ODOT contract 15577 bid tabulation
I-5: southern oregon wrong way driver mitigation. Let by Oregon DOT on January 23, 2025, Region 3. 5 bids received.
- Owner
- Oregon DOT
- Letting
- 23 JAN 2025
- Pay items
- 36
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 |
|---|---|---|---|---|---|---|---|---|
| 1 | Legend removal (0225-0155100J) | SF | 11,410 | $3.95 | $3.60 | $4.20 | $5.00 | $3.50 |
| 2 | Delineators, type 4 alternate 2 BI-directional, yellow/red (0840-0104200E) | EACH | 400 | $50.00 | $38.00 | $63.00 | $85.00 | $50.00 |
| 3 | BI-directional yellow/red type iar markers, recessed (0855-0107100E) | EACH | 1,940 | $22.50 | $16.00 | $18.60 | $55.00 | $15.50 |
| 4 | Remove existing signs (0905-0100000A) | LS | 1 | $50,000 | $40,000 | $110,000 | $60,005 | $35,000 |
| 5 | Thermoplastic, sprayed, surface, non-profiled (0865-0119600F) | LF | 12,290 | $2.90 | $2.60 | $3.10 | $6.00 | $2.55 |
| 6 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 6 | $47.65 | $50.00 | $16.80 | $41.00 | $200.00 |
| 7 | Flaggers (0223-0168000T) | HR | 500 | $50.00 | $80.00 | $98.50 | $105.00 | $70.00 |
| 8 | Stripe removal (0225-0154000F) | LF | 6,706 | $1.50 | $1.36 | $1.65 | $3.00 | $1.35 |
| 9 | Triangular base breakaway sign supports (0930-0112000A) | LB | 2,132.10 | $12.31 | $16.42 | $16.88 | $18.76 | $15.24 |
| 10 | Temporary barricades, type III (0224-0105000E) | EACH | 14 | $200.00 | $150.00 | $102.00 | $150.00 | $250.00 |
| 11 | Bar removal (0225-0156000J) | SF | 24 | $22.50 | $20.50 | $24.00 | $350.00 | $20.00 |
| 12 | BI-directional white/red type iar markers, recessed (0855-0107100E) | EACH | 1,990 | $22.50 | $16.00 | $18.60 | $55.00 | $15.50 |
| 13 | Portable changeable message signs (0222-0164000E) | EACH | 2 | $4,250.00 | $5,000.00 | $2,400.00 | $25,000 | $15,000 |
| 14 | Delineators, type 1 yellow/red (0840-0100000E) | EACH | 2,475 | $75.00 | $85.00 | $77.00 | $105.00 | $80.00 |
| 15 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 1,547 | $10.02 | $13.57 | $6.72 | $8.40 | $16.16 |
| 16 | Signs, wide angle sheeting, sheet aluminum (0940-0205100J) | SF | 10,140 | $19.25 | $20.00 | $20.40 | $30.00 | $33.75 |
| 17 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 5,120 | $17.00 | $20.00 | $15.00 | $42.00 | $25.00 |
| 18 | Traffic control supervisor (0223-0169000E) | EACH | 60 | $1,350.00 | $1,750.00 | $1,200.00 | $2,000.00 | $1,300.00 |
| 19 | Flagger station lighting (0223-0168100E) | EACH | 3 | $2,000.00 | $2,000.00 | $2,880.00 | $8,100.00 | $3,500.00 |
| 20 | Flashing beacon installation, I-5 exit 6 NB off ramp (0990-0106000A) | EACH | 1 | $95,000 | $95,000 | $113,000 | $27,000 | $115,000 |
| 21 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 327 | $6.04 | $16.82 | $5.41 | $3.36 | $15.29 |
| 22 | Sequential arrow signs (0222-0162000E) | EACH | 1 | $1,000.00 | $2,500.00 | $1,200.00 | $5,000.00 | $5,000.00 |
| 23 | Flashing beacon installation, I-5 exit 24 NB & SB off ramp (0990-0106000A) | EACH | 1 | $25,000 | $25,000 | $60,000 | $53,000 | $30,000 |
| 24 | Flashing beacon installation, I-5 exit 27 NB & SB off ramp (0990-0106000A) | EACH | 1 | $25,000 | $25,000 | $60,000 | $53,000 | $30,000 |
| 25 | Temporary signs (0222-0102000J) | SF | 545 | $35.00 | $40.00 | $25.10 | $30.00 | $30.00 |
| 26 | BI-directional yellow type iar markers, recessed (0855-0107100E) | EACH | 315 | $22.50 | $16.00 | $18.60 | $55.00 | $15.50 |
| 27 | Wood sign posts (0910-0100000K) | FBM | 37,662 | $11.50 | $18.00 | $14.00 | $9.00 | $15.00 |
| 28 | Pollution control plan (0290-0100000A) | LS | 1 | $2,500.00 | $1,500.00 | $900.00 | $2,500.00 | $100.00 |
| 29 | Delineators, type 5 BI-directional, white/red (0840-0105000E) | EACH | 125 | $20.00 | $18.00 | $32.00 | $40.00 | $30.00 |
| 30 | Delineators, type 4 alternate 2 BI-directional, white/red (0840-0104200E) | EACH | 400 | $50.00 | $38.00 | $63.00 | $85.00 | $50.00 |
| 31 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 185 | $500.00 | $453.00 | $540.00 | $1,350.00 | $450.00 |
| 32 | Pavement bar, type B-HS (0867-0145100J) | SF | 588 | $14.50 | $13.00 | $15.60 | $25.00 | $13.00 |
| 33 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $5,100.00 | $10,000 | $5,925.00 | $18,000 | $12,500 |
| 34 | Sign support footings (0920-0100000A) | CY | 9.20 | $3,586.96 | $4,891.30 | $5,228.26 | $2,826.09 | $3,804.35 |
| 35 | Delineators, type 5 BI-directional, yellow/red (0840-0105000E) | EACH | 125 | $20.00 | $18.00 | $32.00 | $40.00 | $30.00 |
| 36 | Temporary plastic drums (0224-0145000E) | EACH | 160 | $25.00 | $75.00 | $45.10 | $27.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of January 23, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.