ODOT contract 15641 bid tabulation

Driver feedback signs (deschutes county). Let by Oregon DOT on January 15, 2026, Region 4. 5 bids received.

Owner
Oregon DOT
Letting
15 JAN 2026
Pay items
7
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
5
ODOT contract 15641: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4Rank 5
1Flaggers (0223-0168000T)HR165$80.00$70.00$68.00$96.00$108.00
2Temporary signs (0222-0102000J)SF375$15.00$15.00$1.00$15.00$15.00
3Remove existing signs (0905-0100000A)LS1$600.00$1,000.00$500.00$100.00$1,000.00
4Unintegrated speed feedback assembly (0991-0100000E)EACH24$12,100$11,200$13,500$12,700$15,500
5Pollution control plan (0290-0100000A)LS1$1,500.00$1,500.00$500.00$1,500.00$1,000.00
6Lead compliance plan (0294-0500000A)LS1$1,500.00$1,500.00$500.00$1,500.00$700.00
7Signs, standard sheeting, sheet aluminum (0940-0202000J)SF288$15.00$45.00$12.00$18.00$22.00
ODOT contract 15641: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy