0790Bracket 12 FTEACH A A10$500.00
0800Pole baseEACH A A26$2,917.00
0810Transformer baseEACH A A26$1,500.00
0820Lighting control equipmentEACH A A2$10,000
0830Fused connector kitEACH A A52$150.00
0840Trenching and backfillingLF A A3,225$10.81
0850Wire-no. 12LF A A4,075$0.21
0860Pole 45 FT woodenEACH A A2$3,500.00
0870Remove lightingLS A A1$11,000
0880Electrical junction box type AEACH A A4$3,000.00
0890Temporary lightingLS A A1$13,000
0900Temporary lightingLS A A1$13,000
0910Bore and jack conduitLF A A670$12.90
0920Wire-no. 10LF A A6,175$0.61
0930LED luminaireEACH A A26$1,500.00
0940PVC conduit-1 1/4 in-schedule 80LF A A3,060$1.09
0950PVC conduit-2 in-schedule 80LF A A965$1.86
0960TreeEACH A A6$575.35
0970ShrubEACH A A9$159.20
0980ShrubEACH A A27$123.36
0990ShrubEACH A A3$159.20
1000ShrubEACH A A66$159.20
1010ShrubEACH A A24$126.62
1020Container plantsEACH A A63$134.77
1030Container plantsEACH A A27$94.04
1040Container plantsEACH A A111$77.75
1050Decorative rockSQFT A A3,000$6.13
1060MobilizationLS A A1$471,161
1070DemobilizationLS A A1$194,402
KYTC contract 25-1109: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of June 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy