KYTC contract 25-4301 bid tabulation
GRADE & DRAIN WITH ASPHALT SURFACE RICHMOND ROAD & ATHENS-BOONESBORO ROAD (US 25 & KY 418). Let by Kentucky Transportation Cabinet on May 22, 2025. 2 bids received; low bid $13,228,293 by L-M Asphalt Partners LTD D/B/A Ats Construction, -6.8% against the engineer's estimate of $14,193,074.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 22 MAY 2025
- Pay items
- 192
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | L-M Asphalt Partners LTD D/B/A Ats Construction | $13,228,293 | Low | -7.0% |
| 2 | Louisville Paving Company Inc | $17,454,759 | +32% | +23% |
Engineer's estimate: $14,193,074.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. L-M Asphalt Partners LTD D/B/A Ats Construction | 2. Louisville Paving Company Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 32,223 | $30.00 | $51.72 |
| 0020 | Asphalt seal aggregate | TON A A | 52 | $155.00 | $157.86 |
| 0030 | Asphalt seal coat | TON A A | 7 | $1,950.00 | $1,836.00 |
| 0040 | Leveling & wedging PG64-22 | TON A A | 111 | $125.00 | $121.09 |
| 0050 | CL2 asph base 1.00D PG64-22 | TON A A | 3,317 | $72.00 | $86.03 |
| 0060 | CL4 asph base 1.00D PG64-22 | TON A A | 18,273 | $72.00 | $101.85 |
| 0070 | CL4 asph base 1.00D PG76-22 | TON A A | 7,113 | $78.00 | $88.91 |
| 0080 | CL2 asph surf 0.38B PG64-22 | TON A A | 1,329 | $105.00 | $128.61 |
| 0090 | CL4 asph surf 0.38A PG76-22 | TON A A | 14,269 | $110.00 | $120.09 |
| 0100 | JPC pavement-8 in | SQYD A A | 524 | $121.24 | $121.24 |
| 0110 | Mobilization for mill & text | LS A A | 1 | $4,000.00 | $5,000.00 |
| 0120 | Asphalt pave milling & texturing | TON A A | 11,939 | $20.00 | $27.67 |
| 0130 | Asphalt material for tack non-tracking | TON A A | 115.60 | $0.01 | $0.01 |
| 0140 | Standard curb and gutter mod | LF A A | 1,614 | $41.74 | $41.74 |
| 0150 | Remove curb and gutter | LF A A | 470 | $14.83 | $76.67 |
| 0160 | Island header curb type 2 | LF A A | 1,201 | $31.22 | $31.22 |
| 0170 | Standard barrier median type 2 | SQYD A A | 1,538 | $94.77 | $94.77 |
| 0180 | Standard barrier median type 4 | SQYD A A | 640 | $93.90 | $93.90 |
| 0190 | Remove pavement | SQYD A A | 9,646 | $17.25 | $12.17 |
| 0200 | Temp ditch | LF A A | 9,550 | $1.00 | $1.75 |
| 0210 | Clean temp ditch | LF A A | 4,772 | $0.01 | $1.75 |
| 0220 | Roadway excavation | CUYD A A | 55,367 | $24.00 | $46.85 |
| 0230 | Structure excav-unclassified | CUYD A A | 125.70 | $40.00 | $192.53 |
| 0240 | Granular embankment | CUYD A A | 63.30 | $75.00 | $115.09 |
| 0250 | Water | MGAL A A | 1,808 | $0.01 | $0.01 |
| 0260 | Right-of-way monument type 1 | EACH A A | 27 | $150.00 | $175.00 |
| 0270 | Witness post | EACH A A | 27 | $150.00 | $125.00 |
| 0280 | Channel lining class II | TON A A | 1,264 | $48.00 | $75.96 |
| 0290 | Clearing and grubbing | LS A A | 1 | $90,000 | $63,603 |
| 0300 | Concrete-class B | CUYD A A | 64 | $990.00 | $750.00 |
| 0310 | Temporary signs | SQFT A A | 550 | $12.72 | $5.00 |
| 0320 | Fabric-geotextile class 2 | SQYD A A | 218 | $1.50 | $6.00 |
| 0330 | Handrail-type A-1 | LF A A | 235 | $95.00 | $185.65 |
| 0340 | Maintain & control traffic | LS A A | 1 | $75,000 | $245,567 |
| 0350 | Maintain & control traffic | LS A A | 1 | $75,000 | $98,264 |
| 0360 | Maintain & control traffic | LS A A | 1 | $75,000 | $98,264 |
| 0370 | Maintain & control traffic | LS A A | 1 | $75,000 | $98,264 |
| 0380 | Portable changeable message sign | EACH A A | 7 | $4,000.00 | $5,724.00 |
| 0390 | Edgeline rumble strips | LF A A | 51,092 | $0.17 | $0.21 |
| 0400 | Temp silt fence | LF A A | 9,550 | $1.85 | $2.00 |
| 0410 | Silt trap type B | EACH A A | 50 | $140.00 | $500.00 |
| 0420 | Silt trap type C | EACH A A | 50 | $135.00 | $500.00 |
| 0430 | Clean silt trap type B | EACH A A | 50 | $50.00 | $500.00 |
| 0440 | Clean silt trap type C | EACH A A | 50 | $50.00 | $500.00 |
| 0450 | Sidewalk-4 in concrete | SQYD A A | 505 | $64.62 | $64.62 |
| 0460 | Remove concrete sidewalk | SQYD A A | 109 | $15.00 | $72.02 |
| 0470 | Staking | LS A A | 1 | $15,600 | $46,975 |
| 0480 | Staking | LS A A | 1 | $15,600 | $46,975 |
| 0490 | Staking | LS A A | 1 | $15,600 | $46,975 |
| 0500 | Staking | LS A A | 1 | $15,600 | $46,975 |
| 0510 | Staking | LS A A | 1 | $15,600 | $3,231.61 |
| 0520 | Arrow panel | EACH A A | 6 | $1.00 | $3,816.00 |
| 0530 | Tubular markers | EACH A A | 42 | $150.00 | $78.57 |
| 0540 | Temp signal 2 phase | EACH A A | 1 | $7,000.00 | $14,000 |
| 0550 | Erosion control blanket | SQYD A A | 9,846 | $2.05 | $1.85 |
| 0560 | Temp mulch | SQYD A A | 148,627 | $0.17 | $0.39 |
| 0570 | Temp seeding and protection | SQYD A A | 111,470 | $0.23 | $0.41 |
| 0580 | Initial fertilizer | TON A A | 12.40 | $165.00 | $1,350.00 |
| 0590 | Maintenance fertilizer | TON A A | 7.50 | $165.00 | $1,350.00 |
| 0600 | Seeding and protection | SQYD A A | 222,940 | $0.30 | $0.41 |
| 0610 | Special seeding crown vetch | SQYD A A | 10,484 | $0.64 | $0.30 |
| 0620 | Sodding | SQYD A A | 2,256 | $8.25 | $14.00 |
| 0630 | Agricultural limestone | TON A A | 148 | $118.00 | $200.00 |
| 0640 | Pave striping-temp paint-6 in | LF A A | 162,005 | $0.30 | $0.30 |
| 0650 | Pave striping-perm paint-6 in | LF A A | 381 | $1.50 | $1.50 |
| 0660 | Pave striping-thermo-6 in W | LF A A | 65,475 | $1.20 | $1.20 |
| 0670 | Pave striping-thermo-6 in Y | LF A A | 38,460 | $1.20 | $1.20 |
| 0680 | Pave striping-thermo-12 in W | LF A A | 4,068 | $2.40 | $2.40 |
| 0690 | Pave marking-thermo X-walk-12 in | LF A A | 4,754 | $6.00 | $6.00 |
| 0700 | Pave marking-thermo stop bar-24IN | LF A A | 1,063 | $9.00 | $9.00 |
| 0710 | Pave marking-thermo cross-hatch | SQFT A A | 3,285 | $5.00 | $5.00 |
| 0720 | Pave marking-thermo curv arrow | EACH A A | 170 | $115.00 | $115.00 |
