KYTC contract 25-2368 bid tabulation

PAVEMENT (WITH ALTERNATES) WHITESBURG - HAZARD ROAD (KY 15). Let by Kentucky Transportation Cabinet on November 20, 2025. 2 bids received; low bid $517,592 by Strawser Construction Inc, -0.7% against the engineer's estimate of $520,984.

Owner
Kentucky Transportation Cabinet
Letting
20 NOV 2025
Pay items
20
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Strawser Construction Inc$517,592Low-1.0%
2Mountain Enterprises Inc$519,6070.0%0.0%
KYTC contract 25-2368: bids by rank

Engineer's estimate: $520,984.

Bid tabulation

LinePay itemUnitQuantity1. Strawser Construction Inc2. Mountain Enterprises Inc
0010Leveling & wedging PG64-22TON A A96$139.55
0020Asphalt material for tackTON A A23$10.00
0030Edge keyLF A A240$35.85
0050CL3 asph surf no.4B PG64-22TON A A2,160$157.20
0060Microsurfacing-leveling courseSQYD A A54,610$2.65
0070Microsurfacing-surface course - type BSQYD A A52,306$3.62
0080Temporary signsSQFT A A230$21.45$10.75
0090Maintain & control trafficLS A A1$19,352$14,500
0100Portable changeable message signEACH A A2$834.00$1,050.00
0110Arrow panelEACH A A2$566.00$815.00
0120Pave striping-temp paint-4 inLF A A42,000$0.17$0.15
0130Pave striping removal-6 inLF A A42,000$0.51$0.45
0140Pave striping-thermo-6 in WLF A A25,000$1.41$1.25
0150Pave striping-thermo-6 in YLF A A17,000$1.41$1.25
0160Pave striping-dur TY 1-6 in WLF A A2,310$8.99$8.00
0170Pave striping-dur TY 1-6 in YLF A A3,080$8.99$8.00
0180Pave marking-thermo stop bar-24INLF A A156$13.50$12.00
0190Pave marking-thermo curv arrowEACH A A20$135.00$120.00
0200Centerline rumble stripsLF A A7,000$0.70$0.62
0210DemobilizationLS A A1$10,500$7,690.00
KYTC contract 25-2368: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of November 20, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy