KYTC contract 25-4404 bid tabulation

ASPHALT SURFACE WITH GRADE & DRAIN S. MULBERRY STREET (US 62). Let by Kentucky Transportation Cabinet on June 5, 2025. 3 bids received; low bid $2,854,576 by Scotty'S Contracting & Stone LLC, -11% against the engineer's estimate of $3,200,853.

Owner
Kentucky Transportation Cabinet
Letting
05 JUN 2025
Pay items
147
Data through
22 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Scotty'S Contracting & Stone LLC$2,854,576Low-11%
2Louisville Paving Company Inc$3,202,914+12%0.0%
3Dirt Works Unlimited LLC$3,460,887+21%+8.0%
KYTC contract 25-4404: bids by rank

Engineer's estimate: $3,200,853.

Bid tabulation

LinePay itemUnitQuantity1. Scotty'S Contracting & Stone LLC2. Louisville Paving Company Inc3. Dirt Works Unlimited LLC
0010Crushed stone baseTON A A1,544$42.79$67.00$39.71
0020Crushed aggregate size no 2TON A A578$41.57$67.00$39.17
0030Leveling & wedging PG64-22TON A A278$111.85$111.85$137.09
0040CL3 asph base 1.00D PG64-22TON A A424$137.95$137.95$163.39
0050Asphalt material for tackTON A A14.50$550.00$550.00$907.07
0060CL3 asph surf 0.38B PG76-22TON A A1,864$106.60$106.60$155.86
0070Mobilization for mill & textLS A A1$4,500.00$4,500.00$3,976.05
0080Asphalt pave milling & texturingTON A A216$54.00$54.00$23.21
0090CL2 asph surf no.4B PG64-22TON A A1,240$115.95$115.95$169.38
0100CL4 asph surf no.4A PG76-22TON A A141$137.15$137.15$189.05
0120Crushed stone baseTON A A754$42.79$67.00$36.33
0130CL2 asph base 0.75D PG64-22TON A A232$117.45$117.45$140.81
0140CL2 asph surf 0.38D PG64-22TON A A103$124.40$124.40$189.63
0150Asphalt material for tackTON A A0.50$550.00$550.00$907.07
0160Standard curb and gutterLF A A6,651$28.31$28.31$30.02
0170Standard curb and gutter modLF A A1,260$32.11$33.72$29.34
0180Lip curb and gutterLF A A531$36.31$36.31$38.50
0190Island curb and gutterLF A A105$39.24$39.24$41.61
0200Island header curb type 1LF A A98$56.06$56.06$59.44
0210Standard barrier median type 4SQYD A A195$116.27$116.27$123.28
0220Mountable median type 3SQYD A A12$155.27$155.27$164.63
0230Barricade-type IIIEACH A A16$125.00$100.00$168.58
0240Cement concrete islandSQYD A A577$77.76$77.76$82.45
0250JPC pavement-8 inSQYD A A640$125.42$125.42$152.20
0260Temp ditchLF A A200$0.01$5.26$1.37
0270Clean temp ditchLF A A200$0.01$5.26$0.68
0280Roadway excavationCUYD A A6,195$29.59$65.00$47.50
0290Channel lining class IITON A A12$83.08$300.00$71.35
0300Clearing and grubbingLS A A1$1,709.25$10,000$1,514.69
0310Temporary signsSQFT A A600$10.50$5.00$7.87
0320Edge keyLF A A1,459$6.15$6.15$9.57
0330Fabric-geotextile class 1SQYD A A21$3.69$48.37$3.58
0340Fabric-geotextile class 2SQYD A A2,300$1.98$1.75$3.43
0350Fabric-geotextile class 2 for pipeSQYD A A617$2.00$2.00$2.00
0360Maintain & control trafficLS A A1$117,452$140,000$125,000
0370Maintain & control trafficLS A A1$34,350$72,500$32,490
0380Truck mounted attenuatorEACH A A2$4,850.00$4,240.00$10,205
0390Portable changeable message signEACH A A8$2,280.00$1,908.00$9,440.73
0400Mobilization for mill & textLS A A1$4,500.00$4,500.00$3,976.05
0410Shoulder rumble stripsLF A A1,130$3.75$4.60$4.77
0420Temp silt fenceLF A A1,500$2.93$3.00$2.90
0430Silt trap type AEACH A A2$0.01$2,426.44$296.58
0440Silt trap type BEACH A A2$305.95$1,213.52$217.93
0450Silt trap type CEACH A A2$262.98$293.82$172.32
0460Clean silt trap type AEACH A A2$0.01$165.13$69.64
0470Clean silt trap type BEACH A A2$0.01$165.13$69.64
0480Clean silt trap type CEACH A A2$0.01$214.32$69.64
0490Sidewalk-4 in concreteSQYD A A245$66.80$66.80$70.83
0500StakingLS A A1$33,515$22,513$32,126
0510Arrow panelEACH A A5$775.00$1,272.00$3,203.11
0520Conc barrier wall type 9TLF A A80$101.91$112.32$38.34
0530Erosion control blanketSQYD A A510$2.00$2.00$3.45
0540Temp mulchSQYD A A7,348$0.25$0.25$0.45
0550Temp seeding and protectionSQYD A A5,566$0.35$0.35$0.46
0560Initial fertilizerTON A A0.60$1,500.00$1,500.00$1,628.67
0570Maintenance fertilizerTON A A0.50$2,000.00$2,000.00$1,628.68
0580Seeding and protectionSQYD A A4,825$0.45$0.45$0.82
0590SoddingSQYD A A5,732$8.50$8.50$14.20
0600Agricultural limestoneTON A A7$85.00$85.00$92.72
0610Pave striping-temp paint-6 inLF A A31,334$0.32$0.32$0.34
0620Pave striping-thermo-6 in WLF A A15,076$1.30$1.30$1.38
0630Pave striping-thermo-6 in YLF A A16,438$1.30$1.30$1.38
0640Pave striping-thermo-12 in WLF A A251$6.00$6.00$6.36
0650Pave striping-thermo-12 in YLF A A246$6.00$6.00$6.36
0660Pave marking-thermo X-walk-12 inLF A A2,618$7.00$7.00$7.42
0670Pave marking-thermo stop bar-24INLF A A331$15.00$15.00$15.90
0680Pave marking-thermo STR arrowEACH A A6$150.00$150.00$159.04
0690Pave marking-thermo curv arrowEACH A A45$150.00$150.00$159.04
0700Pave marking-thermo comb arrowEACH A A3$275.00$275.00$291.58
0710Pave marking-thermo merge arrowEACH A A3$300.00$300.00$318.08
0720Concrete-class ACUYD A A25$786.92$786.92$834.36
0730Fuel adjustmentDOLL A A6,381$1.00$1.00$1.00
0740Asphalt adjustmentDOLL A A16,030$1.00$1.00$1.00
0750Sawcut pavementLF A A8,060$6.00$1.96$2.55
0760Pave marking thermo-bikeEACH A A34$350.00$350.00$371.10
0770Longitudinal edge keyLF A A866$11.65$11.65$2.32
0780Pave marking-thermo yield bar-36 inLF A A30$25.00$25.00$26.51
0790Water blasting existing stripeLF A A165$20.00$20.00$21.21
0800Detectable warningsSQFT A A396$44.16$44.16$51.20
0810Bike pathSQYD A A6$700.00$2,100.00$437.98
0820Pave marking thermo-bike lane arrowEACH A A34$100.00$100.00$106.03
0830Fine millingSQYD A A36,047$1.30$1.30$1.99
0840Electronic delivery MGMT system - aggLS A A1$0.01$0.01$1,590.42
0850Culvert pipe-18 inLF A A54$146.53$113.82$134.71
0860Storm sewer pipe-15 inLF A A1,358$126.65$130.40$114.10
0870Storm sewer pipe-18 inLF A A586$118.56$114.85$127.92
0880Slotted drain pipe-15 inLF A A10$525.00$394.58$315.89
0890Perforated pipe-4 inLF A A635$4.15$40.29$14.03
0900Non-perforated pipe-4 inLF A A80$5.91$55.18$15.90
0910Perf pipe headwall TY 1-4 inEACH A A3$488.75$1,743.57$2,083.89
0920S & F box inlet-outlet-18 inEACH A A1$3,800.00$2,994.95$3,977.73
0930Drop box inlet type 13GEACH A A19$5,500.00$3,366.66$4,625.28
0940Drop box inlet type 13SEACH A A5$7,000.00$4,573.81$6,666.64
0950Junction box-18 inEACH A A2$2,800.00$2,857.32$3,622.68
0960Flume inlet type 1EACH A A1$6,617.69$6,617.69$7,672.65
0970Flume inlet type 2EACH A A1$6,161.83$6,161.83$7,144.12
0980Cored hole drainage box con-4 inEACH A A5$424.47$350.00$463.40
0990Pipeline inspectionLF A A1,388$2.35$2.35$2.72
1000Sloped and mitered headwall-15 inEACH A A12$3,000.00$2,007.60$4,444.71
1010Sloped and mitered headwall-18 inEACH A A3$3,200.00$2,007.60$4,444.71
1020Truck mounted attenuatorEACH A A3$4,850.00$2,120.00$5,468.97
1030SBM alum sheet signs .080 inSQFT A A576$35.00$35.00$72.28
1040SBM alum sheet signs .125 inSQFT A A467$40.00$40.00$77.29
1050Steel post type 2LF A A1,183$30.00$30.00$29.68
1060Class A concrete for signsCUYD A A1.75$1,000.00$1,000.00$1,511.12
1070Pave striping-temp paint-6 inLF A A23,918$0.32$0.32$0.34
1080Pave striping-thermo-6 in WLF A A8,731$1.30$1.30$1.38
1090Pave striping-thermo-6 in YLF A A7,483$1.30$1.30$1.38
1100Pave striping-thermo-12 in WLF A A1,500$6.00$6.00$6.36
1110Pave striping-thermo-12 in WLF A A582$8.00$8.00$8.48
1120Pave marking-thermo R 6 FTEACH A A2$150.00$150.00$159.04
1130Pave marking-R/R xbucks 16 inLF A A43$15.00$15.00$15.90
1140Pave marking-thermo X-walk-12 inLF A A100$7.00$7.00$7.42
1150Pave marking-thermo stop bar-24INLF A A35$15.00$15.00$15.90
1160Pave marking-paint cross-hatchSQFT A A179$10.00$10.00$10.60
1170Pave marking-paint cross-hatchSQFT A A120$10.00$10.00$10.60
1180Pave marking-thermo STR arrowEACH A A9$150.00$150.00$159.04
1190Pave marking-thermo curv arrowEACH A A17$150.00$150.00$159.04
1200Pave marking-thermo comb arrowEACH A A11$275.00$275.00$291.58
1210Pave marking-thermo onlyEACH A A2$500.00$500.00$530.14
1220Pave marking-paint wordsEACH A A3$150.00$150.00$159.04
1230Pave marking-paint wordsEACH A A1$150.00$150.00$159.04
1240Pave marking-paint wordsEACH A A2$150.00$150.00$159.04
1250GMSS type DEACH A A7$750.00$750.00$534.49
1260GMSS type DEACH A A15$500.00$500.00$514.56
1270Pave marking-thermo yield bar-36 inLF A A111$25.00$25.00$26.51
1280Water blasting existing stripeLF A A7,069$0.75$0.75$0.80
1290Qwick curb median separatorLF A A240$125.00$125.00$212.06
1300Pave stripe-wet ref tape-6 in YLF A A473$12.00$12.00$12.72
1310Pave stripe-wet ref tape-6 in WLF A A950$12.00$12.00$12.72
1320Roundabout arrowEACH A A9$500.00$500.00$530.14
1330Barcode sign inventoryEACH A A185$25.00$25.00$48.84
1340Pave mark thermo chevronSQFT A A96$7.00$7.00$7.42
1350Pave marking-thermo dotted lane extenLF A A350$6.00$6.00$6.36
1360Pave marking-thermo U-turnEACH A A2$300.00$300.00$318.08
1370Pave marking-thermo elong route shieldEACH A A3$4,500.00$4,500.00$4,771.26
1380StakingLS A A1$13,406$23,014$15,000
1390Signal-pedestrianEACH A A1$7,581.62$847.50$898.30
1400Pedestrian signal pedestalEACH A A1$13,154$4,623.00$4,900.11
1410Rectangular rapid flashing beaconEACH A A2$27,574$18,000$19,079
1420Pave marking-thermo shared lane markingEACH A A2$400.00$400.00$423.97
1430Trenching and backfillingLF A A2,525$10.01$20.52$21.75
1440Electrical junction box type AEACH A A8$1,549.53$3,800.00$4,027.78
1450Bore and jack conduitLF A A425$27.13$30.00$31.80
1460PVC conduit-2 in-schedule 80LF A A2,950$12.62$1.67$1.77
1470MobilizationLS A A1$80,535$148,000$160,000
1480DemobilizationLS A A1$40,850$45,000$51,915
KYTC contract 25-4404: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.

Every contract let that day: KYTC letting of June 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy