KYTC contract 26-2198 bid tabulation
GEOTECHNICAL BOSTON ROAD (US 62). Let by Kentucky Transportation Cabinet on May 21, 2026. 2 bids received; low bid $21,992,077 by Schnabel Foundation Company, -34% against the engineer's estimate of $33,513,498.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 21 MAY 2026
- Pay items
- 68
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Schnabel Foundation Company | $21,992,077 | Low | -34% |
| 2 | Richard Goettle Inc | $27,727,000 | +26% | -17% |
Engineer's estimate: $33,513,498.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Schnabel Foundation Company | 2. Richard Goettle Inc |
|---|---|---|---|---|---|
| 0010 | Crushed stone base | TON A A | 3,097 | $43.33 | $41.00 |
| 0020 | Asphalt seal aggregate | TON A A | 41 | $232.62 | $200.00 |
| 0030 | Asphalt seal coat | TON A A | 6 | $2,900.00 | $3,250.00 |
| 0040 | CL3 asph base 1.00D PG64-22 | TON A A | 1,051 | $88.06 | $83.00 |
| 0050 | Asphalt material for tack | TON A A | 4 | $0.01 | $0.10 |
| 0070 | Edgeline rumble strips | LF A A | 2,700 | $2.25 | $2.15 |
| 0080 | CL3 asph surf 0.38A PG64-22 | TON A A | 326 | $108.07 | $101.00 |
| 0090 | Crushed aggregate size no 2 | TON A A | 2,801 | $44.14 | $42.00 |
| 0100 | Barricade-type III | EACH A A | 4 | $157.50 | $150.00 |
| 0110 | Roadway excavation | CUYD A A | 5,309 | $49.22 | $46.00 |
| 0120 | Temporary signs | SQFT A A | 186 | $12.60 | $12.00 |
| 0130 | Mobilization | LS A A | 1 | $1,000,000 | $1,250,000 |
| 0135 | Edge key | LF A A | 112 | $37.45 | $35.00 |
| 0140 | Fabric-geotextile class 1 | SQYD A A | 2,754 | $4.30 | $5.00 |
| 0150 | Fabric-geotextile class 4A | SQYD A A | 3,498 | $6.30 | $6.00 |
| 0160 | Maintain & control traffic | LS A A | 1 | $26,857 | $350,000 |
| 0170 | Portable changeable message sign | EACH A A | 2 | $9,530.00 | $9,000.00 |
| 0190 | Temp silt fence | LF A A | 1,242 | $4.28 | $4.00 |
| 0200 | Staking | LS A A | 1 | $15,000 | $400,000 |
| 0210 | Conc barrier wall type 9T | LF A A | 1,300 | $176.55 | $165.00 |
| 0220 | Temp signal 2 phase | EACH A A | 2 | $22,470 | $50,000 |
| 0230 | Temp seeding and protection | SQYD A A | 1,814 | $0.54 | $0.50 |
| 0240 | Initial fertilizer | TON A A | 0.19 | $1,926.00 | $1,800.00 |
| 0250 | Maintenance fertilizer | TON A A | 0.11 | $1,926.00 | $1,800.00 |
| 0260 | Seeding and protection | SQYD A A | 3,629 | $0.91 | $1.00 |
| 0270 | Agricultural limestone | TON A A | 2.25 | $99.05 | $125.00 |
| 0280 | Pave striping-temp paint-6 in | LF A A | 3,500 | $0.34 | $0.35 |
| 0290 | Pave striping-perm paint-6 in | LF A A | 2,825 | $0.44 | $0.45 |
| 0300 | Pave marking-thermo stop bar-24IN | LF A A | 48 | $18.50 | $18.00 |
| 0301 | Foundation preparation | LS A A | 1 | $1,490,000 | $750,166 |
| 0310 | Crash cushion TY 6 class T TL3 | EACH A A | 2 | $6,196.00 | $9,500.00 |
| 0320 | Asphalt adjustment | DOLL A A | 5,743 | $1.00 | $1.00 |
| 0325 | S bypass pumping | EACH A A | 1 | $18,190 | $17,000 |
| 0330 | Object marker TY 3 | EACH A A | 4 | $300.00 | $300.00 |
| 0340 | Saw cut | LF A A | 2,735 | $2.14 | $2.00 |
| 0345 | Longitudinal edge key | LF A A | 2,735 | $2.80 | $3.00 |
| 0350 | Water blasting existing stripe | LF A A | 2,000 | $2.26 | $2.15 |
| 0352 | Grout | CUYD A A | 1 | $2,365.00 | $2,250.00 |
| 0354 | HDPE pipe | LF A A | 80 | $231.00 | $220.00 |
| 0356 | Steel encasement pipe | LF A A | 12 | $1,155.00 | $1,100.00 |
| 0360 | Electronic delivery MGMT system - agg | LS A A | 1 | $0.10 | $1.00 |
| 0361 | Secant shaft-common | SQFT A A | 47,968 | $190.00 | $145.00 |
| 0362 | Secant shaft-solid rock | SQFT A A | 30,165 | $240.00 | $465.00 |
| 0363 | Secant shaft W/LT WT concrete-common | SQFT A A | 1,682 | $197.00 | $200.00 |
| 0364 | Secant shaft W/LT WT concrete-solid rock | SQFT A A | 127 | $247.00 | $500.00 |
| 0365 | Secant shaft guide wall | LF A A | 991 | $400.00 | $600.00 |
| 0370 | Dga base | TON A A | 200 | $51.36 | $48.00 |
| 0380 | Crushed aggregate size no 8 | TON A A | 100 | $53.50 | $50.00 |
| 0385 | Remove concrete masonry | CUYD A A | 39 | $1,337.50 | $1,250.00 |
| 0386 | Remove & replace fence | LF A A | 35 | $375.00 | $350.00 |
| 0390 | Channel lining class II | TON A A | 150 | $66.15 | $63.00 |
| 0400 | Sand | TON A A | 550 | $43.05 | $41.00 |
| 0405 | Concrete-class A | CUYD A A | 39 | $2,675.00 | $2,500.00 |
| 0407 | Steel reinforcement | LB A A | 5,200 | $5.35 | $5.00 |
| 0410 | CSL testing | EACH A A | 10 | $8,420.00 | $3,500.00 |
| 0420 | Geomembrane liner | SQYD A A | 256 | $12.00 | $40.00 |
| 0430 | Vibration monitoring | LS A A | 1 | $75,000 | $15,000 |
| 0440 | 24 HR falling head perm test in cores | EACH A A | 2 | $24,000 | $71,000 |
| 0450 | Water PSSR test in cores-single packer | EACH A A | 2 | $24,000 | $86,000 |
| 0460 | Secant shaft concrete cores | EACH A A | 10 | $21,672 | $31,000 |
| 0490 | Delineator for barrier - white | EACH A A | 13 | $18.80 | $35.00 |
| 0500 | Delineator for G/R BI directional white | EACH A A | 24 | $15.78 | $20.00 |
| 0510 | G/R terminal section no 1 | EACH A A | 1 | $82.78 | $100.00 |
| 0520 | G/R end treatment type 3 | EACH A A | 3 | $1,833.03 | $5,000.00 |
| 0530 | Remove G/R | LF A A | 2,356 | $3.66 | $2.00 |
| 0540 | G/R steel W beam-S face (7 FT post) | LF A A | 2,300 | $37.63 | $40.00 |
| 0550 | Thrie beam G/R transition TL-3 | EACH A A | 4 | $4,019.58 | $4,500.00 |
| 0560 | Demobilization | LS A A | 1 | $390,000 | $830,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of May 21, 2026. Compiled by Mirage Metrics.