KYTC contract 25-1312 bid tabulation
ASPHALT SURFACE WITH GRADE & DRAIN KY246 / KY176 INTERSECTION. Let by Kentucky Transportation Cabinet on July 24, 2025. 1 bid received; low bid $2,865,925 by Scotty'S Contracting & Stone LLC, +5.0% against the engineer's estimate of $2,728,603.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 24 JUL 2025
- Pay items
- 93
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scotty'S Contracting & Stone LLC | $2,865,925 | Low | +5.0% |
Engineer's estimate: $2,728,603.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty'S Contracting & Stone LLC |
|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 3,231 | $36.41 |
| 0020 | Crushed aggregate size no 2 | TON A A | 4,826 | $38.40 |
| 0030 | Asphalt seal aggregate | TON A A | 27 | $325.95 |
| 0040 | Asphalt seal coat | TON A A | 4 | $1,038.59 |
| 0050 | CL2 asph base 1.00D PG64-22 | TON A A | 1,637 | $121.13 |
| 0060 | CL2 asph surf 0.38D PG64-22 | TON A A | 479 | $158.65 |
| 0070 | Fabric-geotextile class 1 | SQYD A A | 6,347 | $2.24 |
| 0080 | Fabric-geotextile class 1A | SQYD A A | 6,754 | $3.58 |
| 0090 | Joint adhesive | LF A A | 1,409 | $3.00 |
| 0100 | Asphalt material for tack non-tracking | TON A A | 5 | $794.62 |
| 0110 | Delineator for guardrail BI directional white | EACH A A | 10 | $17.88 |
| 0120 | Barricade-type III | EACH A A | 10 | $341.85 |
| 0130 | Remove pavement | SQYD A A | 135 | $2.99 |
| 0140 | Temp ditch | LF A A | 705 | $3.38 |
| 0150 | Clean temp ditch | LF A A | 353 | $0.27 |
| 0160 | Roadway excavation | CUYD A A | 20,791 | $20.34 |
| 0190 | Water | MGAL A A | 50 | $113.95 |
| 0200 | Guardrail-steel W beam-S face | LF A A | 775 | $39.15 |
| 0210 | Guardrail terminal section no 1 | EACH A A | 5 | $90.38 |
| 0220 | Guardrail end treatment type 1 | EACH A A | 1 | $4,082.91 |
| 0230 | Remove guardrail | LF A A | 440 | $4.84 |
| 0240 | Right-of-way monument type 1 | EACH A A | 20 | $166.61 |
| 0250 | Witness post | EACH A A | 3 | $150.06 |
| 0260 | Channel lining class II | TON A A | 363 | $47.85 |
| 0270 | Clearing and grubbing | LS A A | 1 | $43,717 |
| 0290 | Temporary signs | SQFT A A | 1,046 | $10.07 |
| 0300 | Edge key | LF A A | 70 | $58.07 |
| 0320 | Fabric-geotextile class 2 for pipe | SQYD A A | 770 | $2.00 |
| 0330 | Maintain & control traffic | LS A A | 1 | $56,873 |
| 0340 | Diversions (by-pass detours) | LS A A | 1 | $47,982 |
| 0350 | Portable changeable message sign | EACH A A | 3 | $5,811.45 |
| 0360 | Edgeline rumble strips | LF A A | 2,840 | $2.49 |
| 0370 | Temp silt fence | LF A A | 705 | $2.85 |
| 0380 | Silt trap type A | EACH A A | 4 | $332.15 |
| 0390 | Silt trap type B | EACH A A | 4 | $327.87 |
| 0400 | Silt trap type C | EACH A A | 4 | $364.19 |
| 0410 | Clean silt trap type A | EACH A A | 4 | $22.77 |
| 0420 | Clean silt trap type B | EACH A A | 4 | $11.38 |
| 0430 | Clean silt trap type C | EACH A A | 4 | $15.27 |
| 0440 | Staking | LS A A | 1 | $12,990 |
| 0450 | Temp signal 2 phase | EACH A A | 3 | $13,409 |
| 0460 | Erosion control blanket | SQYD A A | 1,333 | $2.15 |
| 0470 | Temp mulch | SQYD A A | 10,325 | $0.30 |
| 0480 | Temp seeding and protection | SQYD A A | 7,744 | $0.39 |
| 0490 | Initial fertilizer | TON A A | 1.10 | $1,925.00 |
| 0500 | Maintenance fertilizer | TON A A | 0.60 | $2,750.00 |
| 0510 | Seeding and protection | SQYD A A | 10,019 | $0.55 |
| 0520 | Agricultural limestone | TON A A | 7 | $82.50 |
| 0530 | Pave striping-temp paint-4 in | LF A A | 884 | $1.25 |
| 0540 | Pave striping-perm paint-6 in | LF A A | 5,319 | $0.40 |
| 0550 | Pave marking-thermo stop bar-24IN | LF A A | 36 | $25.00 |
| 0560 | Fuel adjustment | DOLL A A | 2,674 | $1.00 |
| 0570 | Pave mark temp paint stop bar | LF A A | 33 | $15.00 |
| 0580 | Object marker TY 3 | EACH A A | 1 | $32.50 |
| 0590 | Electronic delivery MGMT system - agg | LS A A | 1 | $1.08 |
| 0600 | Entrance pipe-18 in | LF A A | 399 | $58.95 |
| 0610 | Culvert pipe-24 in | LF A A | 51 | $160.27 |
| 0620 | Pipeline inspection | LF A A | 251 | $9.96 |
| 0630 | Sloped and mitered headwall-24 in | EACH A A | 2 | $3,000.00 |
| 0640 | Structure granular backfill | CUYD A A | 1,945 | $68.00 |
| 0650 | Foundation preparation | LS A A | 1 | $134,579 |
| 0660 | Pre-drilling for piles | LF A A | 440 | $525.00 |
| 0670 | Piles-steel HP14X117 | LF A A | 1,454 | $131.00 |
| 0680 | Concrete-class A | CUYD A A | 91.10 | $3,500.00 |
| 0690 | Steel reinforcement | LB A A | 12,360 | $1.90 |
| 0700 | Concrete form liner | SQYD A A | 210 | $85.00 |
| 0710 | W cap existing main | EACH A A | 2 | $3,815.00 |
| 0720 | W cap existing main | EACH A A | 1 | $3,385.00 |
| 0730 | W cap existing main | EACH A A | 2 | $3,495.00 |
| 0740 | W encasement steel bored range 1 | LF A A | 70 | $490.00 |
| 0750 | W encasement steel bored range 1 | LF A A | 60 | $145.00 |
| 0760 | W fire hydrant assembly | EACH A A | 2 | $11,595 |
| 0770 | W fire hydrant remove | EACH A A | 1 | $510.00 |
| 0780 | W meter relocate | EACH A A | 8 | $2,365.00 |
| 0790 | W pipe PVC 02 inch | LF A A | 60 | $46.00 |
| 0800 | W pipe PVC 03 inch | LF A A | 495 | $46.00 |
| 0810 | W pipe PVC 06 inch | LF A A | 90 | $62.00 |
| 0820 | W pipe PVC 06 inch | LF A A | 880 | $68.00 |
| 0830 | W pipe PVC 10 inch | LF A A | 240 | $112.00 |
| 0840 | W tapping sleeve and valve size 1 | EACH A A | 1 | $8,250.00 |
| 0850 | W tapping sleeve and valve size 1 | EACH A A | 1 | $8,300.00 |
| 0860 | W tapping sleeve and valve size 2 | EACH A A | 2 | $13,845 |
| 0870 | W tie-in 02 inch | EACH A A | 1 | $3,730.00 |
| 0880 | W tie-in 06 inch | EACH A A | 1 | $3,800.00 |
| 0890 | W valve 02 inch | EACH A A | 1 | $2,265.00 |
| 0900 | W valve 03 inch | EACH A A | 1 | $3,095.00 |
| 0910 | W valve 06 inch | EACH A A | 4 | $3,100.00 |
| 0920 | W meter remove | EACH A A | 8 | $250.00 |
| 0930 | W valve box remove | EACH A A | 4 | $250.00 |
| 0940 | W pipe polyethylene/plastic 3/4 inch | LF A A | 230 | $42.00 |
| 0950 | W pipe polyethylene/plastic 1 inch | LF A A | 360 | $46.00 |
| 0960 | Special ditch crossing protection | LF A A | 20 | $455.00 |
| 0970 | Demobilization | LS A A | 1 | $43,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.