ODOT contract 15576 bid tabulation

Or99: transit signal upgrades. Let by Oregon DOT on January 23, 2025, Region 3. 4 bids received.

Owner
Oregon DOT
Letting
23 JAN 2025
Pay items
33
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
ODOT contract 15576: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4
1Traffic signal modification, S. pacific hwy. at bear creek corp. (0990-0102000A)EACH1$7,500.00$4,500.00$5,300.00$9,220.00
2Traffic signal modification, E. main ST. at lithia way (0990-0102000A)EACH1$3,000.00$2,750.00$3,000.00$1,540.00
3Traffic signal modification, siskiyou BLVD. at mountain ave. (0990-0102000A)EACH1$13,350$18,500$19,000$17,100
4Traffic signal modification, front ST. at pine ST. (0990-0102000A)EACH1$6,000.00$3,000.00$3,500.00$1,450.00
5Traffic signal modification, lithia way at pioneer ST. (0990-0102000A)EACH1$13,350$16,000$18,000$17,100
6Traffic signal modification, siskiyou BLVD. at ashland ST. (0990-0102000A)EACH1$6,000.00$3,750.00$5,000.00$5,550.00
7Traffic signal modification, N. pacific hwy. at sage RD. (0990-0102000A)EACH1$6,000.00$4,000.00$4,500.00$3,050.00
8Sequential arrow signs (0222-0162000E)EACH1$1,200.00$1,500.00$1,111.00$4,500.00
9Traffic signal modification, lithia way at 2ND ST./"C" ST. (0990-0102000A)EACH1$13,350$16,000$18,000$17,100
10Traffic signal modification, siskiyou BLVD. at beach ST./morse ave. (0990-0102000A)EACH1$3,000.00$2,500.00$3,000.00$1,540.00
11Traffic signal modification, S. pacific hwy. at garfield ST. (0990-0102000A)EACH1$4,100.00$3,000.00$3,500.00$4,670.00
12Traffic signal modification, front ST. at twin creeks crossing (0990-0102000A)EACH1$6,000.00$4,000.00$4,800.00$6,050.00
13Traffic signal modification, N. main ST. at laurel ST. (0990-0102000A)EACH1$18,000$20,000$20,000$21,520
14Temporary signs (0222-0102000J)SF320$14.00$22.50$18.00$72.00
15Traffic signal modification, N. main ST. at helman ST. (0990-0102000A)EACH1$6,000.00$4,000.00$4,500.00$6,050.00
16Traffic signal modification, highway 99 N at S. valley view RD./jackson RD. (0990-0102000A)EACH1$1,600.00$2,000.00$2,800.00$1,180.00
17Temporary barricades, type III (0224-0105000E)EACH1$200.00$200.00$140.00$1,500.00
18Traffic signal modification, N. pacific hwy. at scenic ave. (0990-0102000A)EACH1$4,100.00$3,000.00$3,200.00$4,670.00
19Flaggers (0223-0168000T)HR160$90.00$88.00$97.00$78.00
20Traffic signal modification, front ST. at freeman RD./10TH ST. (0990-0102000A)EACH1$4,000.00$4,000.00$4,800.00$4,920.00
21Traffic signal modification, siskiyou BLVD. at sherman ST. (0990-0102000A)EACH1$3,000.00$2,150.00$3,000.00$1,540.00
22Traffic signal modification, E. main ST. at 2ND ST. (0990-0102000A)EACH1$13,350$15,000$18,000$17,100
23Traffic signal modification, S. pacific hwy. at lowry LN. (0990-0102000A)EACH1$7,500.00$5,000.00$5,800.00$9,220.00
24Pollution control plan (0290-0100000A)LS1$1,200.00$100.00$800.00$1,500.00
25Traffic signal modification, E. main ST. at gresham ST./3RD ST. (0990-0102000A)EACH1$3,000.00$3,500.00$4,000.00$1,540.00
26Temporary plastic drums (0224-0145000E)EACH13$60.00$75.00$122.00$65.00
27Traffic signal modification, N. main ST. at maple ST. (0990-0102000A)EACH1$1,600.00$2,750.00$3,300.00$1,180.00
28Traffic signal modification, S. pacific hwy. at S. stage RD. (0990-0102000A)EACH1$6,000.00$4,700.00$4,900.00$6,040.00
29Traffic signal modification, siskiyou BLVD at walker ave. (0990-0102000A)EACH1$1,600.00$2,600.00$3,000.00$1,180.00
30Traffic signal modification, N. pacific hwy. at beall LN. (0990-0102000A)EACH1$6,000.00$4,250.00$4,800.00$6,050.00
31Flagger station lighting (0223-0168100E)EACH4$1,200.00$950.00$980.00$2,500.00
32Traffic signal modification, E. main ST. at pioneer ST. (0990-0102000A)EACH1$13,350$16,500$17,000$17,100
33Traffic signal modification, siskiyou BLVD. at wightman ST./indiana ST. (0990-0102000A)EACH1$6,000.00$3,600.00$4,800.00$5,550.00
ODOT contract 15576: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of January 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy