KYTC contract 25-2336 bid tabulation
GUARDRAIL GREEN ROAD (KY 11). Let by Kentucky Transportation Cabinet on September 25, 2025. 3 bids received; low bid $198,150 by N W K Construction Inc, -8.0% against the engineer's estimate of $215,268.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 25 SEP 2025
- Pay items
- 11
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | N W K Construction Inc | $198,150 | Low | -8.0% |
| 2 | N H Stone Inc | $223,597 | +13% | +4.0% |
| 3 | George B Stone Co LLC | $223,785 | +13% | +4.0% |
Engineer's estimate: $215,268.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. N W K Construction Inc | 2. N H Stone Inc | 3. George B Stone Co LLC |
|---|---|---|---|---|---|---|
| 0010 | Dga base | TON A A | 675 | $60.80 | $65.00 | $60.00 |
| 0020 | Delineator for guardrail BI directional white | EACH A A | 65 | $14.30 | $13.00 | $12.00 |
| 0030 | Guardrail terminal section no 1 | EACH A A | 4 | $83.71 | $95.00 | $75.00 |
| 0040 | Guardrail end treatment type 1 | EACH A A | 2 | $3,305.12 | $3,700.00 | $4,500.00 |
| 0050 | Extra length guardrail post | EACH A A | 176 | $128.41 | $117.00 | $150.00 |
| 0060 | Temporary signs | SQFT A A | 450 | $0.01 | $0.01 | $0.01 |
| 0070 | Maintain & control traffic | LS A A | 1 | $6,501.30 | $7,500.00 | $15,000 |
| 0080 | Cribbing | SQFT A A | 1,350 | $15.00 | $20.00 | $14.50 |
| 0090 | G/R steel W beam-S face (7 FT post) | LF A A | 3,100 | $30.98 | $35.00 | $34.75 |
| 0100 | Electronic delivery MGMT system - agg | LS A A | 1 | $541.78 | $2,000.00 | $1,000.00 |
| 0110 | Demobilization | LS A A | 1 | $3,300.00 | $5,500.00 | $3,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of September 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.