MoDOT contract 251017-G01 bid tabulation

J7P3511, J7S3398 - VARIOUS ROUTES, ROUTE J,V - BATES COUNTY. Let by Missouri DOT on October 17, 2025, Bates, Southwest. 1 bid received; low bid $504,608 by Realm Construction Inc..

Owner
Missouri DOT
Letting
17 OCT 2025
Pay items
58
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Realm Construction Inc.$504,608Low
MoDOT contract 251017-G01: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Realm Construction Inc.
0020Removal of improvements (2022010)LS1$41,726
0030Misc.linear grading for ADA facilities (2079909)STA2.80$3,898.50
0040Type 1 aggregate for base (4 in. thick) (3040143)SY232$44.75
0050Concrete pavement ( 8 in. non-reinf) (5021108)SY6$637.05
0060Concrete median (6081000)SY23.70$240.00
0070Concrete curb ramp (6081010)SY44.70$369.65
0080Truncated domes (6081012)SF199$28.75
0090Concrete sidewalk, 4 in. (6086004)SY202$169.05
0100Concrete curb (6 in. height and under) type S (6091010)LF52$117.00
0110Construction signs (6161005)SF252$8.05
0120Channelizer (trim-line) (6161025)EACH100$12.65
0130Flashing arrow panel (6161040)EACH2$287.50
0150Changeable message sign without communication interface, contractor furnished retained (6161098A)EACH2$2,098.75
0160Misc.ADA compliant moveable barricade (6169902)EACH16$172.50
0170Mobilization (6181000)LS1$22,526
0180Preformed thermoplastic pavement marking, 24 in. white (6200015)LF528$25.05
0185Preformed thermoplastic pavement marking, 24 in. X 36 in., yield line triangle (6200042A)EACH31$41.40
0190Pavement marking removal (6207001)LF624$1.75
0200Pavement marking removal (symbols) (6207002)EACH7$143.75
0210Contractor furnished surveying and staking (6274000)LS1$2,875.00
0220Turf type tall fescue sodding (8031000A)SY128$13.50
0230Curb inlet check (8061007A)EACH2$164.45
0240Sediment removal (8061016)CY2$86.25
0250SH-flat sheet - signal sign (9020833)SF8$27.90
0260Signal sign, mounting hardware (9020834)EACH8$132.25
0270Post, signal 4 FT. (9022704)EACH2$2,650.75
0280Detector, pushbutton (9024920)EACH8$2,156.25
0290Conduit, 3 in., trench with tracer wire (9025300)LF39$77.65
0300Cable, 6 AWG 1 conductor, power (9028206)LF746$3.30
0310Cable, 16 AWG 2 conductor (9028308)LF1,046$6.90
0320Base, concrete (9029100)CY1$5,146.25
03302.5 in. PSST post - 12 GA. (9031280)LF140$16.65
0340Driven post anchor for 2.5 in. PSST - 7 GA. (9031281A)EACH30$121.90
0350SHF-flat sheet fluorescent (9035069A)SF128$24.15
0360Misc.relocated existing signs (9039902)EACH1$897.00
0370Clearing and grubbing (2013000)ACRE1$10,429
0380Removal of improvements (2022010)LS1$28,343
0390Misc.linear grading for ADA facilities (2079909)STA16.50$2,217.80
0400Type 1 aggregate for base (4 in. thick) (3040143)SY1,213$14.30
0410Gravel (A) or crushed stone (B) (3105003)SY318$21.45
0420Truncated domes (6081012)SF60$29.65
0430Concrete sidewalk, 4 in. (6086004)SY861.40$77.15
0440Concrete sidewalk, 8 in. (6086008)SY68.80$99.35
0450Construction signs (6161005)SF228$7.80
0460Channelizer (trim-line) (6161025)EACH100$11.50
0470Flashing arrow panel (6161040)EACH2$172.50
0490Changeable message sign without communication interface, contractor furnished retained (6161098A)EACH2$1,265.00
0500Misc.ADA compliant moveable barricade (6169902)EACH16$126.50
0510Mobilization (6181000)LS1$24,562
0520Preformed thermoplastic pavement marking, 24 in. white (6200015)LF30$74.75
0530Pavement marking removal (symbols) (6207002)EACH5$345.00
0540Contractor furnished surveying and staking (6274000)LS1$2,875.00
055015 in. pipe group B (7250315A)LF31$101.30
0560Misc.water valve height adjustment (7319902)EACH1$287.50
0570Mulching (8025006)ACRE0.10$172,500
0580Turf type tall fescue sodding (8031000A)SY906$11.20
0590Seeding - cool season grasses (8051000A)ACRE0.10$172,500
0600Silt fence (8061019)LF150$6.40
MoDOT contract 251017-G01: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of October 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way