KYTC contract 25-2136 bid tabulation

ASPHALT RESURFACING HINDMAN - GARRETT ROAD (KY 80). Let by Kentucky Transportation Cabinet on March 20, 2025, Knott, District 12. 1 bid received; low bid $2,720,007 by Mountain Enterprises Inc, +6.5% against the engineer's estimate of $2,553,081.

Owner
Kentucky Transportation Cabinet
Letting
20 MAR 2025
Pay items
19
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Mountain Enterprises Inc$2,720,007Low+7.0%
KYTC contract 25-2136: bids by rank

Engineer's estimate: $2,553,081.

Bid tabulation

LinePay itemUnitQuantity1. Mountain Enterprises Inc
0010Leveling & wedging PG64-22TON A512$125.25
0020CL2 asph surf 0.38D PG64-22TON A5,200$125.25
0030Asphalt material for tackTON A90$10.00
0040CL3 asph surf 0.38B PG64-22TON A9,330$139.10
0050Temporary signsSQFT A350$11.00
0060Maintain & control trafficLS A1$64,000
0070Portable changeable message signEACH A2$1,000.00
0080Mobilization for mill & textLS A1$3,500.00
0090Asphalt pave milling & texturingTON A14,530$21.35
0100Edgeline rumble stripsLF A41,900$0.30
0110Arrow panelEACH A2$875.00
0120Pave striping-temp paint-4 inLF A104,800$0.16
0130Pave striping-thermo-6 in WLF A66,000$1.15
0140Pave striping-thermo-6 in YLF A44,000$1.15
0150Fuel adjustmentDOLL A23,414$1.00
0160Asphalt adjustmentDOLL A58,808$1.00
0170Joint adhesiveLF A108,500$0.40
0180Electronic delivery MGMT systemLS A1$100.00
0190DemobilizationLS A1$39,000
KYTC contract 25-2136: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of March 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy