ODOT contract 15593 bid tabulation

Or6: devils lake fork wilson river bridge. Let by Oregon DOT on April 17, 2025, Region 2. 4 bids received.

Owner
Oregon DOT
Letting
17 APR 2025
Pay items
20
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
ODOT contract 15593: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4
1Sediment barrier, type 3 (0280-0115030F)LF40$150.00$4.41$20.00$2.00
2Permanent seeding (1030-0108000R)ACRE0.02$100,000$120,000$10,000$500.00
3Repair temporary impact attenuator, truck mounted (0226-0141400E)EACH1$300.00$4,707.00$1,000.00$15,000
4Surface preparation (0594-0103000A)LS1$1,400,000$1,124,000$2,540,000$2,800,000
5Temporary impact attenuator, truck mounted (0226-0138000E)EACH1$20,000$5,413.90$20,000$60,000
6Flaggers (0223-0168000T)HR200$100.00$129.46$50.00$150.00
7Pollution control plan (0290-0100000A)LS1$7,500.00$2,945.00$5,000.00$40,000
8Temporary barricades, type III (0224-0105000E)EACH2$200.00$111.81$500.00$1,000.00
9Coating application (0594-0104000A)LS1$1,200,000$720,000$650,000$1,800,000
10Work containment plan (0290-0102000A)LS1$20,000$3,530.00$15,000$40,000
11Temporary signs (0222-0102000J)SF125$15.00$17.65$50.00$14.00
12Rivet and bolt replacement (1999-9Z90000E)EACH25$750.00$294.23$1,200.00$1,100.00
13Automated flagger assistance device (0223-0200000E)EACH2$5,000.00$706.16$12,000$30,000
14Pack rust removal (0594-0108000F)LF500$100.00$571.82$100.00$2,000.00
15Matting, type C (0280-0105030J)SY100$25.00$1.18$10.00$2.00
16Structural steel maintenance (0560-0109000A)LB12,488$24.84$28.32$32.03$100.10
17Plastic sheeting (0280-0101000J)SY100$25.00$1.00$10.00$1.00
18Temporary work access and containment (0253-0106000A)LS1$1,300,000$2,286,404$1,250,000$600,000
19Straw bale (0280-0119000E)EACH3$100.00$9.81$50.00$10.00
20Coating materials (0594-0105000A)LS1$150,000$106,900$100,000$40,000
ODOT contract 15593: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of April 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy