NYSDOT contract D265740 bid tabulation
Asphalt Pavement Resurfacing NY 27 Nassau/Suffolk Line. Let by New York State DOT on March 26, 2026, Suffolk, Region 10. 4 bids received; low bid $16,578,000 by H & L Contracting LLC.
- Owner
- New York State DOT
- Letting
- 26 MAR 2026
- Pay items
- 110
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | H & L Contracting LLC | $16,578,000 | Low |
| 2 | Rosemar Contracting Inc | $17,417,940 | +5.0% |
| 3 | Suffolk Paving Corp | $17,699,601 | +7.0% |
| 4 | Posillico Civil Inc | $18,381,778 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. H & L Contracting LLC | 2. Rosemar Contracting Inc | 3. Suffolk Paving Corp | 4. Posillico Civil Inc |
|---|---|---|---|---|---|---|---|
| 1 | Unclassified Excavation and Disposal (203.02) | CY | 30 | $30.00 | $450.00 | $75.00 | $400.00 |
| 2 | Test Pit Excavation (206.05) | EACH | 1 | $1,525.00 | $1,200.00 | $100.00 | $2,000.00 |
| 3 | (209.11010024) | 22 | $350.00 | $325.00 | $100.00 | $500.00 | |
| 4 | (304.00010018) | 6,248 | $1.00 | $5.00 | $3.00 | $4.00 | |
| 5 | (304.10119917) | 34 | $100.00 | $180.00 | $75.00 | $90.00 | |
| 6 | Pavement Density Quality Adjustment to Asphalt Items (404.0002) | QUALITY UNIT | 1,988 | $125.00 | $125.00 | $125.00 | $125.00 |
| 7 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 254 | $125.00 | $125.00 | $125.00 | $125.00 |
| 8 | (404.0189) | TON | 200 | $155.00 | $135.00 | $175.00 | $160.00 |
| 9 | (404.0961) | TON | 39,738 | $160.00 | $135.00 | $145.00 | $160.00 |
| 10 | (404.90710218) | 24 | $1,500.00 | $850.00 | $600.00 | $3,000.00 | |
| 11 | Diluted Tack Coat (407.0102) | GAL | 31,708 | $0.10 | $2.50 | $5.50 | $0.10 |
| 12 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 185,586 | $0.68 | $0.65 | $0.40 | $0.72 |
| 13 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 352,294 | $4.00 | $4.00 | $4.00 | $2.00 |
| 14 | (490.17011018) | 859 | $45.00 | $25.00 | $15.00 | $80.00 | |
| 15 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 8,809 | $4.00 | $4.00 | $8.00 | $2.00 |
| 16 | (502.10010018) | LS | 1 | $3,500.00 | $5,000.00 | $5,000.00 | $15,000 |
| 17 | (510.00290018) | 40 | $1,200.00 | $2,800.00 | $3,800.00 | $1,800.00 | |
| 18 | (510.02210018) | 128 | $1,100.00 | $2,950.00 | $3,800.00 | $2,700.00 | |
| 19 | (510.20000018) | 753 | $100.00 | $195.00 | $100.00 | $210.00 | |
| 20 | (510.81000018) | 1,001 | $40.00 | $120.00 | $65.00 | $1.00 | |
| 21 | (510.91000018) | 3,401 | $5.00 | $80.00 | $30.00 | $0.50 | |
| 22 | (510.91100018) | 900 | $5.00 | $80.00 | $40.00 | $0.50 | |
| 23 | (520.05000010) | 611 | $10.80 | $5.00 | $7.00 | $5.50 | |
| 24 | (520.09000010) | 12,198 | $3.75 | $4.00 | $4.00 | $3.00 | |
| 25 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 480 | $70.00 | $125.00 | $65.00 | $150.00 |
| 26 | (604.07200110) | 9 | $1,500.00 | $2,500.00 | $3,400.00 | $2,700.00 | |
| 27 | (604.07210110) | 30 | $1,500.00 | $2,350.00 | $2,000.00 | $2,700.00 | |
| 28 | (604.07240110) | 1 | $4,000.00 | $4,000.00 | $5,000.00 | $4,000.00 | |
| 29 | (604.07290010) | 50 | $125.00 | $110.00 | $50.00 | $190.00 | |
| 30 | Concrete Sidewalks and Driveways (608.0101) | CY | 95 | $850.00 | $850.00 | $950.00 | $850.00 |
| 31 | (608.01030008) | 484 | $195.73 | $200.00 | $325.00 | $145.19 | |
| 32 | (608.01050109) | 54 | $4,950.00 | $5,800.00 | $5,346.00 | $6,350.00 | |
| 33 | (608.01050209) | 11 | $5,375.00 | $6,000.00 | $5,805.00 | $6,675.00 | |
| 34 | (608.01050309) | 11 | $5,450.00 | $6,000.00 | $5,886.00 | $6,750.00 | |
| 35 | (608.01050409) | 7 | $5,500.00 | $6,200.00 | $5,940.00 | $6,900.00 | |
| 36 | (608.01050509) | 2 | $6,775.00 | $7,200.00 | $7,317.00 | $7,650.00 | |
| 37 | (608.01050609) | 2 | $6,950.00 | $7,200.00 | $7,506.00 | $6,000.00 | |
| 38 | (608.01050709) | 7 | $6,625.00 | $7,300.00 | $7,155.00 | $7,775.00 | |
| 39 | (608.01050809) | 19 | $6,475.00 | $7,200.00 | $6,993.00 | $8,250.00 | |
| 40 | (608.01050909) | 42 | $4,950.00 | $5,800.00 | $5,346.00 | $6,775.00 | |
| 41 | (608.01051009) | 19 | $5,425.00 | $6,100.00 | $5,859.00 | $6,675.00 | |
| 42 | (608.01051109) | 2 | $4,700.00 | $5,800.00 | $5,076.00 | $6,175.00 | |
| 43 | (608.01051209) | 33 | $9,670.00 | $10,200 | $10,443 | $17,950 | |
| 44 | (608.02010015) | 931 | $380.00 | $200.00 | $75.00 | $460.00 | |
| 45 | (608.02020015) | 653 | $5.00 | $50.00 | $75.00 | $55.00 | |
| 46 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $999,204 | $1,000,000 | $670,000 | $1,200,000 |
| 47 | Type III Construction Barricades (619.04) | EACH | 50 | $130.00 | $100.00 | $100.00 | $90.00 |
| 48 | (619.0901) | LF | 30,000 | $1.00 | $0.48 | $0.65 | $7.00 |
| 49 | (619.10050020) | 800 | $11.26 | $44.00 | $40.00 | $30.00 | |
| 50 | (619.110943) | EACH | 3 | $3,500.00 | $7,000.00 | $13,500 | $5,000.00 |
| 51 | (619.111133) | EACH | 10 | $3,500.00 | $9,500.00 | $13,000 | $5,000.00 |
| 52 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 39 | $224.00 | $230.00 | $550.00 | $224.00 |
| 53 | Vehicle Arresting Barrier (619.23) | EACH | 10 | $100.00 | $5,000.00 | $3,000.00 | $0.10 |
| 54 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $750,000 | $700,000 | $1,225,000 | $1,200,000 |
| 55 | Traffic Control Supervisor (619.25) | MONTH | 10 | $100.00 | $1,000.00 | $25,000 | $100.00 |
| 56 | Pavement Patching (Force Acount) (619.2601) | DOL | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 57 | Cleaning Closed Drainage Systems (621.03) | LF | 8,317 | $3.00 | $7.20 | $8.00 | $5.00 |
| 58 | Cleaning Drainage Structures (621.04) | EACH | 517 | $775.00 | $750.00 | $550.00 | $950.00 |
| 59 | Clean, Grade and Shape Existing Roadside Section (621.05) | LF | 1,416 | $7.00 | $5.00 | $7.00 | $40.00 |
| 60 | Survey Operations (625.01) | LS | 1 | $20,000 | $100,000 | $38,000 | $150,000 |
| 61 | Cleaning, Sealing and/or Filling Cracks (633.12) | LS | 1 | $150,000 | $105,000 | $250,000 | $229,000 |
| 62 | Cleaning, Sealing and/or Filling Joints (633.13) | LF | 148,415 | $0.01 | $5.50 | $1.00 | $0.20 |
| 63 | Removal and Repair of Loose, Broken, or Spalled PCC Pavement (633.15) | SY | 178 | $20.00 | $50.00 | $50.00 | $60.00 |
| 64 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $3,500.00 | $2,500.00 | $500.00 | $5,000.00 |
| 65 | Engineer’s Field Office – Type 3 (637.13) | MONTH | 10 | $8,500.00 | $5,000.00 | $5,000.00 | $10,000 |
| 66 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 67 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 68 | Construction Testing supplies – Consumables (637.36) | DOL | 300 | $1.00 | $1.00 | $1.00 | $1.00 |
| 69 | (637.41000115) | 10 | $250.00 | $200.00 | $100.00 | $250.00 | |
| 70 | (637.41000215) | 10 | $250.00 | $200.00 | $100.00 | $250.00 | |
| 71 | (637.41000315) | 10 | $250.00 | $200.00 | $100.00 | $250.00 | |
| 72 | (637.41000415) | 10 | $250.00 | $200.00 | $100.00 | $250.00 | |
| 73 | (637.41000515) | 10 | $250.00 | $200.00 | $100.00 | $250.00 | |
| 74 | (637.41000615) | 10 | $250.00 | $200.00 | $100.00 | $250.00 | |
| 75 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 175 | $250.00 | $90.00 | $102.00 | $88.00 |
| 76 | Type A Sign Posts (645.81) | EACH | 65 | $250.00 | $285.00 | $297.00 | $282.00 |
| 77 | (645.81090003) | 175 | $110.00 | $110.00 | $162.00 | $110.00 | |
| 78 | Pole-Mounted Sign Support System (Band Mounting) (645.85) | EACH | 47 | $236.00 | $240.00 | $324.00 | $236.00 |
| 79 | Reference Marker Panel (646.21) | EACH | 2 | $201.00 | $250.00 | $378.00 | $201.00 |
| 80 | Steel Post, 1.1 lb/ft (646.31) | EACH | 2 | $198.00 | $250.00 | $378.00 | $198.00 |
| 81 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 52 | $282.00 | $285.00 | $486.00 | $282.00 |
| 82 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 47 | $31.00 | $35.00 | $351.00 | $31.00 |
| 83 | (647.83001002) | 2 | $30.00 | $35.00 | $216.00 | $30.00 | |
| 84 | (655.05010010) | 46 | $2,000.00 | $1,200.00 | $3,700.00 | $800.00 | |
| 85 | (655.07030010) | 4 | $1,250.00 | $1,400.00 | $5,000.00 | $2,300.00 | |
| 86 | Cast Frame F3, UnMountable Curb Box CU3 & Reticuline Grate G3 (655.0706) | EACH | 4 | $1,600.00 | $1,700.00 | $5,000.00 | $1,900.00 |
| 87 | Adjust Existing Valve Box Elevation (663.33) | EACH | 10 | $95.00 | $200.00 | $200.00 | $200.00 |
| 88 | (670.2002) | LF | 75 | $25.00 | $25.00 | $85.00 | $25.00 |
| 89 | (675.99000023) | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 90 | (680.05010007) | 15 | $31,236 | $31,300 | $36,180 | $40,000 | |
| 91 | (680.05020007) | 15 | $4,770.00 | $4,800.00 | $4,536.00 | $4,770.00 | |
| 92 | (680.51111010) | 16 | $828.00 | $900.00 | $1,296.00 | $3,000.00 | |
| 93 | (680.80320014) | 13 | $3,804.00 | $3,850.00 | $5,184.00 | $3,804.00 | |
| 94 | (680.83200010) | LS | 1 | $5,800.00 | $10,000 | $5,000.00 | $5,000.00 |
| 95 | (685.02000010) | 52 | $166.44 | $25.00 | $40.00 | $350.00 | |
| 96 | (685.03100018) | 53 | $175.00 | $180.00 | $189.00 | $175.00 | |
| 97 | (685.03130018) | 52 | $175.00 | $180.00 | $189.00 | $175.00 | |
| 98 | (685.07200110) | 145,358 | $0.72 | $0.72 | $0.78 | $0.72 | |
| 99 | (685.07200310) | 107 | $175.00 | $175.00 | $189.00 | $175.00 | |
| 100 | (685.07200410) | 30,492 | $1.95 | $1.95 | $2.11 | $1.95 | |
| 101 | (685.07200510) | 85,786 | $2.40 | $2.40 | $2.60 | $2.40 | |
| 102 | (685.07200610) | 92,849 | $0.72 | $0.72 | $0.78 | $0.72 | |
| 103 | (685.07200710) | 46,410 | $1.95 | $1.95 | $2.11 | $1.95 | |
| 104 | (685.07200910) | 15 | $85.00 | $85.00 | $91.80 | $85.00 | |
| 105 | (691.04000020) | 63,000 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 106 | Field Change Payment (FCP) (697.03) | DOL | 1,274,844.15 | $1.00 | $1.00 | $1.00 | $1.00 |
| 107 | Asphalt Price Adjustment (698.04) | DOL | 10,885.22 | $1.00 | $1.00 | $1.00 | $1.00 |
| 108 | Fuel Price Adjustment (698.05) | DOL | 866 | $1.00 | $1.00 | $1.00 | $1.00 |
| 109 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 110 | Mobilization (699.040001) | LS | 1 | $621,341 | $665,000 | $680,754 | $706,991 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 26, 2026. Compiled by Mirage Metrics.