ODOT contract 15623 bid tabulation
I-84: (multi-use path) jordan rd tunnel - sandy river delta. Let by Oregon DOT on November 13, 2025, Region 1. 10 bids received.
- Owner
- Oregon DOT
- Letting
- 13 NOV 2025
- Pay items
- 51
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Bollards (0815-0100000E) | EACH | 1 | $2,250.00 | $843.43 | $1,375.00 | $1,500.00 | $2,200.00 | $1,600.00 |
| 2 | Temporary plastic drums (0224-0145000E) | EACH | 6 | $60.00 | $55.00 | $64.00 | $100.00 | $10.00 | $86.00 |
| 3 | Wood sign posts (0910-0100000K) | FBM | 270 | $24.00 | $8.45 | $28.00 | $18.00 | $29.25 | $23.00 |
| 4 | Signs, wide angle sheeting, sheet aluminum (0940-0205100J) | SF | 49.70 | $50.00 | $35.78 | $35.00 | $35.00 | $36.00 | $32.50 |
| 5 | Metal handrail, three rails with optional rail (1069-0300000F) | LF | 760 | $174.00 | $133.42 | $192.00 | $225.00 | $233.00 | $156.00 |
| 6 | Temporary barricades, type III (0224-0105000E) | EACH | 10 | $200.00 | $192.50 | $146.00 | $100.00 | $175.00 | $160.00 |
| 7 | Temporary signs (0222-0102000J) | SF | 400 | $25.00 | $14.33 | $5.00 | $10.00 | $18.75 | $27.25 |
| 8 | Guardrail transition (0810-0126000E) | EACH | 1 | $4,850.00 | $1,150.82 | $5,640.00 | $4,000.00 | $4,000.00 | $3,630.00 |
| 9 | Remove existing signs (0905-0100000A) | LS | 1 | $500.00 | $316.00 | $260.00 | $1,500.00 | $356.00 | $880.00 |
| 10 | Concrete curbs, standard curb (0759-0110000F) | LF | 120 | $64.00 | $40.59 | $61.00 | $75.00 | $66.50 | $51.00 |
| 11 | Construction entrance, type 1 (0280-0110010E) | EACH | 2 | $5,200.00 | $4,054.80 | $1,300.00 | $4,000.00 | $5,800.00 | $5,900.00 |
| 12 | Retaining wall, MSE (0596-A002000A) | SF | 6,000 | $83.33 | $70.35 | $82.50 | $98.33 | $97.67 | $106.00 |
| 13 | Woody coarse debris (1040-0202000E) | EACH | 3 | $1,600.00 | $1,057.84 | $577.00 | $1,000.00 | $1,132.88 | $500.00 |
| 14 | Borrow excavation (0330-0107000K) | CY | 200 | $30.00 | $72.19 | $42.00 | $66.00 | $50.98 | $45.65 |
| 15 | Clearing and grubbing (0320-0100000A) | ACRE | 1.40 | $34,286 | $66,975 | $50,000 | $42,857 | $78,571 | $115,371 |
| 16 | Straw bale (0280-0119000E) | EACH | 2 | $150.00 | $56.10 | $128.00 | $75.00 | $50.00 | $60.00 |
| 17 | Temporary type CL chain link fence (0270-0114000F) | LF | 110 | $15.00 | $5.71 | $46.00 | $30.00 | $9.50 | $9.25 |
| 18 | Asphalt pavement sawcutting, 6 inches deep (0310-0119100F) | LF | 170 | $8.50 | $4.02 | $3.50 | $10.00 | $4.55 | $3.00 |
| 19 | Removal of guardrail (0310-0113000A) | LF | 68 | $17.65 | $47.83 | $19.85 | $29.41 | $14.25 | $48.53 |
| 20 | Sediment barrier, type 8 (0280-0115080E) | EACH | 1,100 | $7.00 | $6.23 | $10.00 | $0.01 | $8.32 | $9.00 |
| 21 | Sediment barrier, type 3 (0280-0115030F) | LF | 100 | $10.00 | $4.19 | $7.00 | $4.00 | $11.88 | $8.00 |
| 22 | Sediment fence (0280-0113000F) | LF | 2,000 | $2.75 | $4.46 | $4.00 | $2.00 | $3.27 | $4.10 |
| 23 | Portable changeable message signs (0222-0164000E) | EACH | 1 | $9,000.00 | $3,487.00 | $10,000 | $15,000 | $1,500.00 | $10,915 |
| 24 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $5,000.00 | $5,020.40 | $1,650.00 | $500.00 | $17,255 | $9,500.00 |
| 25 | Midwest guardrail system, type 2A weatherized (0810-0146100F) | LF | 150 | $44.00 | $151.88 | $50.00 | $65.00 | $55.00 | $70.00 |
| 26 | Aggregate base (0640-0100000M) | TON | 431.12 | $51.00 | $58.40 | $44.00 | $52.00 | $92.00 | $105.00 |
| 27 | Midwest guardrail system, type 3 weatherized (0810-0146100F) | LF | 12.50 | $70.00 | $597.17 | $80.00 | $120.00 | $110.00 | $132.00 |
| 28 | Longitudinal pavement markings - paint (0860-0200000F) | LF | 90 | $7.50 | $5.55 | $4.50 | $10.00 | $8.00 | $16.50 |
| 29 | Flaggers (0223-0168000T) | HR | 900 | $80.00 | $75.60 | $80.00 | $75.00 | $78.75 | $0.01 |
| 30 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 65 | $34.00 | $34.94 | $38.00 | $40.00 | $42.00 | $55.00 |
| 31 | Concrete washout facility (0280-0112500E) | EACH | 1 | $1,200.00 | $484.00 | $1,400.00 | $2,000.00 | $3,250.00 | $1,250.00 |
| 32 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $2,000.00 | $8,190.00 | $15,400 | $1,000.00 | $4,752.00 | $3,200.00 |
| 33 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 38 | $105.00 | $110.00 | $72.00 | $80.00 | $80.50 | $77.00 |
| 34 | Matting, type E (0280-0105050J) | SY | 580 | $5.00 | $7.64 | $5.00 | $4.00 | $6.00 | $4.50 |
| 35 | Lead compliance plan (0294-0500000A) | LS | 1 | $2,400.00 | $471.90 | $1,500.00 | $100.00 | $4,158.00 | $1,300.00 |
| 36 | Permanent seeding, mix no. 1 (1030-0109000R) | ACRE | 0.70 | $10,000 | $4,200.00 | $11,500 | $4,000.00 | $11,880 | $7,870.00 |
| 37 | Stone embankment (0330-0126000K) | CY | 400 | $100.00 | $116.36 | $150.00 | $112.00 | $122.28 | $135.00 |
| 38 | General excavation (0330-0105000K) | CY | 1,600 | $46.00 | $48.14 | $45.00 | $50.00 | $54.57 | $66.25 |
| 39 | Compost erosion blanket (0280-0105100J) | SY | 3,300 | $3.25 | $4.73 | $6.00 | $3.00 | $3.86 | $4.70 |
| 40 | Deciduous trees, #2 container (1040-0148000E) | EACH | 15 | $30.00 | $682.50 | $35.00 | $650.00 | $35.64 | $94.00 |
| 41 | Temporary barricades, type II (0224-0104000E) | EACH | 4 | $60.00 | $71.50 | $37.00 | $100.00 | $65.00 | $80.00 |
| 42 | Temporary guardrail end pieces (0226-0145000E) | EACH | 2 | $300.00 | $518.10 | $349.00 | $200.00 | $150.00 | $165.00 |
| 43 | Temporary guardrail anchors (0226-0146000E) | EACH | 2 | $2,400.00 | $2,269.30 | $2,805.00 | $1,000.00 | $1,000.00 | $2,200.00 |
| 44 | Weed control (1030-0101000R) | ACRE | 0.70 | $6,000.00 | $2,625.00 | $7,000.00 | $1,000.00 | $7,128.00 | $4,110.00 |
| 45 | Temporary transverse rumble strips (0225-0153800F) | LF | 120 | $90.00 | $235.03 | $236.00 | $40.00 | $69.00 | $26.65 |
| 46 | Concrete walks (0759-0128000J) | SF | 150 | $26.00 | $20.17 | $34.00 | $75.00 | $60.65 | $19.00 |
| 47 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 173.82 | $168.00 | $179.32 | $186.00 | $180.00 | $190.00 | $187.00 |
| 48 | Pollution control plan (0290-0100000A) | LS | 1 | $1,000.00 | $487.30 | $144.00 | $100.00 | $550.00 | $1,500.00 |
| 49 | Topsoil (1040-0101000K) | CY | 200 | $42.00 | $93.45 | $49.00 | $100.00 | $49.90 | $42.00 |
| 50 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 33.40 | $50.00 | $54.57 | $29.00 | $50.00 | $30.00 | $36.00 |
| 51 | Guardrail height conversion, type 2A weatherized (0810-0147000E) | EACH | 1 | $1,600.00 | $1,091.20 | $1,845.00 | $3,000.00 | $1,500.00 | $1,450.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.