| 0730 | Pave marking-thermo comb arrow | EACH A A | 6 | $275.00 | $275.00 |
| 0740 | Pave marking-thermo only | EACH A A | 29 | $275.00 | $275.00 |
| 0750 | Pavement marking removal | SQFT A A | 31 | $10.00 | $10.00 |
| 0760 | Inlaid pavement marker-MW | EACH A A | 765 | $32.00 | $32.00 |
| 0770 | Inlaid pavement marker-MY | EACH A A | 102 | $32.00 | $32.00 |
| 0780 | Inlaid pavement marker-by | EACH A A | 33 | $32.00 | $32.00 |
| 0790 | Inlaid pavement marker-B W/R | EACH A A | 338 | $32.00 | $32.00 |
| 0800 | Fuel adjustment | DOLL A A | 90,145 | $1.00 | $1.00 |
| 0810 | Asphalt adjustment | DOLL A A | 174,087 | $1.00 | $1.00 |
| 0820 | Pave mark handicap symbol | EACH A A | 1 | $275.00 | $275.00 |
| 0830 | Law enforcement officer | HOUR A A | 102 | $80.00 | $80.00 |
| 0840 | Saw cut | LF A A | 37,177 | $2.50 | $1.16 |
| 0850 | Pave marking thermo-bike | EACH A A | 2 | $250.00 | $250.00 |
| 0860 | Pave mark thermo cone cap-solid yellow | SQFT A A | 4,208 | $5.00 | $5.00 |
| 0870 | Wood plank fence | LF A A | 1,006 | $60.00 | $24.64 |
| 0880 | Pave mark temp paint stop bar-24 in | LF A A | 400 | $8.00 | $8.00 |
| 0890 | Detectable warnings | SQFT A A | 312 | $49.94 | $49.94 |
| 0900 | Turf reinforcement mat 1 | SQYD A A | 3,902 | $5.00 | $12.06 |
| 0910 | Island curb and gutter(modified) | LF A A | 42 | $63.52 | $63.52 |
| 0920 | Pave marking thermo-bike lane arrow | EACH A A | 2 | $140.00 | $140.00 |
| 0930 | Pave mark thermo chevron | SQFT A A | 837 | $6.00 | $6.00 |
| 0940 | Lane separator curb | LF A A | 167 | $75.00 | $113.12 |
| 0950 | Pave marking-thermo U-turn | EACH A A | 54 | $250.00 | $250.00 |
| 0960 | Pave marking-thermo shared lane marking | EACH A A | 4 | $350.00 | $350.00 |
| 0970 | Electronic delivery MGMT system | LS A A | 1 | $0.01 | $0.01 |
| 0980 | Electronic delivery MGMT system | LS A A | 1 | $0.01 | $0.01 |
| 0990 | Electronic delivery MGMT system | LS A A | 1 | $0.01 | $0.01 |
| 1000 | Electronic delivery MGMT system | LS A A | 1 | $0.01 | $0.01 |
| 1010 | Entrance pipe-15 in | LF A A | 196 | $65.00 | $240.68 |
| 1020 | Culvert pipe-15 in | LF A A | 54 | $75.00 | $134.58 |
| 1030 | Culvert pipe-18 in | LF A A | 95 | $80.00 | $132.22 |
| 1040 | Culvert pipe-24 in | LF A A | 8 | $190.00 | $518.79 |
| 1050 | Culvert pipe-36 in | LF A A | 8 | $235.00 | $583.60 |
| 1060 | Culvert pipe-42 in | LF A A | 38 | $325.00 | $277.00 |
| 1070 | Storm sewer pipe-15 in | LF A A | 2,405 | $65.00 | $95.77 |
| 1080 | Storm sewer pipe-18 in | LF A A | 226 | $75.00 | $144.02 |
| 1090 | Storm sewer pipe-30 in | LF A A | 8 | $400.00 | $730.14 |
| 1100 | Pipe culvert headwall-15 in | EACH A A | 1 | $1,250.00 | $2,601.58 |
| 1110 | Pipe culvert headwall-42 in | EACH A A | 2 | $2,950.00 | $5,245.66 |
| 1120 | Remove pipe | LF A A | 117 | $10.00 | $62.02 |
| 1130 | Sloped box outlet type 1-15 in | EACH A A | 4 | $2,150.00 | $3,898.41 |
| 1140 | Sloped box outlet type 1-18 in | EACH A A | 1 | $2,150.00 | $3,898.41 |
| 1150 | Sloped box inlet-outlet type 1 | EACH A A | 2 | $2,150.00 | $3,898.41 |
| 1160 | S & F box inlet-outlet-18 in | EACH A A | 1 | $3,500.00 | $3,898.41 |
| 1170 | Curb box inlet type A | EACH A A | 3 | $7,700.00 | $12,078 |
| 1180 | Drop box inlet type 5B | EACH A A | 5 | $5,800.00 | $8,265.10 |
| 1190 | Drop box inlet type 5D | EACH A A | 3 | $6,000.00 | $8,385.73 |
| 1200 | Drop box inlet type 5F | EACH A A | 3 | $5,600.00 | $8,385.73 |
| 1210 | Drop box inlet type 13G | EACH A A | 5 | $4,200.00 | $4,929.49 |
| 1220 | Manhole type A | EACH A A | 1 | $4,200.00 | $4,726.41 |
| 1230 | Manhole type C | EACH A A | 2 | $26,600 | $11,066 |
| 1240 | Drainage junction box TY B | EACH A A | 4 | $4,000.00 | $5,965.44 |
| 1250 | Headwall | EACH A A | 1 | $11,000 | $7,679.25 |
| 1260 | Pipeline inspection | LF A A | 2,648 | $2.35 | $2.35 |
| 1270 | Sloped and mitered headwall-18 in | EACH A A | 3 | $3,200.00 | $5,607.94 |
| 1280 | S encasement steel open cut range 2 | LF A A | 200 | $225.00 | $524.20 |
| 1290 | S force main air RLS/vac VLV 02 in | EACH A A | 1 | $7,350.00 | $3,064.24 |
| 1300 | S force main PVC 10 inch | LF A A | 500 | $120.00 | $210.52 |
| 1310 | S force main tie-in 10 inch | EACH A A | 2 | $2,000.00 | $9,965.14 |
| 1320 | S structure removal | EACH A A | 1 | $990.00 | $3,653.29 |
| 1330 | SBM alum sheet signs .080 in | SQFT A A | 2,307 | $35.00 | $33.00 |
| 1340 | SBM alum sheet signs .125 in | SQFT A A | 1,236 | $40.00 | $36.00 |
| 1350 | Steel post type 1 | LF A A | 3,992 | $18.00 | $34.00 |
| 1360 | Class A concrete for signs | CUYD A A | 9.50 | $1,000.00 | $1,200.00 |
| 1370 | GMSS type D | EACH A A | 38 | $500.00 | $850.00 |
| 1380 | GMSS type D | EACH A A | 19 | $500.00 | $545.00 |
| 1390 | Barcode sign inventory | EACH A A | 514 | $25.00 | $21.00 |
| 1400 | Pole base | EACH A A | 15 | $3,000.00 | $3,000.00 |
| 1410 | Fused connector kit | EACH A A | 123 | $200.00 | $200.00 |
| 1420 | Conduit-2 in | LF A A | 200 | $8.93 | $8.93 |
| 1430 | Trenching and backfilling | LF A A | 12,842 | $15.39 | $15.39 |
| 1440 | Open cut roadway | LF A A | 3,396 | $68.48 | $68.48 |
| 1450 | Wire-no. 4 | LF A A | 800 | $1.59 | $1.59 |
| 1460 | Cable-no. 14/2C | LF A A | 4,317 | $0.82 | $0.82 |
| 1470 | Cable-no. 14/7C | LF A A | 14,045 | $1.11 | $1.11 |
| 1480 | Mast arm pole | EACH A A | 14 | $46,325 | $46,325 |
| 1490 | Anchor | EACH A A | 10 | $1,500.00 | $1,500.00 |
| 1500 | Messenger-15400 LB | LF A A | 600 | $10.00 | $10.00 |
| 1510 | Coordinating unit | EACH A A | 2 | $2,500.00 | $2,500.00 |
| 1520 | Install steel strain pole | EACH A A | 4 | $12,000 | $12,000 |
| 1530 | Temp signal 2 phase | EACH A A | 5 | $30,000 | $30,000 |
| 1540 | Temp signal multi phase | EACH A A | 3 | $35,000 | $35,000 |
| 1550 | Temp relocation of signal head | EACH A A | 126 | $250.00 | $250.00 |
| 1560 | Install span mounted sign | EACH A A | 1 | $650.00 | $650.00 |
| 1570 | Install pedestrian head-LED | EACH A A | 32 | $900.00 | $900.00 |
| 1580 | Install LED signal-3 section | EACH A A | 53 | $600.00 | $600.00 |
| 1590 | Install LED signal- 4 section | EACH A A | 34 | $700.00 | $700.00 |
| 1600 | Electrical junction box type A | EACH A A | 17 | $3,500.00 | $3,500.00 |
| 1610 | Electrical junction box type C | EACH A A | 39 | $4,000.00 | $4,000.00 |
| 1620 | Install ped detector-audible | EACH A A | 28 | $500.00 | $500.00 |
| 1630 | Fiber optic cable | LF A A | 10,107 | $2.00 | $2.00 |
| 1640 | Bore and jack conduit | LF A A | 7,277 | $11.00 | $11.00 |
| 1650 | Web camera assembly | EACH A A | 4 | $5,000.00 | $5,000.00 |
| 1660 | Install luminaire pole | EACH A A | 16 | $6,000.00 | $6,000.00 |
| 1670 | Traffic signal pole base | CUYD A A | 63 | $300.00 | $300.00 |
| 1680 | Install signal pedestal | EACH A A | 12 | $5,000.00 | $5,000.00 |
| 1690 | HDPE conduit-2 in-schedule 80 | LF A A | 18,880 | $0.64 | $0.64 |
| 1700 | Install signal controller-TY atc | EACH A A | 12 | $4,500.00 | $4,500.00 |
| 1710 | Cabinet fiber termination panel | EACH A A | 12 | $20,000 | $20,000 |
| 1720 | Remove signal equipment | EACH A A | 4 | $15,000 | $15,000 |
| 1730 | Install radar presence detector type A | EACH A A | 26 | $1,000.00 | $1,000.00 |
| 1740 | Install radar advance detector type B | EACH A A | 13 | $1,000.00 | $1,000.00 |
| 1750 | Install mast arm dampener | EACH A A | 19 | $250.00 | $250.00 |
| 1760 | Pole base | EACH A A | 34 | $3,000.00 | $3,000.00 |
| 1770 | Trenching and backfilling | LF A A | 8,482 | $15.39 | $15.39 |
| 1780 | Open cut roadway | LF A A | 842 | $68.48 | $68.48 |
| 1790 | Remove lighting | LS A A | 1 | $15,000 | $15,000 |
| 1800 | Electrical junction box type A | EACH A A | 10 | $3,500.00 | $3,500.00 |
| 1810 | Bore and jack conduit | LF A A | 842 | $11.00 | $11.00 |
| 1820 | PVC conduit-1 1/4 in-schedule 80 | LF A A | 6,920 | $1.44 | $1.44 |
| 1830 | PVC conduit-2 in-schedule 80 | LF A A | 2,404 | $1.76 | $1.76 |
| 1840 | Delineator for guardrail mono directional white | EACH A A | 22 | $10.00 | $16.19 |
| 1850 | Guardrail-steel W beam-S face | LF A A | 2,037.50 | $28.00 | $34.97 |
| 1860 | Guardrail terminal section no 1 | EACH A A | 1 | $100.00 | $90.16 |
| 1870 | Guardrail end treatment type 1 | EACH A A | 1 | $4,500.00 | $3,532.73 |
| 1880 | Guardrail end treatment type 2A | EACH A A | 3 | $1,000.00 | $1,320.41 |
| 1890 | Remove guardrail | LF A A | 2,794 | $2.00 | $3.23 |
| 1900 | Guardrail end treatment type 4A | EACH A A | 1 | $4,500.00 | $3,863.84 |
| 1910 | Mobilization | LS A A | 1 | $500,000 | $800,000 |
| 1920 | Demobilization | LS A A | 1 | $195,000 | $245,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 22, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.