NYSDOT contract D265500 bid tabulation
PAVEMENT PRESERVATION (ASPHALT). Let by New York State DOT on June 26, 2025, Kings, Queens, Region 11. 4 bids received; low bid $5,750,000 by H & L Contracting LLC.
- Owner
- New York State DOT
- Letting
- 26 JUN 2025
- Pay items
- 57
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | H & L Contracting LLC | $5,750,000 | Low |
| 2 | Tully Construction Company Inc | $5,849,234 | +2.0% |
| 3 | Restani Construction Corp | $7,775,618 | +35% |
| 4 | Jrcruz Corp | $8,223,552 | +43% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. H & L Contracting LLC | 2. Tully Construction Company Inc | 3. Restani Construction Corp | 4. Jrcruz Corp |
|---|---|---|---|---|---|---|---|
| 1 | (209.11010024) | 147 | $200.00 | $275.00 | $50.00 | $250.00 | |
| 2 | (304.00010018) | 9,300 | $1.00 | $4.00 | $2.00 | $5.00 | |
| 3 | (402.25020018) | 12,442 | $9.00 | $9.00 | $9.00 | $7.00 | |
| 4 | (404.0001) | TON | 586 | $160.00 | $160.00 | $160.00 | $160.00 |
| 5 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 578 | $160.00 | $160.00 | $160.00 | $160.00 |
| 6 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 578 | $160.00 | $160.00 | $160.00 | $160.00 |
| 7 | (404.0189) | TON | 154 | $160.00 | $140.00 | $140.00 | $200.00 |
| 8 | (404.0951) | TON | 10,334 | $183.00 | $160.00 | $200.00 | $215.00 |
| 9 | (404.1959) | TON | 1,222 | $162.00 | $150.00 | $200.00 | $225.00 |
| 10 | Diluted Tack Coat (407.0102) | GAL | 9,108 | $3.21 | $8.50 | $5.00 | $7.00 |
| 11 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 70,912 | $0.80 | $0.50 | $2.50 | $0.55 |
| 12 | (490.10110011) | 83,695 | $5.00 | $7.50 | $11.00 | $9.00 | |
| 13 | (490.10120011) | 10,853 | $14.00 | $10.00 | $15.00 | $15.00 | |
| 14 | (510.00210018) | 28 | $600.00 | $1,250.00 | $500.00 | $3,200.00 | |
| 15 | (510.20000018) | 57 | $100.00 | $525.00 | $200.00 | $300.00 | |
| 16 | (510.81000018) | 80 | $60.00 | $40.00 | $40.00 | $60.00 | |
| 17 | (510.81100018) | 9 | $60.00 | $40.00 | $130.00 | $100.00 | |
| 18 | (510.91000018) | 168 | $6.00 | $10.00 | $30.00 | $60.00 | |
| 19 | (510.91100018) | 19 | $6.00 | $10.00 | $20.00 | $100.00 | |
| 20 | (604.07200110) | 29 | $800.00 | $3,400.00 | $1,000.00 | $2,500.00 | |
| 21 | (604.07210110) | 29 | $800.00 | $3,400.00 | $500.00 | $1,500.00 | |
| 22 | (604.07290010) | 171 | $125.00 | $400.00 | $250.00 | $150.00 | |
| 23 | (606.30800015) | 1,758 | $40.00 | $50.00 | $60.00 | $35.00 | |
| 24 | Optional Curb (Precast Concrete Type PT4 or Cast-In-Place Concrete Type T4) (609.0903) | LF | 924 | $65.00 | $100.00 | $100.00 | $150.00 |
| 25 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $379,568 | $328,000 | $1,000,000 | $1,129,000 |
| 26 | (619.080102) | LF | 2,078 | $2.32 | $2.00 | $2.25 | $1.50 |
| 27 | (619.0901) | LF | 48,749 | $0.41 | $0.30 | $0.40 | $0.60 |
| 28 | (619.10050020) | 647 | $20.01 | $120.00 | $50.00 | $123.00 | |
| 29 | (619.110512) | EACH | 3 | $10,790 | $7,500.00 | $20,000 | $12,500 |
| 30 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $145,000 | $80,000 | $300,000 | $225,000 |
| 31 | Cleaning Closed Drainage Systems (621.03) | LF | 3,945 | $6.00 | $10.00 | $15.00 | $18.00 |
| 32 | Cleaning Drainage Structures (621.04) | EACH | 147 | $870.00 | $800.00 | $1,000.00 | $738.00 |
| 33 | Survey Operations (625.01) | LS | 1 | $40,000 | $20,000 | $175,000 | $80,000 |
| 34 | Cleaning, Sealing and/or Filling Joints (633.13) | LF | 827 | $23.00 | $12.00 | $79.00 | $10.00 |
| 35 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 109 | $45.00 | $125.00 | $50.00 | $500.00 |
| 36 | Stress Relieving Pavement Repairs (633.16) | SY | 600 | $305.00 | $137.00 | $150.00 | $350.00 |
| 37 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 15 | $6,500.00 | $6,000.00 | $9,000.00 | $12,500 |
| 38 | (637.31020020) | 15 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | |
| 39 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 40 | (639.10210011) | LS | 1 | $60,000 | $60,000 | $60,000 | $60,000 |
| 41 | (655.00040011) | 29 | $395.00 | $500.00 | $500.00 | $1,440.00 | |
| 42 | (655.00120011) | 29 | $500.00 | $450.00 | $725.00 | $1,138.00 | |
| 43 | (655.16000011) | 29 | $325.00 | $500.00 | $250.00 | $400.00 | |
| 44 | (662.62000010) | 9 | $1,100.00 | $2,400.00 | $1,000.00 | $900.00 | |
| 45 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 14,416 | $2.01 | $2.00 | $1.95 | $1.40 |
| 46 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 900 | $2.01 | $2.00 | $1.95 | $1.40 |
| 47 | (685.16010014) | 107,955 | $1.39 | $1.50 | $1.35 | $2.50 | |
| 48 | (685.17010014) | 43,496 | $1.39 | $1.50 | $1.35 | $2.50 | |
| 49 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 292 | $2.01 | $2.00 | $1.95 | $6.00 |
| 50 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 8 | $139.37 | $135.00 | $135.00 | $150.00 |
| 51 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 3 | $173.44 | $168.00 | $168.00 | $360.00 |
| 52 | (691.04000020) | 126,000 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 53 | Field Change Payment (FCP) (697.03) | DOL | 490,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 54 | Asphalt Price Adjustment (698.04) | DOL | 22,330 | $1.00 | $1.00 | $1.00 | $1.00 |
| 55 | Fuel Price Adjustment (698.05) | DOL | 5,463 | $1.00 | $1.00 | $1.00 | $1.00 |
| 56 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 57 | Mobilization (699.040001) | LS | 1 | $220,000 | $210,000 | $295,000 | $316,290 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of June 26, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.