Asphalt Pavement Resurfacing NY 27. Let by New York State DOT on March 5, 2026, Nassau, Region 10. 3 bids received; low bid $11,875,567 by Posillico Civil Inc.

Owner
New York State DOT
Letting
05 MAR 2026
Pay items
108
Data through
15 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Posillico Civil Inc$11,875,567Low
2Pratt Brothers Inc$13,191,919+11%
3H & L Contracting LLC$13,492,464+14%
NYSDOT contract D265725: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Posillico Civil Inc2. Pratt Brothers Inc3. H & L Contracting LLC
1Unclassified Excavation and Disposal (203.02)CY39$700.00$50.00$35.00
2Test Pit Excavation (206.05)EACH1$5,000.00$725.00$2,126.28
3 (209.11010024)10$400.00$525.00$350.00
4 (304.00010018)2,600$2.00$3.00$1.00
5 (304.10119917)17$140.00$60.00$60.00
6Pavement Density Quality Adjustment to Asphalt Items (404.0002)QUALITY UNIT1,612$130.00$130.00$130.00
7Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003)QUALITY UNIT206$135.00$135.00$135.00
8 (404.0189)TON156$130.00$121.00$125.00
9 (404.0961)TON32,233$138.00$139.00$164.00
10 (404.2589)TON47$500.00$625.00$500.00
11 (404.90710218)34$3,500.00$625.00$1,000.00
12Diluted Tack Coat (407.0102)GAL24,973$0.10$5.00$3.00
13Asphalt Pavement Joint Adhesive (418.7603)LF204,624$0.70$0.60$0.63
14Production Cold Milling of Bituminous Concrete (490.10)SY269,274$4.20$5.25$6.75
15 (490.17011018)1,221$120.00$18.00$24.00
16Miscellaneous Cold Milling of Bituminous Concrete (490.30)SY7,868$6.00$5.00$9.00
17 (502.10010018)LS1$10,000$15,000$2,500.00
18 (510.00290018)16$2,800.00$2,100.00$850.00
19 (510.02210018)55$2,700.00$2,400.00$900.00
20 (510.20000018)314$250.00$65.00$45.00
21 (510.81000018)424$40.00$55.00$40.00
22 (510.91000018)981$1.00$12.00$11.00
23 (510.91100018)500$1.00$12.00$20.00
24 (520.05000010)224$6.50$6.50$16.00
25 (520.09000010)4,470$3.15$3.25$3.15
26Drilling and Grouting Bolts or Reinforcing Bars (586.0201)EACH180$500.00$50.00$65.00
27 (604.07200110)5$1,300.00$1,200.00$2,885.09
28 (604.07210110)11$1,000.00$1,200.00$2,885.09
29 (604.07240110)1$6,000.00$3,600.00$4,849.64
30 (604.07290010)50$200.00$175.00$175.14
31Concrete Sidewalks and Driveways (608.0101)CY99$875.00$1,400.00$1,012.00
32 (608.01030008)505$130.00$222.00$202.40
33 (608.01050109)9$5,350.00$5,100.00$4,958.82
34 (608.01050309)18$5,750.00$9,800.00$8,096.04
35 (608.01050409)3$5,900.00$9,200.00$9,108.04
36 (608.01050709)2$6,775.00$8,600.00$11,132
37 (608.01050809)3$7,250.00$6,800.00$7,084.03
38 (608.01050909)2$5,475.00$7,100.00$6,578.03
39 (608.01051009)1$5,675.00$7,400.00$7,084.03
40 (608.01051109)1$5,175.00$5,500.00$6,072.03
41 (608.01051209)9$17,850$19,000$10,120
42 (608.01051309)2$6,550.00$9,000.00$7,084.03
43 (608.02010015)327$320.00$64.00$5.00
44 (608.02020015)251$25.00$32.00$5.00
45Basic Work Zone Traffic Control (619.01)LS1$250,000$513,746$710,000
46Type III Construction Barricades (619.04)EACH30$100.00$75.00$184.92
47 (619.0901)LF9,731$15.00$0.50$2.00
48 (619.10050020)560$30.00$75.00$8.00
49 (619.110943)EACH1$5,000.00$10,000$50,000
50 (619.111133)EACH4$4,000.00$10,000$50,000
51Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611)MONTH45$500.00$465.00$500.00
52Vehicle Arresting Barrier (619.23)EACH5$100.00$2,000.00$100.00
53Nighttime Operations (Entire Project) (619.24)LS1$250,000$495,000$450,000
54Traffic Control Supervisor (619.25)MONTH9$100.00$1,000.00$100.00
55Pavement Patching (Force Acount) (619.2601)DOL10,000$1.00$1.00$1.00
56Cleaning Closed Drainage Systems (621.03)LF6,774$4.00$4.00$4.00
57Cleaning Drainage Structures (621.04)EACH187$825.00$900.00$900.00
58Clean, Grade and Shape Existing Roadside Section (621.05)LF1,084$30.00$9.00$5.00
59Survey Operations (625.01)LS1$10,000$125,000$20,000
60Cleaning, Sealing and/or Filling Cracks (633.12)LS1$259,000$350,000$100,000
61Cleaning, Sealing and/or Filling Joints (633.13)LF96,246$0.01$4.95$0.65
62Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15)SY70$20.00$545.00$40.00
63Concrete Cylinder Curing Equipment (637.04)EACH1$5,000.00$1,500.00$1,500.00
64Engineer’s Field Office – Type 3 (637.13)MONTH11$10,000$5,000.00$7,500.00
65Office Technology and Supplies (637.34)DOL5,000$1.00$1.00$1.00
66Partnering Workshop (637.35)DOL5,000$1.00$1.00$1.00
67Construction Testing supplies – Consumables (637.36)DOL100$1.00$1.00$1.00
68 (637.41000115)9$250.00$300.00$200.00
69 (637.41000215)9$250.00$300.00$200.00
70 (637.41000315)9$250.00$300.00$200.00
71 (637.41000415)9$250.00$300.00$200.00
72 (637.41000515)9$250.00$300.00$200.00
73 (637.41000615)9$250.00$300.00$200.00
74Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102)SF66$79.00$79.00$79.00
75Type A Sign Posts (645.81)EACH8$457.00$457.00$457.00
76 (645.81090003)18$215.00$215.00$215.00
77Pole-Mounted Sign Support System (Band Mounting) (645.85)EACH18$341.00$341.00$341.00
78Reference Marker Panel (646.21)EACH16$189.00$189.00$189.00
79Steel Post, 1.1 lb/ft (646.31)EACH16$378.00$378.00$378.00
80Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31)EACH4$542.00$542.00$542.00
81Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51)EACH16$37.00$592.00$37.00
82 (647.83001002)16$31.00$496.00$31.00
83 (655.05010010)23$800.00$1,100.00$2,000.00
84 (655.07030010)10$2,275.00$1,400.00$1,200.00
85Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706)EACH10$1,800.00$1,700.00$1,600.00
86Adjust Existing Valve Box Elevation (663.33)EACH36$200.00$60.00$75.00
87 (670.2002)LF105$24.00$24.00$24.00
88 (675.99000023)10,000$1.00$1.00$1.00
89 (680.05010007)21$35,000$36,000$32,000
90 (680.05020007)21$3,700.00$5,000.00$3,700.00
91 (680.51111010)10$2,500.00$1,000.00$3,200.00
92 (680.80320014)15$3,200.00$4,500.00$1,200.00
93 (680.83200010)LS1$5,000.00$25,000$5,000.00
94 (685.02000010)52$90.00$10.00$75.00
95 (685.03100018)74$150.00$150.00$150.00
96 (685.03130018)52$150.00$150.00$150.00
97 (685.07200110)97,308$1.00$0.75$0.72
98 (685.07200310)177$175.00$175.00$175.00
99 (685.07200410)10,638$2.00$2.00$1.95
100 (685.07200510)167,522$2.50$2.50$2.40
101 (685.07200610)54,864$1.00$0.75$0.72
102 (685.07200710)2,268$2.00$2.00$1.95
103 (691.04000020)63,000$1.00$1.00$1.00
104Field Change Payment (FCP) (697.03)DOL883,000$1.00$1.00$1.00
105Asphalt Price Adjustment (698.04)DOL10,399.29$1.00$1.00$1.00
106Fuel Price Adjustment (698.05)DOL412$1.00$1.00$1.00
107Steel/Iron Price Adjustment (698.06)DOL100$1.00$1.00$1.00
108Mobilization (699.040001)LS1$456,753$500,000$517,999
NYSDOT contract D265725: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.

Every contract let that day: NYSDOT letting of March 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy