NYSDOT contract D265534 bid tabulation

Asphalt Pavement Resurfacing - Northern State Parkway. Let by New York State DOT on July 24, 2025, Nassau, Suffolk, Region 10. 5 bids received; low bid $18,542,595 by Posillico Civil Inc.

Owner
New York State DOT
Letting
24 JUL 2025
Pay items
160
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Posillico Civil Inc$18,542,595Low
2H & L Contracting LLC$18,580,0000.0%
3Rosemar Contracting Inc$18,942,952+2.0%
4Pratt Brothers Inc$21,242,000+15%
5Tully Construction Company Inc$25,990,386+40%
NYSDOT contract D265534: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Posillico Civil Inc2. H & L Contracting LLC3. Rosemar Contracting Inc4. Pratt Brothers Inc5. Tully Construction Company Inc
1Clearing and Grubbing (201.06)LS1$40,000$20,000$30,000$66,123$25,000
2Unclassified Excavation and Disposal (203.02)CY200$100.00$30.00$800.00$225.00$290.00
3Select Granular Fill (203.07)CY129$65.00$65.00$20.00$30.00$225.00
4Trench and Culvert Excavation (206.0201)CY270$1.00$25.00$21.00$15.00$280.00
5Conduit Excavation and Backfill including Surface Restoration (206.03)LF700$65.00$5.00$100.00$121.00$345.00
6 (304.00010018)2,600$2.00$1.00$2.00$3.00$6.00
7 (304.10119917)75$95.00$40.00$80.00$50.00$275.00
8 (402.90710118)1,100$400.00$350.00$300.00$295.00$470.00
9 (404.0001)TON2,525$125.00$125.00$125.00$125.00$125.00
10Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT2,430$125.00$125.00$125.00$125.00$125.00
11Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT2,431$125.00$125.00$125.00$125.00$125.00
12 (404.0189)TON2,430$132.00$90.00$131.25$115.00$150.00
13 (404.02000118)30$3,000.00$3,000.00$3,000.00$3,000.00$3,000.00
14 (404.0681)TON33$132.00$400.00$250.00$235.00$150.00
15 (404.0951)TON48,600$132.00$150.25$131.25$136.00$155.00
16 (404.1989)TON1,700$80.00$150.00$225.00$292.00$186.00
17 (404.2589)TON175$80.00$100.00$225.00$525.00$420.00
18Diluted Tack Coat (407.0102)GAL45,000$0.10$0.01$3.00$4.80$7.50
19Asphalt Pavement Joint Adhesive (418.7603)LF385,700$0.54$0.54$0.58$0.65$1.00
20Production Cold-Mill Surface Planing of Bituminous Concrete (490.15)SY353,000$3.00$3.65$4.00$4.95$5.60
21 (490.17011018)9,500$7.50$10.00$6.00$11.25$10.50
22Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY80,500$0.50$5.00$6.00$10.50$8.50
23 (502.10010018)LS1$15,000$4,000.00$5,000.00$15,000$17,250
24 (510.00210018)85$1,500.00$1,100.00$1,150.00$1,900.00$1,800.00
25 (510.02210018)30$4,000.00$1,100.00$1,300.00$2,000.00$1,850.00
26 (510.20000018)615$315.00$85.00$95.00$40.00$220.00
27 (510.81000018)704$40.00$50.00$42.00$80.00$100.00
28 (510.91000018)55$17.23$11.00$50.00$30.00$20.00
29 (520.05000010)50$20.00$20.00$5.25$50.00$10.00
30 (520.09000010)4,000$3.00$2.00$4.00$3.95$6.00
31Shields and Shoring (552.17)SF3,000$1.00$0.10$0.40$3.25$5.00
32Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH60$100.00$125.00$70.00$69.00$90.00
33 (603.6002)LF150$120.00$125.00$80.00$160.00$260.00
34 (604.07200110)63$1,085.00$3,100.00$2,500.00$1,250.00$4,200.00
35 (604.07210110)20$475.00$3,000.00$2,500.00$1,250.00$4,200.00
36 (604.07240110)20$5,260.00$3,000.00$3,300.00$2,655.00$2,600.00
37 (604.07290010)295$150.00$45.00$150.00$115.00$300.00
38 (604.07800010)35$460.00$500.00$800.00$2,200.00$2,650.00
39 (604.501003)LF10$2,025.00$1,640.00$1,500.00$2,500.00$1,600.00
40 (604.501011)LF7.20$1,950.00$1,650.00$1,500.00$2,310.00$1,600.00
41 (604.501023)LF9.30$2,100.00$1,760.00$1,500.00$1,945.00$1,400.00
42Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013)QUALITY UNIT1$125.00$125.00$125.00$125.00$125.00
43 (608.01050109)6$8,250.00$8,500.00$10,200$10,400$8,400.00
44 (608.01050209)15$8,450.00$6,500.00$10,000$10,600$10,000
45 (608.01051009)1$7,950.00$15,000$10,100$10,100$12,500
46 (608.01051209)2$19,500$24,000$24,000$22,400$18,000
47 (608.01051309)1$8,400.00$7,000.00$9,900.00$10,500$12,000
48 (608.01051409)7$8,575.00$7,000.00$10,100$10,700$9,500.00
49 (608.02010015)390$300.00$5.00$200.00$145.00$320.00
50Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102)TON20$600.00$525.00$800.00$800.00$800.00
51 (608.02020015)195$10.00$10.00$50.00$182.00$125.00
52Surface-Applied Detectable Warning Units (608.20)SY1$1,750.00$905.00$1,750.00$1,750.00$120.00
53 (609.04010510)70$300.00$95.00$180.00$190.00$170.00
54 (609.04070510)272$225.00$130.00$180.00$190.00$150.00
55Topsoil - Roadside (610.1402)CY130$110.00$110.00$100.00$125.00$88.00
56Topsoil - Lawns (610.1403)CY2$250.00$250.00$100.00$125.00$200.00
57Turf Establishment - Roadside (610.1601)SY1,175$6.75$6.75$7.00$9.00$5.10
58Turf Establishment -Lawns (610.1602)SY19$75.00$75.00$10.00$13.00$50.00
59Watering Vegetation (610.19)1,000 GALLONS20$150.00$150.00$150.00$150.00$120.00
60Basic Work Zone Traffic Control (619.01)LS1$1,519,285$700,000$920,000$1,125,000$2,200,000
61Type III Construction Barricades (619.04)EACH300$65.00$50.00$125.00$160.00$25.00
62 (619.0901)LF596,000$0.34$0.35$0.34$0.40$0.34
63 (619.10050020)876$35.00$10.00$34.00$75.00$140.00
64 (619.110943)EACH5$2,500.00$8,500.00$9,500.00$17,000$7,300.00
65 (619.111133)EACH7$2,500.00$8,500.00$12,000$17,000$8,400.00
66Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611)MONTH11$2,500.00$2,500.00$2,500.00$465.00$465.00
67 (619.161401)EACH5$1,400.00$1,400.00$1,400.00$3,500.00$2,745.00
68Vehicle Arresting Barrier (619.23)EACH27$500.00$121.58$3,500.00$1.00$4,000.00
69Nighttime Operations (Entire Project) (619.24)LS1$702,376$739,588$475,000$495,000$1,450,000
70Traffic Control Supervisor (619.25)MONTH9$100.00$100.00$2,000.00$1,000.00$16,000
71Pavement Patching (Force Acount) (619.2601)DOL40,000$1.00$1.00$1.00$1.00$1.00
72Cleaning Closed Drainage Systems (621.03)LF17,300$6.00$7.00$5.00$3.50$15.50
73Cleaning Drainage Structures (621.04)EACH160$875.00$728.00$750.00$885.00$820.00
74Survey Operations (625.01)LS1$25,000$60,000$90,000$95,000$125,000
75 (625.09010015)LS1$3,000.00$2,500.00$2,500.00$10,000$42,750
76Cleaning, Sealing and/or Filling Cracks (633.12)LS1$320,000$100,000$230,000$525,000$392,400
77Cleaning, Sealing and/or Filling Joints (633.13)LF37,100$1.00$3.00$6.00$7.50$7.50
78Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15)SY5,700$10.00$10.00$10.00$28.00$90.00
79Concrete Cylinder Curing Equipment (637.04)EACH1$4,000.00$3,500.00$2,500.00$1,500.00$6,000.00
80Engineer’s Field Office – Type 3 (637.13)MONTH15$8,670.00$6,000.00$5,100.00$7,000.00$8,500.00
81Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00$1.00$1.00
82Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00$1.00$1.00
83Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00$1.00$1.00
84 (637.41000115)11$60.00$175.00$175.00$200.00$240.00
85 (637.41000215)11$60.00$175.00$175.00$200.00$240.00
86 (637.41000315)11$60.00$175.00$175.00$200.00$240.00
87 (637.41000415)11$60.00$175.00$175.00$200.00$240.00
88 (637.41000515)11$60.00$175.00$175.00$200.00$240.00
89 (637.41000615)11$60.00$175.00$175.00$200.00$240.00
90 (645.03040015)2$6,317.00$4,000.00$4,000.00$4,300.00$1,200.00
91 (645.52010110)10$59.00$95.00$60.00$60.00$125.00
92 (645.52020110)182$67.00$75.00$60.00$60.00$125.00
93 (645.52030110)70$71.00$52.00$60.00$60.00$125.00
94Type A Sign Posts (645.81)EACH25$300.00$315.00$275.00$275.00$375.00
95High-Capacity Type A Sign Posts with Soil Plates Only (645.8106)EACH4$1,500.00$2,700.00$1,500.00$1,500.00$1,200.00
96 (645.81090003)12$75.00$100.00$100.00$100.00$250.00
97Reference Marker Panel (646.21)EACH60$35.00$75.00$50.00$50.00$65.00
98Steel Post, 1.1 lb/ft (646.31)EACH5$100.00$175.00$150.00$150.00$125.00
99Steel Post, 2.0 lb/ft (646.32)EACH12$150.00$225.00$150.00$150.00$150.00
100Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH5$75.00$50.00$400.00$400.00$150.00
101Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61)EACH12$75.00$50.00$250.00$250.00$250.00
102Remove and Dispose High Capacity Type A Ground Mounted Sign Support and Foundation (647.64)EACH2$75.00$100.00$1,000.00$1,000.00$250.00
103 (647.83001002)60$75.00$15.00$50.00$50.00$75.00
104Pavement Ride Quality Adjustment to Asphalt Level 2 (653.1020)QUALITY UNIT1,456$125.00$125.00$125.00$125.00$125.00
105 (655.05170010)20$1,765.00$1,200.00$1,000.00$1,995.00$2,100.00
106Cast Frame F3, Mountable Curb Box CM3 & Reticuline Grate G3 (655.0703)EACH16$1,765.00$1,475.00$1,500.00$1,560.00$1,900.00
107 (655.07030010)34$1,385.00$1,200.00$1,500.00$1,225.00$1,500.00
108Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706)EACH16$1,600.00$1,340.00$1,500.00$1,900.00$1,900.00
109Manhole Frame & Cover (655.1202)EACH10$510.00$425.00$800.00$560.00$600.00
110 (657.15020010)70$9.75$10.00$50.00$50.00$25.00
111 (657.16020010)4$282.00$250.00$250.00$250.00$250.00
112 (657.17020010)1$5,000.00$2,000.00$4,000.00$295.00$295.00
113 (662.62000010)2$450.00$2,200.00$1,200.00$995.00$5,200.00
114Adjust Existing Valve Box Elevation (663.33)EACH5$150.00$475.00$150.00$95.00$1,200.00
115 (670.0106)EACH1$3,000.00$3,800.00$3,600.00$5,350.00$4,000.00
116 (670.1130)EACH1$4,800.00$4,800.00$4,800.00$6,250.00$5,140.00
117Breakaway Transformer Base (Aluminum) (670.19)EACH1$900.00$900.00$900.00$1,600.00$1,535.00
118 (670.7105)LF300$5.00$5.00$5.00$5.80$5.50
119Ground Wire No. 6 AWG. (670.7501)LF340$4.00$4.00$4.00$5.40$5.10
120Performance Concrete Quality Adjustment (670.99)QUALITY UNIT1$21.49$21.49$21.49$21.49$21.49
121Pole Excavation and Concrete Foundation (680.5001)CY6$5,900.00$3,600.00$1,800.00$3,500.00$2,500.00
122 (680.520103)LF90$16.00$16.00$16.00$32.00$30.00
123 (680.520106)LF250$26.00$26.00$26.00$42.00$41.00
124 (680.520110)LF30$79.00$79.00$79.00$78.00$78.00
125 (680.520203)LF685$16.00$16.00$16.00$29.00$28.10
126 (680.53010010)260$2.50$2.50$2.50$13.00$12.80
127Inductance Loop Installation (680.54)LF4,650$24.04$19.00$19.00$44.00$42.00
128 (680.58802008)6$1,200.00$1,200.00$1,200.00$1,650.00$1,533.00
129Shielded Lead-in Cable (680.71)LF4,105$3.50$3.50$3.50$3.60$3.60
130Inductance Loop Wire (680.72)LF16,600$3.00$3.00$3.00$2.25$2.11
131 (680.79490010)14$1,783.45$500.00$500.00$2,600.00$1,520.00
132 (680.83200010)LS1$5,000.00$5,000.00$5,000.00$25,000$15,000
133Performance Concrete Quality Adjustment (680.99)QUALITY UNIT1$12.50$12.50$12.50$12.50$12.50
134 (680.99060010)19$2,500.00$2,500.00$2,500.00$1,000.00$930.00
135 (680.99910011)LS1$5,000.00$5,000.00$5,000.00$30,000$22,100
136 (683.04205010)1$33,000$33,000$33,000$55,000$45,300
137 (683.07101210)1$280.00$280.00$280.00$500.00$457.00
138 (683.07250010)470$12.00$12.00$12.00$5.00$5.00
139 (683.10110008)1$8,120.00$8,120.00$8,120.00$9,200.00$8,763.00
140 (683.10340010)16$1,450.00$1,450.00$1,450.00$1,800.00$1,576.00
141 (683.91150010)10$15,900$15,900$15,900$16,000$14,774
142 (683.95050010)2$5,400.00$5,400.00$5,400.00$5,400.00$5,358.00
143 (685.02000010)510$77.84$14.95$40.00$45.00$12.00
144 (685.03100018)515$124.82$128.00$125.00$125.00$125.00
145 (685.03110018)7$124.82$128.00$125.00$125.00$125.00
146 (685.03130018)250$149.78$154.00$150.00$150.00$150.00
147 (685.07200110)228,700$0.56$0.58$0.56$0.56$0.56
148 (685.07200210)156$124.82$128.00$125.00$125.00$125.00
149 (685.07200310)32$149.78$154.00$150.00$150.00$150.00
150 (685.07200410)25,000$1.80$1.85$1.80$1.80$1.80
151 (685.07200510)9,600$2.60$2.68$2.60$2.60$2.60
152 (685.07200610)159,000$0.56$0.58$0.56$0.56$0.56
153 (685.07200710)1,150$1.80$1.85$1.80$1.80$1.80
154 (685.20010004)46,400$1.60$1.65$1.60$1.60$1.60
155 (691.04000020)54,600$1.00$1.00$1.00$1.00$1.00
156Field Change Payment (FCP) (697.03)DOL1,510,000$1.00$1.00$1.00$1.00$1.00
157Asphalt Price Adjustment (698.04)DOL117,257$1.00$1.00$1.00$1.00$1.00
158Fuel Price Adjustment (698.05)DOL18,976$1.00$1.00$1.00$1.00$1.00
159Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00$1.00$1.00
160Mobilization (699.040001)LS1$713,177$700,000$700,773$800,000$950,000
NYSDOT contract D265534: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of July 24, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy