KYTC contract 26-4705 bid tabulation
HIGH FRICTION SURFACE HFST ON VARIOUS ROUTES IN DISTRICT 5. Let by Kentucky Transportation Cabinet on October 22, 2026. 4 bids received; low bid $561,561 by The Truesdell Corporation, -38% against the engineer's estimate of $902,031.
- Owner
- Kentucky Transportation Cabinet
- Letting
- 22 OCT 2026
- Pay items
- 20
- Data through
- 22 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | The Truesdell Corporation | $561,561 | Low | -38% |
| 2 | Ram Construction Services of Michigan Inc | $713,666 | +27% | -21% |
| 3 | A & A Safety Inc | $794,308 | +41% | -12% |
| 4 | Venture Construction NH Inc | $879,026 | +57% | -3.0% |
Engineer's estimate: $902,031.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. The Truesdell Corporation | 2. Ram Construction Services of Michigan Inc | 3. A & A Safety Inc | 4. Venture Construction NH Inc |
|---|---|---|---|---|---|---|---|
| 0010 | Temporary signs | SQFT A A | 1,300 | $1.00 | $2.00 | $1.00 | $9.60 |
| 0020 | Maintain & control traffic | LS A A | 1 | $11,000 | $12,000 | $7,500.00 | $10,050 |
| 0030 | Maintain & control traffic | LS A A | 1 | $11,000 | $12,000 | $4,000.00 | $2,000.00 |
| 0040 | Maintain & control traffic | LS A A | 1 | $9,000.00 | $8,000.00 | $4,000.00 | $2,000.00 |
| 0050 | Maintain & control traffic | LS A A | 1 | $8,000.00 | $8,000.00 | $6,500.00 | $2,000.00 |
| 0060 | Maintain & control traffic | LS A A | 1 | $8,000.00 | $8,000.00 | $6,500.00 | $2,000.00 |
| 0070 | Maintain & control traffic | LS A A | 1 | $4,000.00 | $8,000.00 | $4,000.00 | $2,000.00 |
| 0080 | Truck mounted attenuator | EACH A A | 4 | $2,000.00 | $1,000.00 | $2,000.00 | $5,340.00 |
| 0090 | Portable changeable message sign | EACH A A | 9 | $500.00 | $100.00 | $500.00 | $840.00 |
| 0100 | Arrow panel | EACH A A | 9 | $200.00 | $100.00 | $100.00 | $570.00 |
| 0110 | Pave striping-temp paint-6 in | LF A A | 8,904 | $0.25 | $0.60 | $2.05 | $0.60 |
| 0120 | Pave striping-thermo-6 in W | LF A A | 5,346 | $1.00 | $1.38 | $2.13 | $1.38 |
| 0130 | Pave striping-thermo-6 in Y | LF A A | 3,557 | $1.00 | $1.38 | $2.13 | $1.38 |
| 0140 | Pave marking-thermo stop bar-24IN | LF A A | 83 | $9.55 | $7.15 | $29.40 | $7.15 |
| 0150 | Pave marking-thermo curv arrow | EACH A A | 20 | $95.00 | $100.00 | $320.00 | $100.00 |
| 0160 | Pavement marking removal | SQFT A A | 310 | $6.95 | $3.35 | $4.25 | $3.35 |
| 0170 | Pave mark temp paint stop bar | LF A A | 83 | $7.45 | $3.59 | $7.45 | $3.59 |
| 0180 | Water blasting existing stripe | LF A A | 8,778 | $0.50 | $1.62 | $2.85 | $1.62 |
| 0190 | High friction surface treatment | SQYD A A | 21,060 | $21.00 | $25.46 | $31.30 | $24.90 |
| 0200 | Demobilization | LS A A | 1 | $31,718 | $77,300 | $14,920 | $252,273 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from KYTC's tabulation for this contract. KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
Every contract let that day: KYTC letting of October 22, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.