6" shallow pipe underdrains with geotextile fabric unit price, Ohio

Low bidders on ODOT contracts carried a median of $16.00 per FT for item 605E11110, 6" shallow pipe underdrains with geotextile fabric, over the 24 months to 12 NOV 2026, across 25 low bids. Half of all 102 bids fell between $15.00 and $21.88.

Owner
Ohio DOT
Item
605E11110
Unit
FT
Latest letting
12 NOV 2026
$16.00Low bidder's median, per FT
$18.00Median of all bids, per FT
25Contracts in the window

By year of letting

6" shallow pipe underdrains with geotextile fabric, ODOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20201313$12.0066$12.00
20211617$13.0097$13.00
20221315$15.0058$15.54
20231312$13.5032$17.00
20241111$20.0040$20.00
202599$18.0034$18.00
20261515$16.0065$18.00
6" shallow pipe underdrains with geotextile fabric, ODOT: unit prices by year

Bid prices as published, not adjusted for inflation.

By quantity

6" shallow pipe underdrains with geotextile fabric, ODOT: low bidder's median by quantity band
Quantity (FT)Low bidsLow-bid median
62 to 6576$28.02
971 to 2,8016$17.50
2,977 to 10,8756$15.03
22,372 to 125,2667$14.00
6" shallow pipe underdrains with geotextile fabric, ODOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Latest contracts with this item

Latest ODOT contracts carrying 6" shallow pipe underdrains with geotextile fabric
LetContractCountyQuantityLow bidder's priceMedianBidsLow bidderSource
12 NOV 2026260459FUL414$29.00$20.005TOLEDO CAISSON CORPORATIONODOT
01 OCT 2026260430MOT3,418$13.74$14.458R B JERGENS CONTRACTORS INCODOT
13 AUG 2026260345CUY657$28.00$29.004GREAT LAKES CONSTRUCTION COODOT
13 AUG 2026260368PIK8,369$14.00$16.509ALLARD EXCAVATION LLCODOT
07 MAY 2026260237FRA22,372$16.00$17.252SHELLY & SANDS INCODOT
07 MAY 2026260248SAN10,875$15.00$21.003GREAT LAKES DEMOLITION COMPANYODOT
23 APR 2026260216VAN3,884$20.00$18.382VERNON NAGEL INCODOT
23 APR 2026260217CUY325$28.05$29.084ECLIPSE CO LLCODOT
09 APR 2026260171COL38,641$16.00$15.002SHELLY & SANDS INCODOT
26 MAR 2026260149HAM642$24.67$35.094SUNESIS CONSTRUCTION COODOT
26 MAR 2026260152HAS36,992$15.00$16.882SHELLY & SANDS INCODOT
19 FEB 2026260096SUM388$50.00$25.504KENMORE CONSTRUCTION CO INCODOT
05 FEB 2026260003MAH80,824$13.00$14.004SHELLY & SANDS INCODOT
29 JAN 2026260002HEN99,647$10.80$14.503E S WAGNER - VERNON NAGEL JOINT VENTUREODOT
15 JAN 2026260010CUY2,437$15.00$18.459TRI-MOR CORPODOT
Latest ODOT contracts carrying 6" shallow pipe underdrains with geotextile fabric

Filter this item by your own quantity, county and period, or check your price against it, in the ODOT explorer.

How these prices were read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are ODOT's own: this item is compared with ODOT contracts only.
  • Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy