ODOT contract 15627 bid tabulation
Pole line lane rail crossing (haines). Let by Oregon DOT on December 11, 2025, Region 5. 5 bids received.
- Owner
- Oregon DOT
- Letting
- 11 DEC 2025
- Pay items
- 26
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 |
|---|---|---|---|---|---|---|---|---|
| 1 | Aggregate base (0641-0102000M) | TON | 1,500 | $46.00 | $36.61 | $42.00 | $39.50 | $38.00 |
| 2 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 77 | $31.00 | $35.00 | $35.00 | $40.00 | $35.00 |
| 3 | Cold plane pavement removal, 0 - 3 inches deep (0620-0106000J) | SY | 870 | $5.00 | $7.29 | $6.60 | $10.00 | $17.00 |
| 4 | Temporary signs (0222-0102000J) | SF | 700 | $50.00 | $22.00 | $22.00 | $42.00 | $22.00 |
| 5 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 360 | $5.00 | $7.29 | $6.60 | $10.00 | $17.00 |
| 6 | Temporary plastic drums (0224-0145000E) | EACH | 18 | $60.00 | $40.00 | $40.00 | $40.00 | $100.00 |
| 7 | Preparation of shoulders (0334-0100000A) | MI | 0.02 | $115,000 | $2,385,000 | $650,000 | $150,000 | $100,000 |
| 8 | Temporary barricades, type III (0224-0105000E) | EACH | 12 | $270.00 | $150.00 | $150.00 | $200.00 | $150.00 |
| 9 | Portable changeable message signs (0222-0164000E) | EACH | 3 | $4,500.00 | $3,000.00 | $3,000.00 | $1,500.00 | $2,500.00 |
| 10 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $12,000 | $2,500.00 | $3,500.00 | $5,000.00 | $5,000.00 |
| 11 | Level 2, 1/2 inch ACP mixture in leveling (0744-0231000M) | TON | 32 | $127.00 | $126.00 | $125.00 | $117.00 | $200.00 |
| 12 | Pavement bar, type B (0867-0145000J) | SF | 110 | $22.00 | $15.00 | $21.50 | $25.00 | $21.50 |
| 13 | Bar removal (0225-0156000J) | SF | 12 | $15.00 | $17.00 | $25.00 | $200.00 | $50.00 |
| 14 | Flaggers (0223-0168000T) | HR | 80 | $77.00 | $90.00 | $85.00 | $85.00 | $100.00 |
| 15 | Level 2, 1/2 inch ACP mixture (0744-0202000M) | TON | 1,100 | $127.00 | $126.00 | $122.00 | $117.00 | $175.00 |
| 16 | Wood sign posts (0910-0100000K) | FBM | 282 | $15.00 | $16.00 | $16.00 | $20.00 | $16.00 |
| 17 | Remove existing signs (0905-0100000A) | LS | 1 | $2,000.00 | $3,600.00 | $550.00 | $1,500.00 | $1,000.00 |
| 18 | Longitudinal pavement markings - paint (0860-0200000F) | LF | 5,600 | $1.50 | $0.40 | $1.50 | $3.00 | $1.50 |
| 19 | Removing and rebuilding fence (1050-0240000F) | LF | 32 | $47.00 | $25.00 | $98.00 | $200.00 | $100.00 |
| 20 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 4 | $23.00 | $35.00 | $35.00 | $45.00 | $35.00 |
| 21 | Delineators, type 1 (0840-0100000E) | EACH | 10 | $220.00 | $80.00 | $220.00 | $85.00 | $80.00 |
| 22 | Embankment in place (0330-0123000K) | CY | 280 | $42.00 | $87.45 | $44.50 | $80.00 | $65.00 |
| 23 | Temporary type 1 fence (0270-0100000F) | LF | 300 | $35.00 | $15.00 | $29.75 | $40.00 | $30.00 |
| 24 | Milepost marker posts (0840-0106000E) | EACH | 1 | $250.00 | $275.00 | $275.00 | $350.00 | $275.00 |
| 25 | Railroad flagger services (0223-0170000E) | EACH | 14 | $1,800.00 | $1,495.00 | $1,800.00 | $2,500.00 | $500.00 |
| 26 | Pollution control plan (0290-0100000A) | LS | 1 | $1,000.00 | $500.00 | $500.00 | $500.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of December 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.