NYSDOT contract D265444 bid tabulation

ASPHALT PAVEMENT RESURFACING - NY Rtes 24 & 102. Let by New York State DOT on March 13, 2025, Nassau, Region 10. 6 bids received; low bid $13,755,753 by Posillico Civil Inc.

Owner
New York State DOT
Letting
13 MAR 2025
Pay items
102
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Posillico Civil Inc$13,755,753Low
2Pratt Brothers Inc$14,404,040+5.0%
3Suffolk Paving Corp$14,438,941+5.0%
4H & L Contracting LLC$16,887,000+23%
5Jrcruz Corp$17,813,737+30%
6Tully Construction Company Inc$23,822,340+73%
NYSDOT contract D265444: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Posillico Civil Inc2. Pratt Brothers Inc3. Suffolk Paving Corp4. H & L Contracting LLC5. Jrcruz Corp6. Tully Construction Company Inc
1Clearing and Grubbing (201.06)LS1$50,000$12,472$20,000$25,000$50,000$35,000
2Unclassified Excavation and Disposal (203.02)CY6$400.00$195.00$1,000.00$45.00$100.00$1,000.00
3 (206.03100010)40$70.00$25.00$100.00$140.00$100.00$195.00
4 (304.00010018)2,556$5.00$4.00$1.50$1.00$5.00$26.00
5 (304.10119917)6$200.00$175.00$1,000.00$100.00$100.00$125.00
6 (404.0001)TON1,423$125.00$125.00$125.00$125.00$125.00$125.00
7Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT1,423$125.00$125.00$125.00$125.00$125.00$125.00
8Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT1,116$125.00$125.00$125.00$125.00$125.00$125.00
9 (404.0189)TON883$147.50$175.00$150.00$140.00$155.00$225.00
10 (404.0961)TON27,500$147.50$142.00$125.00$170.00$170.00$225.00
11 (404.1989)TON70$650.00$750.00$250.00$440.00$500.00$360.00
12Diluted Tack Coat (407.0102)GAL21,432$1.00$4.95$5.25$3.00$6.00$13.00
13Asphalt Pavement Joint Adhesive (418.7603)LF146,306$0.75$0.70$1.00$0.72$0.75$1.95
14Production Cold Milling of Bituminous Concrete (490.10)SY236,000$3.35$5.25$5.50$5.25$6.50$12.00
15Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY26,124$3.35$3.00$6.50$12.00$14.00$26.64
16 (502.10010018)LS1$25,000$10,000$5,000.00$5,000.00$25,000$6,000.00
17 (502.31010018)284$250.00$200.00$120.00$120.00$350.00$475.00
18 (502.32010010)712$60.00$76.00$60.00$100.00$50.00$140.00
19 (502.36030018)71$1,800.00$1,550.00$1,200.00$1,800.00$2,400.00$2,700.00
20 (502.36230018)130$2,600.00$3,000.00$1,200.00$1,600.00$3,000.00$2,700.00
21 (502.37010018)21$15.00$20.00$20.00$15.00$75.00$24.00
22 (520.09000010)23,385$3.00$4.00$4.00$3.00$2.50$10.00
23Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH348$60.00$200.00$50.00$220.00$50.00$100.00
24 (604.07200110)212$1,800.00$1,400.00$2,500.00$3,500.00$2,700.00$2,800.00
25 (604.07210110)30$2,500.00$1,250.00$2,500.00$3,500.00$1,500.00$2,800.00
26 (604.07240110)7$4,500.00$4,500.00$10,000$5,000.00$3,000.00$10,500
27 (604.07290010)2,790$10.00$50.00$100.00$110.00$100.00$375.00
28 (604.07800010)30$4,000.00$1,600.00$2,500.00$1,700.00$1,000.00$4,200.00
29Prefabricated Adjustment Frames for Drainage Structures (604.11)EACH1$100.00$750.00$5,000.00$400.00$6,500.00$3,600.00
30 (608.01050010)67$1,880.00$1,600.00$1,800.00$1,200.00$1,750.00$1,500.00
31 (608.01050109)39$6,350.00$6,400.00$7,000.00$4,650.00$6,500.00$10,000
32 (608.01050209)3$6,600.00$6,600.00$7,300.00$4,850.00$6,500.00$10,000
33 (608.01050309)11$11,250$11,250$12,400$9,000.00$6,500.00$10,000
34 (608.01050409)11$10,200$10,200$11,250$7,500.00$6,500.00$11,000
35 (608.01050709)2$10,650$10,700$11,725$7,000.00$7,000.00$12,500
36 (608.01050909)2$9,550.00$9,600.00$10,525$5,900.00$7,000.00$10,000
37 (608.01051009)1$9,800.00$9,800.00$10,800$8,200.00$6,500.00$14,000
38 (608.01051109)3$6,750.00$6,800.00$7,425.00$3,800.00$6,500.00$13,000
39 (608.02010015)300$450.00$175.00$150.00$10.00$150.00$280.00
40 (608.02020015)200$26.00$48.00$150.00$20.00$95.00$225.00
41Surface-Applied Detectable Warning Units (608.20)SY34$795.00$795.00$875.00$800.00$350.00$120.00
42 (609.04010510)861$85.00$83.00$77.00$50.00$165.00$125.00
43 (609.04030510)20$150.00$83.00$77.00$50.00$150.00$245.00
44 (609.06000008)881$24.00$6.00$50.00$33.00$40.00$30.00
45Topsoil - Roadside (610.1402)CY22$120.00$140.00$110.00$120.00$100.00$145.00
46Turf Establishment - Roadside (610.1601)SY133$15.00$18.00$11.00$15.00$10.00$18.00
47Watering Vegetation (610.19)1,000 GALLONS20$98.00$98.00$110.00$98.00$1,000.00$118.00
48Basic Work Zone Traffic Control (619.01)LS1$650,000$816,363$570,000$1,250,000$1,780,000$2,200,000
49Type III Construction Barricades (619.04)EACH58$100.00$125.00$100.00$140.00$400.00$180.00
50 (619.0901)LF18,300$0.44$0.50$1.00$0.44$0.65$0.50
51 (619.10050020)750$40.00$75.00$100.00$10.00$50.00$140.00
52 (619.111133)EACH13$3,000.00$12,000$15,000$45,000$10,000$16,000
53Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611)MONTH592$205.00$205.00$500.00$205.00$320.00$245.00
54Nighttime Operations (Entire Project) (619.24)LS1$475,000$255,000$300,000$978,732$250,000$600,000
55Traffic Control Supervisor (619.25)MONTH8$100.00$10,000$10,000$100.00$10,500$1,800.00
56Pavement Patching (Force Acount) (619.2601)DOL40,000$1.00$1.00$1.00$1.00$1.00$1.00
57Cleaning Closed Drainage Systems (621.03)LF6,141$3.00$3.50$6.00$9.50$10.00$12.00
58Cleaning Drainage Structures (621.04)EACH279$1,000.00$1,350.00$1,000.00$550.00$650.00$1,100.00
59Survey Operations (625.01)LS1$40,000$45,000$75,000$10,000$150,000$90,000
60 (625.09010015)LS1$6,000.00$12,500$20,000$2,500.00$25,000$120,000
61Cleaning, Sealing and/or Filling Cracks (633.12)LS1$250,000$235,000$215,000$200,000$25,000$240,000
62Cleaning, Sealing and/or Filling Joints (633.13)LF6,004$11.00$10.70$15.00$10.70$15.00$13.00
63Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15)SY377$20.00$121.00$100.00$75.00$800.00$200.00
64Engineer’s Field Office – Type 3 (637.13)MONTH16$8,300.00$6,500.00$5,000.00$7,000.00$7,500.00$15,000
65Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00$1.00$1.00
66Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
