ODOT contract 15604 bid tabulation
Or38: hinsdale slough culvert. Let by Oregon DOT on June 26, 2025, Region 3. 7 bids received.
- Owner
- Oregon DOT
- Letting
- 26 JUN 2025
- Pay items
- 29
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Temporary signs (0222-0102000J) | SF | 320 | $23.00 | $32.00 | $34.00 | $18.84 | $35.00 | $31.00 |
| 2 | Furnish sheet pile (1999-9Z90000A) | LS | 1 | $20,000 | $25,000 | $20,500 | $53,612 | $25,000 | $21,000 |
| 3 | Work containment plan (0290-0102000A) | LS | 1 | $2,000.00 | $2,500.00 | $6,980.00 | $5,597.44 | $15,000 | $500.00 |
| 4 | Reflective barrier panels (0226-0141100E) | EACH | 84 | $30.00 | $30.00 | $32.00 | $37.32 | $15.00 | $30.00 |
| 5 | Temporary mulching, straw (0280-0104020R) | ACRE | 0.03 | $38,000 | $38,000 | $39,500 | $106,586 | $38,000 | $38,000 |
| 6 | Thermoplastic, sprayed, surface, non-profiled (0865-0119600F) | LF | 770 | $8.25 | $8.25 | $8.45 | $10.26 | $8.25 | $8.25 |
| 7 | Flaggers (0223-0168000T) | HR | 200 | $76.00 | $72.50 | $74.50 | $92.05 | $74.00 | $73.00 |
| 8 | Temporary flexible pavement markers (0225-0149000E) | EACH | 668 | $2.35 | $1.00 | $2.15 | $8.53 | $3.00 | $3.00 |
| 9 | Granular wall backfill (0510-0106000A) | CY | 8 | $625.00 | $187.50 | $2,433.13 | $1,825.07 | $1,250.00 | $875.00 |
| 10 | Compost erosion blanket (0280-0105100J) | SY | 120 | $12.00 | $11.00 | $13.00 | $38.56 | $11.00 | $11.00 |
| 11 | PG 64-22 asphalt in level 3, 1/2 inch ACP (0745-0620000M) | TON | 3 | $1.00 | $500.00 | $36.00 | $370.12 | $1.00 | $1.00 |
| 12 | Temporary non-reflective tape (0225-0152000F) | LF | 6,000 | $4.75 | $4.75 | $4.85 | $5.91 | $1.00 | $4.75 |
| 13 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 1 | $1,000.00 | $1.00 | $250.00 | $4,975.50 | $10.00 | $1,000.00 |
| 14 | Furnish sheet pile driving equipment (1999-9Z90000A) | LS | 1 | $25,000 | $50,000 | $29,950 | $13,529 | $75,000 | $71,200 |
| 15 | Sediment barrier, type 3 (0280-0115030F) | LF | 180 | $9.00 | $8.50 | $5.35 | $18.92 | $8.50 | $5.50 |
| 16 | Temporary plastic drums (0224-0145000E) | EACH | 20 | $60.00 | $30.00 | $60.00 | $1,024.62 | $50.00 | $28.00 |
| 17 | Portable traffic signal, sta. "U" 257+08 (0227-0158100A) | LS | 1 | $6,000.00 | $2,500.00 | $11,500 | $8,973.04 | $10,000 | $17,000 |
| 18 | Pollution control plan (0290-0100000A) | LS | 1 | $2,000.00 | $500.00 | $1,495.00 | $1,865.82 | $500.00 | $500.00 |
| 19 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 345 | $1.00 | $15.00 | $55.00 | $27.53 | $1.00 | $40.00 |
| 20 | Straw bale (0280-0119000E) | EACH | 3 | $100.00 | $30.00 | $34.50 | $520.49 | $150.00 | $15.00 |
| 21 | Temporary removable tape (0225-0150000F) | LF | 6,680 | $3.25 | $3.25 | $3.35 | $4.04 | $1.00 | $3.25 |
| 22 | Retaining wall, sheet pile (1999-9Z90000A) | LS | 1 | $15,000 | $57,000 | $53,655 | $11,585 | $125,000 | $96,500 |
| 23 | Permanent seeding (1030-0108000R) | ACRE | 0.03 | $98,000 | $98,000 | $102,000 | $9,329.00 | $98,000 | $98,000 |
| 24 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 2 | $4,000.00 | $2,500.00 | $4,900.00 | $7,805.32 | $2,500.00 | $3,000.00 |
| 25 | Level 3, 1/2 inch ACP (0745-0302000M) | TON | 39 | $1.00 | $160.00 | $345.00 | $370.12 | $1.00 | $300.00 |
| 26 | Temporary barrier (0226-0126100F) | LF | 503.30 | $14.00 | $12.00 | $35.00 | $36.39 | $8.00 | $14.00 |
| 27 | Structure excavation (0510-0101000A) | CY | 8 | $625.00 | $187.50 | $562.50 | $1,123.42 | $1,250.00 | $500.00 |
| 28 | Continuous rumble strips (0857-0101000L) | MI | 0.16 | $48,500 | $48,500 | $49,500 | $91,425 | $48,500 | $48,500 |
| 29 | Portable traffic signal, sta. "U" 264+26 (0227-0158100A) | LS | 1 | $6,000.00 | $2,500.00 | $11,500 | $8,973.04 | $10,000 | $17,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of June 26, 2025. Compiled by Mirage Metrics.