KYTC contract 25-2234 bid tabulation
ASPHALT RESURFACING SNYDER OT OWENSBORO ROAD (KY 81). Let by Kentucky Transportation Cabinet on June 5, 2025. 1 bid received; low bid $1,035,152 by Hinkle Contracting Company LLC, +1.9% against the engineer's estimate of $1,016,321.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 05 JUN 2025
- Pay items
- 18
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hinkle Contracting Company LLC | $1,035,152 | Low | +2.0% |
Engineer's estimate: $1,016,321.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hinkle Contracting Company LLC |
|---|---|---|---|---|
| 0010 | Dga base | TON A A | 585 | $53.00 |
| 0020 | Leveling & wedging PG64-22 | TON A A | 455 | $104.75 |
| 0030 | CL2 asph surf 0.50D PG64-22 | TON A A | 1,112 | $125.50 |
| 0040 | CL3 asph surf 0.38D PG64-22 | TON A A | 5,510 | $104.75 |
| 0050 | Temporary signs | SQFT A A | 350 | $0.01 |
| 0060 | Maintain & control traffic | LS A A | 1 | $10,000 |
| 0070 | Mobilization for mill & text | LS A A | 1 | $3,000.00 |
| 0080 | Asphalt pave milling & texturing | TON A A | 1,190 | $82.50 |
| 0090 | Edgeline rumble strips | LF A A | 59,654 | $0.26 |
| 0100 | Pave striping-temp paint-4 in | LF A A | 91,000 | $0.30 |
| 0110 | Pave striping-perm paint-6 in | LF A A | 91,000 | $0.36 |
| 0120 | Fuel adjustment | DOLL A A | 8,577 | $1.00 |
| 0130 | Asphalt adjustment | DOLL A A | 21,542 | $1.00 |
| 0140 | Centerline rumble strips | LF A A | 29,827 | $0.18 |
| 0150 | Thermo rumble strips TY 2 | LF A A | 264 | $4.00 |
| 0160 | Asphalt material for tack non-tracking | TON A A | 39 | $10.00 |
| 0170 | Electronic delivery MGMT system - agg | LS A A | 1 | $750.00 |
| 0180 | Demobilization | LS A A | 1 | $15,325 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of June 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.