MoDOT contract 260320-B06 bid tabulation
JST0139B - VARIOUS ROUTES - VARIOUS COUNTIES. Let by Missouri DOT on March 20, 2026, Marion, Northeast. 4 bids received; low bid $869,279 by James H. Drew Corporation.
- Owner
- Missouri DOT
- Letting
- 20 MAR 2026
- Pay items
- 9
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | James H. Drew Corporation | $869,279 | Low |
| 2 | Turpin Infrastructure Solutions LLC | $999,434 | +15% |
| 3 | Collins & Hermann, Inc. | $1,094,934 | +26% |
| 4 | CSD Environmental Services, Inc. | $2,108,082 | +143% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. James H. Drew Corporation | 2. Turpin Infrastructure Solutions LLC | 3. Collins & Hermann, Inc. | 4. CSD Environmental Services, Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $168,569 | $1,000.00 | $248,337 | $167,540 |
| 0020 | Shaping slopes, class III (2153000) | 100F | 123 | $1,663.90 | $1,890.00 | $1,298.98 | $2,542.00 |
| 0030 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $76,622 | $100,500 | $278,921 | $144,200 |
| 0040 | Mobilization (6181000) | LS | 1 | $30,649 | $99,000 | $82,928 | $43,700 |
| 0050 | Contractor furnished surveying and staking (6274000) | LS | 1 | $13,999 | $20,000 | $25,788 | $0.01 |
| 0060 | MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061) | LF | 38 | $72.82 | $45.00 | $38.02 | $54.00 |
| 0070 | MGS height and block transition (6061074) | EACH | 159 | $963.80 | $1,406.00 | $1,040.38 | $3,090.00 |
| 0080 | Misc.commission furnished type A crashworthy end terminal (MASH) (6069902) | EACH | 159 | $1,108.38 | $2,000.00 | $648.89 | $5,546.00 |
| 0090 | Misc.type A crashworthy end terminal (NGT) (MASH) (6069902) | EACH | 8 | $5,316.91 | $400.00 | $3,643.34 | $8,100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of March 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.