NYSDOT contract D265717 bid tabulation
RESURFACING: SEGMENTS OF ROUTE 22. Let by New York State DOT on February 26, 2026, Columbia, Region 08. 3 bids received; low bid $4,493,204 by Peckham Road Corp.
- Owner
- New York State DOT
- Letting
- 26 FEB 2026
- Pay items
- 45
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peckham Road Corp | $4,493,204 | Low |
| 2 | Callanan Industries Inc | $5,166,089 | +15% |
| 3 | A Colarusso & Son Inc | $5,549,555 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peckham Road Corp | 2. Callanan Industries Inc | 3. A Colarusso & Son Inc |
|---|---|---|---|---|---|---|
| 1 | (203.24010017) | 650 | $38.15 | $57.00 | $61.00 | |
| 2 | (304.11000008) | 370 | $136.50 | $175.00 | $120.00 | |
| 3 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 2 | $140.00 | $140.00 | $140.00 |
| 4 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 313 | $140.00 | $140.00 | $140.00 |
| 5 | (404.0179) | TON | 3,300 | $116.25 | $107.00 | $108.00 |
| 6 | (404.0982) | TON | 190 | $325.35 | $255.00 | $252.00 |
| 7 | (404.1989) | TON | 2,562 | $91.00 | $110.00 | $120.00 |
| 8 | (406.0962) | TON | 16,200 | $112.10 | $104.00 | $110.00 |
| 9 | Straight Tack Coat (407.0103) | GAL | 9,216 | $2.25 | $7.19 | $8.50 |
| 10 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 126,000 | $0.30 | $0.31 | $0.15 |
| 11 | Production Cold-Mill Surface Planing of Bituminous Concrete (490.15) | SY | 142,500 | $1.00 | $2.52 | $3.50 |
| 12 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 11,382 | $7.80 | $12.36 | $15.00 |
| 13 | (604.070801) | EACH | 10 | $2,000.00 | $1,700.00 | $3,200.00 |
| 14 | (604.070802) | EACH | 10 | $2,000.00 | $1,700.00 | $3,600.00 |
| 15 | (608.01050109) | 1 | $6,250.00 | $7,000.00 | $10,000 | |
| 16 | (608.01050209) | 1 | $6,250.00 | $7,000.00 | $11,001 | |
| 17 | (608.02010015) | 5 | $1,100.00 | $815.00 | $512.00 | |
| 18 | (608.02020015) | 5 | $940.00 | $875.00 | $563.00 | |
| 19 | Turf Establishment - Roadside (610.1601) | SY | 2,500 | $1.86 | $2.00 | $15.00 |
| 20 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $230,000 | $545,000 | $272,000 |
| 21 | (619.110512) | EACH | 4 | $7,200.00 | $4,000.00 | $7,000.00 |
| 22 | Maintain Traffic Signal Equipment (Requirement B) Intersection (619.1612) | MONTH | 3 | $350.00 | $350.00 | $54.00 |
| 23 | Cleaning Culverts with Span of 50 in. or Less (621.01) | LF | 445 | $30.00 | $30.00 | $43.00 |
| 24 | Cleaning Closed Drainage Systems (621.03) | LF | 425 | $16.00 | $16.00 | $28.00 |
| 25 | Cleaning Drainage Structures (621.04) | EACH | 40 | $700.00 | $700.00 | $938.00 |
| 26 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 6,400 | $3.80 | $9.00 | $10.00 |
| 27 | Asphalt Gutter (624.020101) | TON | 500 | $211.00 | $130.70 | $255.00 |
| 28 | Plant Production Quality Adjustment to 624.020101 (624.020110) | QUALITY UNIT | 25 | $110.00 | $110.00 | $110.00 |
| 29 | Survey Operations (625.01) | LS | 1 | $20,500 | $10,000 | $32,000 |
| 30 | (627.50140008) | 6,700 | $1.00 | $2.65 | $3.50 | |
| 31 | (633.05040008) | LS | 1 | $42,750 | $100,000 | $180,000 |
| 32 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 14 | $2,600.00 | $3,500.00 | $5,000.00 |
| 33 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 34 | (649.31000008) | 39,327 | $0.80 | $1.25 | $1.75 | |
| 35 | (680.05010007) | 1 | $27,572 | $27,572 | $36,000 | |
| 36 | (680.05020007) | 2 | $2,410.00 | $2,410.00 | $32,000 | |
| 37 | (685.07200810) | 8 | $50.00 | $50.00 | $55.00 | |
| 38 | (685.16010014) | 106,410 | $1.29 | $1.29 | $1.50 | |
| 39 | (685.17010014) | 107,550 | $1.29 | $1.29 | $1.50 | |
| 40 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 2,400 | $2.99 | $2.99 | $3.25 |
| 41 | Field Change Payment (FCP) (697.03) | DOL | 503,000 | $1.00 | $1.00 | $1.00 |
| 42 | Asphalt Price Adjustment (698.04) | DOL | 11,564 | $1.00 | $1.00 | $1.00 |
| 43 | Fuel Price Adjustment (698.05) | DOL | 3,010 | $1.00 | $1.00 | $1.00 |
| 44 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 45 | Mobilization (699.040001) | LS | 1 | $105,000 | $185,000 | $140,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of February 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.