67 (645.03030015)7$2,895.00$2,895.00$3,300.00$2,895.00$4,000.00$4,200.00
68Ground-Mounted Sign Panels without Z-bars (645.5101)SF144$74.00$74.00$66.00$74.00$90.00$145.00
69Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF454$69.50$70.00$66.00$69.50$90.00$150.00
70Type A Sign Posts (645.81)EACH34$305.00$305.00$330.00$305.00$380.00$450.00
71 (645.830202)EACH2$5,893.00$5,900.00$4,400.00$5,893.00$7,500.00$3,800.00
72Pole-Mounted Sign Support System (Band Mounting) (645.85)EACH33$850.00$850.00$330.00$850.00$1,200.00$120.00
73Reference Marker Panel (646.21)EACH113$78.00$78.00$44.00$78.00$100.00$100.00
74Steel Post, 1.1 lb/ft (646.31)EACH90$100.00$100.00$165.00$100.00$125.00$240.00
75Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH26$470.00$470.00$550.00$470.00$600.00$390.00
76Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH111$173.00$173.00$220.00$173.00$220.00$180.00
77Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH16$110.00$110.00$220.00$110.00$135.00$180.00
78 (647.83001002)25$25.00$25.00$55.00$25.00$32.00$30.00
79Cast Frame F3, Mountable Curb Box CM3 & Reticuline Grate G3 (655.0703)EACH165$1,900.00$2,200.00$2,500.00$2,440.00$3,000.00$1,900.00
80 (655.07030010)31$1,700.00$1,775.00$2,000.00$2,900.00$3,250.00$1,550.00
81Manhole Frame & Grate (655.1201)EACH14$600.00$750.00$1,000.00$600.00$2,000.00$700.00
82Manhole Frame & Cover (655.1202)EACH2$600.00$750.00$2,500.00$600.00$2,500.00$600.00
83Adjust Existing Valve Box Elevation (663.33)EACH12$150.00$90.00$100.00$500.00$1,200.00$2,400.00
84 (663.51000004)12$1,000.00$896.47$2,500.00$990.00$5,000.00$4,400.00
85 (680.05010007)35$24,000$25,000$25,000$24,000$24,000$30,000
86 (680.05020007)4$4,136.00$4,400.00$4,000.00$4,130.00$5,000.00$5,000.00
87 (680.520205)LF40$37.70$50.00$100.00$37.00$185.00$45.00
88 (680.80326110)4$5,304.00$5,600.00$7,500.00$5,300.00$10,000$6,400.00
89 (680.83200010)LS1$10,000$25,000$25,000$15,000$25,000$12,000
90 (685.07200110)90,800$0.72$0.72$0.80$0.72$0.75$0.87
91 (685.07200210)70$125.00$125.00$150.00$125.00$200.00$150.00
92 (685.07200310)244$150.00$150.00$175.00$150.00$200.00$180.00
93 (685.07200410)2,508$1.75$1.75$2.00$1.75$2.00$2.11
94 (685.07200510)63,237$2.00$1.98$2.25$1.98$3.00$2.39
95 (685.07200610)67,740$0.72$0.72$0.80$0.72$1.00$0.87
96 (685.07200710)11,103$1.75$1.75$2.00$1.75$2.00$2.11
97 (691.04000020)67,200$1.00$1.00$1.00$1.00$1.00$1.00
98Field Change Payment (FCP) (697.03)DOL1,028,454.70$1.00$1.00$1.00$1.00$1.00$1.00
99Asphalt Price Adjustment (698.04)DOL82,738$1.00$1.00$1.00$1.00$1.00$1.00
100Fuel Price Adjustment (698.05)DOL11,678$1.00$1.00$1.00$1.00$1.00$1.00
101Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00$1.00
102Mobilization (699.040001)LS1$529,067$550,000$555,343$645,000$685,144$700,000
NYSDOT contract D265444: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of March 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy