KYTC contract 25-2950 bid tabulation

BRIDGE PAINTING & CLEANING KY 90 ~ 2 LOCATIONS. Let by Kentucky Transportation Cabinet on July 24, 2025. 11 bids received; low bid $1,276,810 by Euro Paint LLC, -57% against the engineer's estimate of $3,003,939.

Owner
Kentucky Transportation Cabinet
Letting
24 JUL 2025
Pay items
20
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Euro Paint LLC$1,276,810Low-57%
2North Star Painting Company Inc$1,361,717+7.0%-55%
3Legend Painting Inc$1,658,286+30%-45%
4Elite Contractors Inc$1,685,400+32%-44%
5Gulf Coast Contracting LLC$1,706,534+34%-43%
6Spartan Contracting LLC$1,848,000+45%-38%
7Vimas Painting Company Inc$2,173,400+70%-28%
8Olympus Painting Contractors Inc$2,242,800+76%-25%
9Elite Industrial Painting Inc$2,576,430+102%-14%
10Thomas Industrial Coatings Inc$2,761,955+116%-8.0%
11Steel City Contractors LLC$3,171,200+148%+6.0%
KYTC contract 25-2950: bids by rank

Engineer's estimate: $3,003,939.

Bid tabulation

LinePay itemUnitQuantity1. Euro Paint LLC2. North Star Painting Company Inc3. Legend Painting Inc4. Elite Contractors Inc5. Gulf Coast Contracting LLC6. Spartan Contracting LLC
0010Barricade-type IIIEACH A A1$20.00$15.00$5.00$100.00$10.00$1.00
0020Maintain & control trafficLS A A1$8,400.00$10,000$11,820$5,000.00$15,000$5,000.00
0030Lane closureEACH A A1$5,000.00$10,000$3,500.00$2,000.00$2,000.00$1,000.00
0040Portable changeable message signEACH A A2$625.00$1,575.00$525.00$4,000.00$2,000.00$2,000.00
0050Temp signal 2 phaseEACH A A1$5,000.00$18,000$6,000.00$12,000$7,000.00$9,500.00
0060Clean & paint structural steelLS A A1$745,500$720,000$993,000$930,000$560,000$1,100,000
0070Joint seal replacementLF A A44$290.00$273.00$290.00$300.00$333.50$295.00
0080Bridge cleaningLS A A1$10,000$15,000$10,000$30,000$500.00$1,000.00
0090Concrete coatingLS A A1$5,500.00$10,000$5,000.00$10,000$4,000.00$500.00
0100Barricade-type IIIEACH A A1$20.00$20.00$10.00$100.00$10.00$1.00
0110Maintain & control trafficLS A A1$6,500.00$10,000$8,320.00$5,000.00$15,000$5,000.00
0120Lane closureEACH A A1$5,000.00$8,500.00$3,500.00$2,000.00$2,000.00$1,000.00
0130Portable changeable message signEACH A A2$625.00$1,050.00$525.00$2,000.00$2,000.00$2,000.00
0140Temp signal 2 phaseEACH A A1$5,000.00$12,000$6,000.00$12,000$14,000$9,500.00
0150Clean & paint structural steelLS A A1$373,500$400,000$525,000$490,000$1,000,000$577,000
0160Joint seal replacementLF A A40$290.00$273.00$290.00$300.00$333.50$295.00
0170Bridge cleaningLS A A1$10,000$15,000$5,000.00$20,000$500.00$1,000.00
0180Concrete coatingLS A A1$10,500$5,000.00$5,000.00$10,000$4,000.00$500.00
0190MobilizationLS A A1$41,235$60,000$23,000$70,000$20,000$77,218
0200DemobilizationLS A A1$18,775$40,000$26,671$50,000$26,500$27,000
KYTC contract 25-2950: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of July 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy