NYSDOT contract D265611 bid tabulation
CULVERT REPLACEMENTS AND REHABS - Various Locations. Let by New York State DOT on January 8, 2026, Orange, Region 08. 5 bids received; low bid $9,207,000 by J D'Annunzio & Sons Inc.
- Owner
- New York State DOT
- Letting
- 08 JAN 2026
- Pay items
- 144
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | J D'Annunzio & Sons Inc | $9,207,000 | Low |
| 2 | Argenio Brothers Inc | $9,964,964 | +8.0% |
| 3 | Thomas M Brennan Inc/DBA:Brennan Construction Company | $13,340,395 | +45% |
| 4 | Scape-Tech Landscape Technology Inc. | $14,493,990 | +57% |
| 5 | Jrcruz Corp | $15,767,000 | +71% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. J D'Annunzio & Sons Inc | 2. Argenio Brothers Inc | 3. Thomas M Brennan Inc/DBA:Brennan Construction Company | 4. Scape-Tech Landscape Technology Inc. | 5. Jrcruz Corp |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $100,000 | $240,241 | $100,000 | $228,000 | $500,000 |
| 2 | (201.07000004) | 8 | $1,100.00 | $125.00 | $3,000.00 | $305.00 | $500.00 | |
| 3 | Removal of Substructures (202.19) | CY | 230 | $350.00 | $405.00 | $300.00 | $180.00 | $625.00 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 1,756 | $95.00 | $54.25 | $125.00 | $118.00 | $150.00 |
| 5 | Embankment In Place (203.03) | CY | 10,574 | $120.00 | $37.25 | $65.00 | $134.00 | $100.00 |
| 6 | Select Granular Fill (203.07) | CY | 877 | $100.00 | $215.00 | $130.00 | $160.00 | $110.00 |
| 7 | Select Structural Fill (203.21) | CY | 277 | $95.00 | $189.00 | $130.00 | $152.00 | $140.00 |
| 8 | (203.24010017) | 32 | $100.00 | $117.00 | $175.00 | $68.00 | $200.00 | |
| 9 | Lightweight Concrete Fill (Type B) (204.04) | CY | 2 | $2,200.00 | $6,000.00 | $5,000.00 | $5,110.00 | $1,000.00 |
| 10 | (205.0201) | LS | 1 | $2,500.00 | $12,000 | $45,000 | $27,325 | $25,000 |
| 11 | (205.0601) | CY | 540 | $15.00 | $79.50 | $50.00 | $70.00 | $80.00 |
| 12 | (205.97200011) | LS | 1 | $110,000 | $53,600 | $65,000 | $12,000 | $50,000 |
| 13 | Structure Excavation (206.01) | CY | 13,743 | $85.00 | $40.75 | $85.00 | $121.00 | $100.00 |
| 14 | Trench and Culvert Excavation (206.0201) | CY | 506 | $75.00 | $170.00 | $40.00 | $132.00 | $150.00 |
| 15 | Geotextile Bedding (207.20) | SY | 567 | $15.00 | $6.25 | $15.00 | $8.00 | $5.00 |
| 16 | Prefabricated Composite Structural Drain (207.26) | SY | 65 | $75.00 | $25.00 | $75.00 | $54.00 | $20.00 |
| 17 | Mulch – Temporary (209.100101) | SY | 2,137 | $3.50 | $1.85 | $7.00 | $4.00 | $2.00 |
| 18 | Seed and Mulch – Temporary (209.1003) | SY | 2,137 | $3.50 | $2.75 | $8.00 | $6.00 | $3.00 |
| 19 | Silt Fence - Temporary (209.13) | LF | 1,279 | $5.00 | $9.00 | $15.00 | $14.00 | $8.00 |
| 20 | (209.140201) | EACH | 90 | $40.00 | $80.00 | $200.00 | $377.00 | $300.00 |
| 21 | Pipe Slope Drain, 24" -Temporary (209.160106) | EACH | 1 | $5,500.00 | $7,500.00 | $15,000 | $8,400.00 | $5,000.00 |
| 22 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 444 | $19.00 | $8.50 | $15.00 | $8.50 | $5.00 |
| 23 | Stabilized Construction Access (209.22) | SY | 1,388 | $20.00 | $43.00 | $55.00 | $105.00 | $50.00 |
| 24 | (210.481201) | SF | 5,500 | $75.00 | $66.00 | $13.00 | $30.00 | $40.00 |
| 25 | (304.11000008) | 815 | $65.00 | $150.00 | $150.00 | $130.00 | $100.00 | |
| 26 | (404.0179) | TON | 15 | $115.00 | $225.00 | $400.00 | $366.00 | $400.00 |
| 27 | (404.0189) | TON | 20 | $115.00 | $290.00 | $400.00 | $366.00 | $400.00 |
| 28 | (404.1281) | TON | 603 | $300.00 | $203.00 | $375.00 | $380.00 | $350.00 |
| 29 | (404.1989) | TON | 352 | $155.00 | $198.00 | $300.00 | $280.00 | $300.00 |
| 30 | (404.3789) | TON | 1,070 | $265.00 | $158.75 | $280.00 | $265.00 | $300.00 |
| 31 | Straight Tack Coat (407.0103) | GAL | 307 | $15.00 | $40.00 | $60.00 | $62.00 | $30.00 |
| 32 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 1,872 | $2.50 | $7.00 | $20.00 | $20.00 | $4.00 |
| 33 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 2,217 | $30.00 | $40.25 | $40.00 | $52.00 | $26.00 |
| 34 | Interim Steel Sheeting (552.15) | SF | 2,757 | $55.00 | $58.00 | $70.00 | $84.00 | $15.00 |
| 35 | (553.010004) | EACH | 1 | $160,000 | $5,800.00 | $35,000 | $49,275 | $50,000 |
| 36 | (553.030001) | EACH | 1 | $10,000 | $82,300 | $225,000 | $316,400 | $50,000 |
| 37 | (553.030002) | EACH | 1 | $10,000 | $129,000 | $400,000 | $533,000 | $75,000 |
| 38 | (553.030003) | EACH | 1 | $10,000 | $47,900 | $300,000 | $289,325 | $50,000 |
| 39 | (553.030004) | EACH | 1 | $20,000 | $92,500 | $300,000 | $21,300 | $50,000 |
| 40 | (553.030005) | EACH | 1 | $20,000 | $212,900 | $300,000 | $369,340 | $75,000 |
| 41 | (553.030006) | EACH | 1 | $10,000 | $47,900 | $225,000 | $256,500 | $75,000 |
| 42 | Concrete for Structures, Performance (555.0021) | CY | 29 | $1,250.00 | $2,525.00 | $2,200.00 | $2,345.00 | $2,600.00 |
| 43 | (555.80010001) | 769 | $40.00 | $174.00 | $190.00 | $88.00 | $25.00 | |
| 44 | (555.81980011) | 126 | $60.00 | $283.00 | $100.00 | $120.00 | $35.00 | |
| 45 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $8.35 | $8.35 | $8.35 | $8.35 | $8.35 |
| 46 | Uncoated Steel Fabric Reinforcement for Structures (556.0101) | SY | 6 | $11.50 | $10.00 | $675.00 | $705.00 | $12.00 |
| 47 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 371 | $1.00 | $2.50 | $25.00 | $10.00 | $5.00 |
| 48 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 1,493 | $4.00 | $6.00 | $9.00 | $7.00 | $5.00 |
| 49 | Galvanized Bar Reinforcement for Structures (556.0203) | LB | 242 | $2.00 | $11.60 | $45.00 | $15.00 | $5.00 |
| 50 | Protective Sealing of Existing Structural Concrete and Existing Bridge Decks (559.03) | SF | 2,154 | $7.00 | $7.60 | $30.00 | $7.00 | $10.00 |
| 51 | (560.13030010) | 13 | $220.00 | $385.00 | $450.00 | $70.00 | $250.00 | |
| 52 | (560.13060108) | 32 | $400.00 | $410.00 | $350.00 | $135.00 | $375.00 | |
| 53 | (560.21000011) | 13 | $60.00 | $375.00 | $450.00 | $118.00 | $375.00 | |
| 54 | (560.40000008) | 137 | $90.00 | $224.00 | $150.00 | $93.00 | $375.00 | |
| 55 | (564.0501) | LS | 1 | $6,600.00 | $26,600 | $25,000 | $11,500 | $15,000 |
| 56 | Removal of Structural Concrete (580.01) | CY | 2 | $2,100.00 | $1,200.00 | $1,500.00 | $3,720.00 | $500.00 |
| 57 | Removal and Replacement of Structural Concrete (582.0051) | CY | 4 | $9,500.00 | $23,425 | $2,000.00 | $14,880 | $4,650.00 |
| 58 | Removal of Structural Concrete- Replacement with Vertical and Overhead Patching Material (582.0061) | SF | 2 | $9,500.00 | $3,800.00 | $5,000.00 | $555.00 | $650.00 |
| 59 | Removal of Structural Concrete - Replacement with Shotcrete, No Reinforcement Bar Encasement (583.02) | SF | 547 | $280.00 | $365.00 | $250.00 | $290.00 | $175.00 |
| 60 | (583.04000008) | 3,592 | $42.00 | $83.50 | $200.00 | $38.00 | $60.00 | |
| 61 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 67 | $100.00 | $135.00 | $225.00 | $75.00 | $90.00 |
| 62 | (595.50000018) | 2,452 | $20.00 | $15.00 | $68.00 | $38.00 | $15.00 | |
| 63 | (603.052210) | LF | 5 | $1,150.00 | $2,100.00 | $2,600.00 | $750.00 | $1,800.00 |
| 64 | (603.052410) | LF | 2 | $3,300.00 | $5,375.00 | $6,500.00 | $1,950.00 | $5,000.00 |
| 65 | (603.6001) | LF | 11 | $90.00 | $120.00 | $300.00 | $172.00 | $295.00 |
| 66 | (603.6002) | LF | 31 | $60.00 | $98.00 | $250.00 | $120.00 | $300.00 |
| 67 | (603.63050515) | 24 | $2,600.00 | $2,650.00 | $10,000 | $3,925.00 | $6,000.00 | |
| 68 | (603.63100415) | 10 | $5,000.00 | $5,300.00 | $25,000 | $7,188.00 | $12,500 | |
| 69 | (603.64080515) | 67 | $4,100.00 | $2,290.00 | $6,000.00 | $4,377.00 | $5,500.00 | |
| 70 | (603.64080715) | 85 | $4,500.00 | $3,120.00 | $5,000.00 | $4,675.00 | $6,000.00 | |
| 71 | (603.64101515) | 54 | $8,200.00 | $6,375.00 | $10,500 | $25,690 | $65,000 | |
| 72 | (603.64121015) | 46 | $5,300.00 | $3,525.00 | $9,000.00 | $6,950.00 | $11,000 | |
| 73 | (603.67000001) | 50 | $915.00 | $2,050.00 | $1,950.00 | $2,425.00 | $3,000.00 | |
| 74 | (603.7302) | EACH | 1 | $1,700.00 | $7,100.00 | $4,000.00 | $3,575.00 | $5,000.00 |
| 75 | (604.07610008) | 1 | $2,700.00 | $12,400 | $11,000 | $4,585.00 | $10,000 | |
| 76 | (604.300103) | LF | 6 | $800.00 | $560.00 | $1,400.00 | $825.00 | $2,500.00 |
| 77 | (604.300211) | LF | 4 | $1,000.00 | $975.00 | $1,700.00 | $1,015.00 | $2,500.00 |
| 78 | (604.4048) | LF | 4 | $800.00 | $700.00 | $1,500.00 | $810.00 | $2,000.00 |
| 79 | Box Beam Guide Railing (606.10) | LF | 382 | $95.00 | $95.00 | $110.00 | $106.00 | $100.00 |
| 80 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 514 | $100.00 | $115.00 | $130.00 | $130.00 | $120.00 |
| 81 | Box Beam Guide Railing With Extra Long Posts (606.1001) | LF | 13 | $115.00 | $190.00 | $210.00 | $200.00 | $195.00 |
| 82 | Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered) (606.100102) | LF | 4 | $140.00 | $105.00 | $115.00 | $125.00 | $105.00 |
| 83 | Box Beam Guide Railing with Extra Long Posts (Shop Mitered) (606.100103) | LF | 3 | $150.00 | $440.00 | $500.00 | $475.00 | $450.00 |
| 84 | Box Beam End Piece (606.120101) | EACH | 1 | $1,000.00 | $1,160.00 | $1,500.00 | $1,600.00 | $1,200.00 |
| 85 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 8 | $3,000.00 | $3,900.00 | $4,500.00 | $4,400.00 | $4,000.00 |
| 86 | Resetting Box Beam Guide Railing (606.53) | LF | 295 | $60.00 | $60.00 | $70.00 | $93.00 | $60.00 |
| 87 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 616 | $35.00 | $19.00 | $20.00 | $10.00 | $20.00 |
| 88 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 3 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 |
| 89 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 51 | $325.00 | $415.00 | $425.00 | $435.00 | $450.00 |
| 90 | (609.0401) | LF | 60 | $70.00 | $215.00 | $135.00 | $100.00 | $215.00 |
| 91 | Turf Establishment – Performance (610.1605) | SY | 1,471 | $5.00 | $26.25 | $30.00 | $22.00 | $15.00 |
| 92 | (613.04000001) | 60 | $130.00 | $570.00 | $150.00 | $113.00 | $300.00 | |
| 93 | (613.06000101) | LS | 1 | $45,000 | $45,000 | $45,000 | $45,000 | $45,000 |
| 94 | (613.70000008) | 1,670 | $13.00 | $10.50 | $10.00 | $12.00 | $50.00 | |
| 95 | (615.01010108) | 193 | $260.00 | $218.00 | $250.00 | $311.00 | $240.00 | |
| 96 | (617.11000024) | LS | 1 | $6,000.00 | $3,000.00 | $5,000.00 | $26,650 | $500.00 |
| 97 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $150,000 | $1,585,950 | $433,000 | $795,000 | $1,000,000 |
| 98 | Type III Construction Barricades (619.04) | EACH | 22 | $500.00 | $365.00 | $700.00 | $140.00 | $185.00 |
| 99 | Cover Existing Pavement Marking Stripes (Removable Tape) (619.0803) | LF | 728 | $2.00 | $17.00 | $10.00 | $8.00 | $8.00 |
| 100 | (619.0904) | LF | 1,302 | $2.00 | $5.25 | $7.00 | $7.00 | $5.00 |
| 101 | (619.110513) | EACH | 8 | $4,500.00 | $5,800.00 | $30,000 | $14,880 | $15,000 |
| 102 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 112 | $160.00 | $54.97 | $80.00 | $108.00 | $200.00 |
| 103 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 1,264 | $70.00 | $71.50 | $80.00 | $125.00 | $200.00 |
| 104 | Temporary Impact Attenuator - Redirective (Test Level 3) (619.1803) | EACH | 7 | $8,700.00 | $9,500.00 | $50,000 | $12,400 | $50,000 |
| 105 | (619.99230103) | 8 | $15,500 | $3,700.00 | $10,000 | $1,365.00 | $8,500.00 | |
| 106 | Stone Filling (Light) (620.03) | CY | 12 | $260.00 | $215.00 | $300.00 | $200.00 | $125.00 |
| 107 | Stone Filling (Medium) (620.04) | CY | 203 | $160.00 | $230.00 | $250.00 | $222.00 | $140.00 |
| 108 | Stone Filling (Heavy) (620.05) | CY | 132 | $230.00 | $290.00 | $275.00 | $232.00 | $215.00 |
| 109 | Bedding Material, Type 1 (620.0801) | CY | 110 | $64.00 | $250.00 | $175.00 | $192.00 | $180.00 |
| 110 | (620.29010008) | 42 | $125.00 | $210.00 | $400.00 | $218.00 | $325.00 | |
| 111 | Cleaning Culverts with Span of More Than 50 in. (621.02) | LF | 22 | $135.00 | $210.00 | $135.00 | $744.00 | $265.00 |
| 112 | Cleaning Closed Drainage Systems (621.03) | LF | 58 | $85.00 | $40.00 | $135.00 | $150.00 | $60.00 |
| 113 | Cleaning Drainage Structures (621.04) | EACH | 2 | $1,350.00 | $1,150.00 | $1,000.00 | $6,000.00 | $1,250.00 |
| 114 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 584 | $9.00 | $20.50 | $40.00 | $8.00 | $25.00 |
| 115 | (621.51010010) | 240 | $16.00 | $12.50 | $50.00 | $25.00 | $18.00 | |
| 116 | (623.12000008) | 342 | $50.00 | $243.00 | $175.00 | $127.00 | $135.00 | |
| 117 | Survey Operations (625.01) | LS | 1 | $153,055 | $180,500 | $230,000 | $434,000 | $250,000 |
| 118 | Concrete Right of Way Markers Type L (Low) (625.04) | EACH | 8 | $455.00 | $1,000.00 | $1,500.00 | $620.00 | $300.00 |
| 119 | (627.50140008) | 569 | $6.00 | $10.50 | $20.00 | $13.00 | $6.00 | |
| 120 | Cleaning Existing Pavement and/or Shoulder (633.11) | SY | 1,904 | $1.00 | $4.10 | $13.00 | $2.00 | $4.00 |
| 121 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $6,000.00 | $1,500.00 | $7,500.00 | $2,200.00 | $5,000.00 |
| 122 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 23 | $5,200.00 | $4,500.00 | $2,750.00 | $4,300.00 | $10,000 |
| 123 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 124 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 125 | Type A Sign Posts (645.81) | EACH | 2 | $220.00 | $850.00 | $1,000.00 | $435.00 | $900.00 |
| 126 | Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels (646.22) | EACH | 17 | $55.00 | $55.00 | $75.00 | $70.00 | $55.00 |
| 127 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 1 | $55.00 | $128.00 | $150.00 | $75.00 | $135.00 |
| 128 | Steel Post, 1.1 lb/ft (646.31) | EACH | 17 | $110.00 | $170.00 | $200.00 | $150.00 | $175.00 |
| 129 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 2 | $550.00 | $500.00 | $600.00 | $267.00 | $525.00 |
| 130 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 1 | $2,200.00 | $135.00 | $200.00 | $75.00 | $140.00 |
| 131 | (655.07030010) | 1 | $2,000.00 | $2,000.00 | $5,000.00 | $2,580.00 | $2,000.00 | |
| 132 | Welded Frame & Rectangular Grate 3 (655.1003) | EACH | 1 | $2,300.00 | $2,500.00 | $5,000.00 | $2,210.00 | $1,500.00 |
| 133 | Welded Frame & Rectangular Grate 11 (655.1011) | EACH | 1 | $2,300.00 | $2,500.00 | $3,200.00 | $2,210.00 | $1,900.00 |
| 134 | Manhole Frame & Cover (655.1202) | EACH | 1 | $1,500.00 | $1,900.00 | $2,000.00 | $1,555.00 | $1,400.00 |
| 135 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 2,978 | $2.50 | $2.75 | $3.00 | $5.00 | $3.00 |
| 136 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 5,079 | $2.50 | $2.75 | $3.00 | $5.00 | $3.00 |
| 137 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 8 | $120.00 | $175.00 | $300.00 | $205.00 | $180.00 |
| 138 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 2 | $350.00 | $260.00 | $300.00 | $310.00 | $275.00 |
| 139 | Field Change Payment (FCP) (697.03) | DOL | 343,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 140 | Asphalt Price Adjustment (698.04) | DOL | 2,088 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 141 | Fuel Price Adjustment (698.05) | DOL | 929 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 142 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 143 | (698.93940008) | LS | 1 | $560,000 | $560,000 | $560,000 | $560,000 | $560,000 |
| 144 | Mobilization (699.040001) | LS | 1 | $350,000 | $353,000 | $510,000 | $500,000 | $606,401 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 8, 2026. Compiled by Mirage Metrics.