ODOT contract 15615 bid tabulation
I-84: i-5 - hood river. Let by Oregon DOT on October 2, 2025, Region 1. 4 bids received.
- Owner
- Oregon DOT
- Letting
- 02 OCT 2025
- Pay items
- 50
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 |
|---|---|---|---|---|---|---|---|
| 1 | Lighting poles and arms (0970-0200000A) | EACH | 10 | $5,983.00 | $7,150.00 | $7,579.00 | $9,500.00 |
| 2 | Sequential arrow signs (0222-0162000E) | EACH | 2 | $2,800.00 | $575.00 | $2,400.00 | $2,040.00 |
| 3 | Traffic signal modification, I-84 EB entrance and exit ramps/NE 122ND ave (0990-0102000A) | EACH | 1 | $7,360.00 | $10,200 | $10,812 | $13,000 |
| 4 | Temporary barricades, type II (0224-0104000E) | EACH | 12 | $70.00 | $75.00 | $69.00 | $32.00 |
| 5 | Traffic signal modification, I-84 WB exit ramp/NE halsey ave (0990-0102000A) | EACH | 1 | $3,950.00 | $6,100.00 | $6,466.00 | $8,000.00 |
| 6 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 1,400 | $8.57 | $9.43 | $2.12 | $10.36 |
| 7 | Traffic signal modification, I-84 EB entrance ramps/hood river frontage RD (0990-0102000A) | EACH | 1 | $8,860.00 | $6,500.00 | $6,890.00 | $8,200.00 |
| 8 | Removal of electrical systems (0950-0101000A) | LS | 1 | $3,500.00 | $2,000.00 | $2,120.00 | $2,550.00 |
| 9 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 1 | $1.00 | $1,200.00 | $1,060.00 | $1.25 |
| 10 | Traffic signal modification, I-84 WB exit ramp/NE 13TH ave (0990-0102000A) | EACH | 1 | $11,900 | $14,400 | $15,264 | $18,140 |
| 11 | Traffic signal modification, EB entrance ramps/NE marine DR (0990-0102000A) | EACH | 1 | $7,550.00 | $10,200 | $10,812 | $13,000 |
| 12 | Pollution control plan (0290-0100000A) | LS | 1 | $1,500.00 | $1,500.00 | $514.00 | $2,500.00 |
| 13 | Temporary curb ramp, parallel (0228-0167670E) | EACH | 1 | $4,500.00 | $2,000.00 | $1,670.00 | $455.00 |
| 14 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 270 | $30.00 | $33.00 | $25.55 | $33.00 |
| 15 | Switching, conduit, and wiring (0970-0105000A) | LF | 650 | $178.06 | $118.46 | $125.57 | $153.85 |
| 16 | Traffic signal modification, I-84 WB exit ramps/NE 1ST ave/NE holladay ST (0990-0102000A) | EACH | 1 | $6,030.00 | $8,200.00 | $8,692.00 | $10,350 |
| 17 | Traffic signal modification, I-84 EB entrance ramp/NE grand ave (0990-0102000A) | EACH | 1 | $3,220.00 | $4,700.00 | $4,982.00 | $6,000.00 |
| 18 | Traffic signal modification, I-84 WB entrance ramps/2ND ST (0990-0102000A) | EACH | 1 | $9,680.00 | $12,450 | $13,197 | $16,000 |
| 19 | Sign support footings (0920-0100000A) | CY | 1.17 | $5,128.21 | $11,282 | $1,894.02 | $5,598.29 |
| 20 | Railroad flagger services (0223-0170000E) | EACH | 3 | $1,500.00 | $1,500.00 | $2,646.00 | $1,300.00 |
| 21 | Traffic control supervisor (0223-0169000E) | EACH | 20 | $950.00 | $1,300.00 | $669.90 | $1,500.00 |
| 22 | Traffic signal modification, WB entrance ramps/NE 238TH DR (0990-0102000A) | EACH | 1 | $7,280.00 | $10,500 | $11,130 | $13,225 |
| 23 | Clearing and grubbing (0320-0100000A) | ACRE | 1.40 | $17,661 | $26,429 | $17,751 | $21,786 |
| 24 | Temporary plastic drums (0224-0145000E) | EACH | 65 | $65.00 | $25.00 | $53.00 | $25.00 |
| 25 | Traffic signal modification, I-84 WB entrance ramps/ NE 181ST ave (0990-0102000A) | EACH | 1 | $7,780.00 | $9,800.00 | $10,388 | $12,500 |
| 26 | Flaggers (0223-0168000T) | HR | 800 | $80.00 | $75.00 | $64.66 | $115.00 |
| 27 | Flagger station lighting (0223-0168100E) | EACH | 4 | $1,250.00 | $600.00 | $1,923.00 | $1,890.00 |
| 28 | Crosswalk closure supports (0902-0101000E) | EACH | 1 | $2,100.00 | $2,200.00 | $972.00 | $1,650.00 |
| 29 | Traffic signal modification, I-84 EB exit and WB entrance ramps/NE glisan ave (0990-0102000A) | EACH | 1 | $6,630.00 | $8,800.00 | $9,328.00 | $11,250 |
| 30 | Pole foundations (0970-0100000A) | EACH | 10 | $2,035.00 | $4,600.00 | $5,406.00 | $5,795.00 |
| 31 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $2,000.00 | $1,650.00 | $1,292.00 | $3,589.00 |
| 32 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 74 | $31.00 | $33.00 | $21.82 | $32.50 |
| 33 | Traffic signal modification, I-84 WB entrance rmaps/NE marine DR (0990-0102000A) | EACH | 1 | $6,540.00 | $8,700.00 | $9,222.00 | $11,000 |
| 34 | Luminaires, lamps, and ballasts (0970-0104000A) | EACH | 20 | $641.25 | $725.00 | $768.50 | $913.25 |
| 35 | Pedestrian channelizing devices (0228-0141600F) | LF | 130 | $35.00 | $30.00 | $36.03 | $12.75 |
| 36 | Traffic signal modification, I-84 WB entrance ramps/button bridge RD (0990-0102000A) | EACH | 1 | $7,440.00 | $10,100 | $10,706 | $12,720 |
| 37 | Weed control (1030-0101000R) | ACRE | 0.10 | $12,000 | $50,000 | $10,070 | $22,850 |
| 38 | Wood sign posts (0910-0100000K) | FBM | 1,100 | $20.00 | $22.00 | $5.42 | $23.00 |
| 39 | Traffic signal modification, I-84 EB entrance ramps/NE 181ST ave (0990-0102000A) | EACH | 1 | $17,360 | $19,400 | $20,564 | $24,450 |
| 40 | Traffic signal modification, I-84 EB entrance ramps/NE fairview pkwy (0990-0102000A) | EACH | 1 | $13,090 | $13,600 | $14,416 | $17,130 |
| 41 | Temporary signs (0222-0102000J) | SF | 1,000 | $25.00 | $12.50 | $15.22 | $19.00 |
| 42 | Portable changeable message signs (0222-0164000E) | EACH | 2 | $3,850.00 | $3,750.00 | $5,273.50 | $4,093.00 |
| 43 | Temporary barricades, type III (0224-0105000E) | EACH | 12 | $225.00 | $190.00 | $185.50 | $88.00 |
| 44 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $7,500.00 | $5,000.00 | $5,936.00 | $3,465.00 |
| 45 | Remove existing signs (0905-0100000A) | LS | 1 | $1,500.00 | $1,100.00 | $5,021.00 | $3,150.00 |
| 46 | Removing and rebuilding fence (1050-0240000F) | LF | 50 | $165.00 | $148.00 | $199.08 | $168.00 |
| 47 | Traffic signal modification, I-84 EB entrance ramps/US 30 (0990-0102000A) | EACH | 1 | $9,080.00 | $12,300 | $13,038 | $15,490 |
| 48 | Lead compliance plan (0294-0500000A) | LS | 1 | $1,500.00 | $1,500.00 | $879.00 | $3,050.00 |
| 49 | Traffic signal modification, I-84 EB entrance ramps/NE 238TH DR (0990-0102000A) | EACH | 1 | $10,110 | $12,400 | $13,144 | $15,600 |
| 50 | Signs, wide angle sheeting, sheet aluminum (0940-0205100J) | SF | 250 | $25.00 | $33.00 | $22.62 | $26.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of October 2, 2025. Compiled by Mirage Metrics.