KYTC contract 25-4507 bid tabulation
GUARDRAIL INTERSTATE 65 & 165 (I-65 & I-165). Let by Kentucky Transportation Cabinet on October 23, 2025. 3 bids received; low bid $105,546 by George B Stone Co LLC, -39% against the engineer's estimate of $173,953.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 23 OCT 2025
- Pay items
- 11
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | George B Stone Co LLC | $105,546 | Low | -39% |
| 2 | Eden Fence Inc | $187,734 | +78% | +8.0% |
| 3 | N W K Construction Inc | $214,394 | +103% | +23% |
Engineer's estimate: $173,953.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. George B Stone Co LLC | 2. Eden Fence Inc | 3. N W K Construction Inc |
|---|---|---|---|---|---|---|
| 0010 | Delineator for guardrail mono directional white | EACH A A | 1,450 | $10.00 | $20.00 | $19.39 |
| 0020 | Delineator for guardrail mono directional yello | EACH A A | 255 | $10.00 | $20.00 | $19.39 |
| 0030 | Delineator for barrier - white | EACH A A | 170 | $12.00 | $19.00 | $18.33 |
| 0040 | Delineator for barrier - yellow | EACH A A | 2,000 | $12.00 | $19.00 | $18.33 |
| 0050 | Temporary signs | SQFT A A | 400 | $0.01 | $0.01 | $0.01 |
| 0060 | Maintain & control traffic | LS A A | 1 | $10,000 | $20,000 | $46,653 |
| 0070 | Maintain & control traffic | LS A A | 1 | $10,000 | $20,000 | $20,931 |
| 0080 | Arrow panel | EACH A A | 2 | $1.00 | $1,500.00 | $7,559.08 |
| 0090 | Flexible delineator post-M/W | EACH A A | 420 | $55.00 | $90.00 | $74.80 |
| 0100 | Flexible delineator post-M/Y | EACH A A | 320 | $55.00 | $90.00 | $74.80 |
| 0110 | Demobilization | LS A A | 1 | $1,750.00 | $2,800.00 | $3,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of October 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.