NYSDOT contract D265734 bid tabulation
Asphalt Pavement Resurfacing NY110 from NY27 to Baylis Road. Let by New York State DOT on March 12, 2026, Suffolk, Region 10. 2 bids received; low bid $17,647,436 by Posillico/H&L JV.
- Owner
- New York State DOT
- Letting
- 12 MAR 2026
- Pay items
- 114
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Posillico/H&L JV | $17,647,436 | Low |
| 2 | Suffolk Paving Corp | $17,713,249 | 0.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Posillico/H&L JV | 2. Suffolk Paving Corp |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $50,000 | $30,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 115 | $500.00 | $75.00 |
| 3 | (304.00010018) | 2,200 | $20.00 | $5.00 | |
| 4 | (304.10119917) | 20 | $60.00 | $75.00 | |
| 5 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 2,246 | $125.00 | $125.00 |
| 6 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 2,246 | $125.00 | $125.00 |
| 7 | (404.0189) | TON | 2,234 | $132.00 | $150.00 |
| 8 | (404.0961) | TON | 44,680 | $132.00 | $136.00 |
| 9 | (404.1989) | TON | 210 | $400.00 | $200.00 |
| 10 | (404.2589) | TON | 40 | $800.00 | $250.00 |
| 11 | (404.90710218) | 365 | $700.00 | $600.00 | |
| 12 | Diluted Tack Coat (407.0102) | GAL | 39,000 | $0.10 | $5.50 |
| 13 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 330,230 | $0.60 | $0.40 |
| 14 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 384,800 | $5.00 | $4.00 |
| 15 | (490.17011018) | 3,200 | $23.00 | $7.00 | |
| 16 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 770 | $110.00 | $10.00 |
| 17 | (502.10010018) | LS | 1 | $20,000 | $5,000.00 |
| 18 | (510.00210018) | 66 | $1,500.00 | $3,000.00 | |
| 19 | (510.02210018) | 9 | $5,000.00 | $4,600.00 | |
| 20 | (510.20000018) | 295 | $700.00 | $100.00 | |
| 21 | (510.81000018) | 265 | $70.00 | $55.00 | |
| 22 | (510.91000018) | 90 | $20.00 | $30.00 | |
| 23 | (520.05000010) | 50 | $5.25 | $7.00 | |
| 24 | (520.09000010) | 7,710 | $3.15 | $4.00 | |
| 25 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 24 | $500.00 | $55.00 |
| 26 | (604.07200110) | 220 | $2,000.00 | $2,600.00 | |
| 27 | (604.07210110) | 5 | $3,000.00 | $2,000.00 | |
| 28 | (604.07240110) | 3 | $4,000.00 | $3,000.00 | |
| 29 | (604.07290010) | 184 | $150.00 | $30.00 | |
| 30 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 2 | $125.00 | $125.00 |
| 31 | (608.01050010) | 130 | $1,500.00 | $950.00 | |
| 32 | (608.01050109) | 52 | $4,950.00 | $5,050.00 | |
| 33 | (608.01050209) | 17 | $5,250.00 | $5,350.00 | |
| 34 | (608.01050309) | 13 | $5,375.00 | $5,500.00 | |
| 35 | (608.01050409) | 5 | $5,500.00 | $5,750.00 | |
| 36 | (608.01050509) | 4 | $6,475.00 | $6,650.00 | |
| 37 | (608.01050709) | 5 | $6,550.00 | $6,800.00 | |
| 38 | (608.01050809) | 4 | $6,900.00 | $7,000.00 | |
| 39 | (608.01050909) | 4 | $5,150.00 | $5,475.00 | |
| 40 | (608.01051009) | 5 | $5,275.00 | $5,475.00 | |
| 41 | (608.01051109) | 10 | $4,875.00 | $5,000.00 | |
| 42 | (608.01051309) | 3 | $6,125.00 | $6,500.00 | |
| 43 | (608.01051409) | 1 | $5,100.00 | $5,500.00 | |
| 44 | (608.02010015) | 1,560 | $180.00 | $65.00 | |
| 45 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 15 | $800.00 | $300.00 |
| 46 | (608.02020015) | 780 | $20.00 | $80.00 | |
| 47 | Surface-Applied Detectable Warning Units (608.20) | SY | 1 | $1,000.00 | $75.00 |
| 48 | (609.04010510) | 50 | $108.63 | $85.00 | |
| 49 | (609.04030510) | 5 | $204.54 | $85.00 | |
| 50 | Topsoil - Roadside (610.1402) | CY | 5 | $300.00 | $200.00 |
| 51 | Turf Establishment - Roadside (610.1601) | SY | 40 | $40.00 | $150.00 |
| 52 | Watering Vegetation (610.19) | 1,000 GALLONS | 3 | $150.00 | $1,800.00 |
| 53 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $680,000 | $630,000 |
| 54 | Type III Construction Barricades (619.04) | EACH | 27 | $90.00 | $100.00 |
| 55 | (619.0901) | LF | 390,000 | $0.48 | $0.53 |
| 56 | (619.10050020) | 600 | $6.36 | $45.00 | |
| 57 | (619.110943) | EACH | 3 | $4,000.00 | $12,000 |
| 58 | (619.111133) | EACH | 2 | $5,000.00 | $12,000 |
| 59 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $540,000 | $900,000 |
| 60 | Traffic Control Supervisor (619.25) | MONTH | 8 | $100.00 | $20,000 |
| 61 | Pavement Patching (Force Acount) (619.2601) | DOL | 30,000 | $1.00 | $1.00 |
| 62 | Cleaning Closed Drainage Systems (621.03) | LF | 1,472 | $3.00 | $8.00 |
| 63 | Cleaning Drainage Structures (621.04) | EACH | 368 | $822.89 | $550.00 |
| 64 | Survey Operations (625.01) | LS | 1 | $25,000 | $35,000 |
| 65 | Cleaning, Sealing and/or Filling Cracks (633.12) | LS | 1 | $250,000 | $200,000 |
| 66 | Cleaning, Sealing and/or Filling Joints (633.13) | LF | 1,220 | $22.30 | $1.00 |
| 67 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 10 | $10,000 | $5,000.00 |
| 68 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 |
| 69 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 |
| 70 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 71 | (637.41000115) | 1 | $300.00 | $100.00 | |
| 72 | (637.41000215) | 1 | $300.00 | $100.00 | |
| 73 | (637.41000315) | 1 | $300.00 | $100.00 | |
| 74 | (637.41000415) | 1 | $300.00 | $100.00 | |
| 75 | (637.41000515) | 1 | $300.00 | $100.00 | |
| 76 | (645.03030015) | 2 | $2,505.00 | $11,025 | |
| 77 | (645.52010110) | 15 | $226.00 | $89.25 | |
| 78 | (645.52020110) | 120 | $67.00 | $126.00 | |
| 79 | Type A Sign Posts (645.81) | EACH | 30 | $269.00 | $341.25 |
| 80 | Reference Marker Panel (646.21) | EACH | 36 | $183.00 | $210.00 |
| 81 | Steel Post, 1.1 lb/ft (646.31) | EACH | 22 | $281.00 | $157.50 |
| 82 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 1 | $34.00 | $420.00 |
| 83 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 30 | $36.00 | $367.50 |
| 84 | (647.83001002) | 36 | $31.00 | $315.00 | |
| 85 | (655.05010010) | 7 | $1,685.00 | $3,500.00 | |
| 86 | Cast Frame F3, Mountable Curb Box CM3 & Reticuline Grate G3 (655.0703) | EACH | 12 | $2,050.00 | $3,500.00 |
| 87 | (655.07030010) | 32 | $1,600.00 | $3,500.00 | |
| 88 | Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706) | EACH | 194 | $2,050.00 | $2,200.00 |
| 89 | Adjust Existing Valve Box Elevation (663.33) | EACH | 49 | $163.74 | $200.00 |
| 90 | (675.99000023) | 10,000 | $1.00 | $1.00 | |
| 91 | (680.05010007) | 22 | $31,297 | $33,500 | |
| 92 | (680.05020007) | 12 | $4,750.00 | $4,000.00 | |
| 93 | (680.51000010) | 6 | $920.00 | $850.00 | |
| 94 | (680.51111010) | 1 | $2,200.00 | $1,300.00 | |
| 95 | (680.520205) | LF | 115 | $40.00 | $25.00 |
| 96 | (680.80320014) | 12 | $3,760.00 | $3,600.00 | |
| 97 | (680.83200010) | LS | 1 | $10,000 | $5,000.00 |
| 98 | (685.02000010) | 400 | $85.08 | $20.00 | |
| 99 | (685.03100018) | 25 | $125.00 | $150.00 | |
| 100 | (685.03110018) | 310 | $125.00 | $150.00 | |
| 101 | (685.03130018) | 65 | $125.00 | $150.00 | |
| 102 | (685.07200110) | 135,000 | $0.72 | $0.90 | |
| 103 | (685.07200210) | 53 | $150.00 | $175.00 | |
| 104 | (685.07200310) | 310 | $175.00 | $190.00 | |
| 105 | (685.07200410) | 29,500 | $1.95 | $2.00 | |
| 106 | (685.07200510) | 49,000 | $2.40 | $2.75 | |
| 107 | (685.07200610) | 100,000 | $0.72 | $0.90 | |
| 108 | (685.07200710) | 5,800 | $1.95 | $2.10 | |
| 109 | (691.04000020) | 37,800 | $1.00 | $1.00 | |
| 110 | Field Change Payment (FCP) (697.03) | DOL | 1,220,000 | $1.00 | $1.00 |
| 111 | Asphalt Price Adjustment (698.04) | DOL | 28,711.13 | $1.00 | $1.00 |
| 112 | Fuel Price Adjustment (698.05) | DOL | 7,050 | $1.00 | $1.00 |
| 113 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 114 | Mobilization (699.040001) | LS | 1 | $660,000 | $681,279 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 12, 2026. Compiled by Mirage Metrics.