MoDOT contract 260320-B06 bid tabulation

JST0139B - VARIOUS ROUTES - VARIOUS COUNTIES. Let by Missouri DOT on March 20, 2026, Marion, Northeast. 4 bids received; low bid $869,279 by James H. Drew Corporation.

Owner
Missouri DOT
Letting
20 MAR 2026
Pay items
9
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1James H. Drew Corporation$869,279Low
2Turpin Infrastructure Solutions LLC$999,434+15%
3Collins & Hermann, Inc.$1,094,934+26%
4CSD Environmental Services, Inc.$2,108,082+143%
MoDOT contract 260320-B06: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. James H. Drew Corporation2. Turpin Infrastructure Solutions LLC3. Collins & Hermann, Inc.4. CSD Environmental Services, Inc.
0010Removal of improvements (2022010)LS1$168,569$1,000.00$248,337$167,540
0020Shaping slopes, class III (2153000)100F123$1,663.90$1,890.00$1,298.98$2,542.00
0030Misc.lump sum temporary traffic control (6169901)LS1$76,622$100,500$278,921$144,200
0040Mobilization (6181000)LS1$30,649$99,000$82,928$43,700
0050Contractor furnished surveying and staking (6274000)LS1$13,999$20,000$25,788$0.01
0060MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061)LF38$72.82$45.00$38.02$54.00
0070MGS height and block transition (6061074)EACH159$963.80$1,406.00$1,040.38$3,090.00
0080Misc.commission furnished type A crashworthy end terminal (MASH) (6069902)EACH159$1,108.38$2,000.00$648.89$5,546.00
0090Misc.type A crashworthy end terminal (NGT) (MASH) (6069902)EACH8$5,316.91$400.00$3,643.34$8,100.00
MoDOT contract 260320-B06: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of March 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy