ODOT contract 15651 bid tabulation
Or138e mp 29.5 - 30.9 paris reservoir landslide. Let by Oregon DOT on April 2, 2026, Region 3. 4 bids received.
- Owner
- Oregon DOT
- Letting
- 02 APR 2026
- Pay items
- 61
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 |
|---|---|---|---|---|---|---|---|
| 1 | Supplemental drain anchors (1999-9Z90000E) | EACH | 50 | $250.00 | $250.00 | $250.00 | $250.00 |
| 2 | Sloped end sections, 30 inch (0445-0700300E) | EACH | 1 | $250.00 | $200.00 | $300.00 | $5,500.00 |
| 3 | Stone embankment (0330-0126000K) | CY | 1,860 | $64.00 | $60.00 | $95.00 | $215.00 |
| 4 | Impact attenuator, type E (0830-0118000E) | EACH | 6 | $30,120 | $30,000 | $47,000 | $37,500 |
| 5 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 1,100 | $164.00 | $198.00 | $159.00 | $180.00 |
| 6 | Automated flagger assistance device (0223-0200000E) | EACH | 2 | $6,000.00 | $13,500 | $8,100.00 | $6,300.00 |
| 7 | Mainline video with laser profile inspection (0415-0401000F) | LF | 500 | $10.00 | $20.30 | $13.00 | $5.00 |
| 8 | Paved culvert end slopes (0460-0100000J) | SF | 400 | $48.00 | $40.00 | $28.00 | $35.00 |
| 9 | Temporary flashing beacons, all locations (0227-0160001A) | LS | 1 | $6,000.00 | $10,000 | $10,000 | $5,000.00 |
| 10 | Plastic sheeting (0280-0101000J) | SY | 3,000 | $4.00 | $2.00 | $0.75 | $8.00 |
| 11 | Concrete closure collars (0445-0735020E) | EACH | 9 | $900.00 | $1,000.00 | $300.00 | $800.00 |
| 12 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $16,800 | $75,000 | $4,250.00 | $5,000.00 |
| 13 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $29,000 | $75,000 | $38,000 | $12,000 |
| 14 | Loose riprap, class 200 (0390-0111000K) | CY | 75 | $140.00 | $110.00 | $142.00 | $250.00 |
| 15 | Temporary transverse rumble strips, raised (0225-0153810F) | LF | 300 | $18.00 | $35.00 | $18.50 | $9.00 |
| 16 | Horizontal drain drilling access (1999-9Z90000E) | EACH | 10 | $17,000 | $12,000 | $17,170 | $30,000 |
| 17 | Temporary barricades, type III (0224-0105000E) | EACH | 7 | $185.00 | $150.00 | $90.00 | $320.00 |
| 18 | Concrete inlets, type D (0470-0311000E) | EACH | 5 | $2,800.00 | $5,000.00 | $4,500.00 | $6,000.00 |
| 19 | Portable traffic signal, all locations (0227-0158100A) | LS | 1 | $58,000 | $120,000 | $78,000 | $45,000 |
| 20 | Horizontal drains (1999-9Z90000F) | LF | 75,400 | $45.00 | $45.00 | $56.00 | $46.50 |
| 21 | Remove and reinstall existing concrete barrier, tall (0820-0510000F) | LF | 1,987.50 | $11.00 | $13.00 | $44.00 | $25.00 |
| 22 | 18 inch drain pipe (0430-0100180F) | LF | 1,035 | $60.00 | $100.00 | $55.00 | $135.00 |
| 23 | Permanent seeding (1030-0108000R) | ACRE | 0.84 | $3,800.00 | $3,600.00 | $3,600.00 | $3,500.00 |
| 24 | Temporary mulching, straw (0280-0104020R) | ACRE | 0.25 | $6,000.00 | $9,000.00 | $5,000.00 | $5,000.00 |
| 25 | Straw bale (0280-0119000E) | EACH | 100 | $40.00 | $28.00 | $50.00 | $200.00 |
| 26 | Culvert drainage markers, type 1 (0842-0201000E) | EACH | 9 | $200.00 | $150.00 | $150.00 | $150.00 |
| 27 | Delineators, type 5 (0840-0105000E) | EACH | 80 | $42.00 | $15.00 | $36.00 | $25.00 |
| 28 | Sloped end sections, 24 inch (0445-0700240E) | EACH | 2 | $250.00 | $150.00 | $200.00 | $4,500.00 |
| 29 | Flaggers (0223-0168000T) | HR | 3,000 | $80.00 | $68.00 | $84.00 | $100.00 |
| 30 | 36 inch culvert pipe, 5 FT depth (0445-010036AF) | LF | 6 | $498.00 | $480.00 | $535.00 | $1,400.00 |
| 31 | Drainage geotextile, type 1 (0350-0100000J) | SY | 1,100 | $2.00 | $2.75 | $5.00 | $3.00 |
| 32 | Temporary pavement bars (0225-0153200J) | SF | 120 | $23.00 | $30.00 | $12.00 | $16.00 |
| 33 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 1 | $33,000 | $25,000 | $25,000 | $21,000 |
| 34 | General excavation (0330-0105000K) | CY | 1,580 | $29.00 | $35.00 | $65.00 | $185.00 |
| 35 | 30 inch culvert pipe, 5 FT depth (0445-010030AF) | LF | 8 | $280.00 | $400.00 | $400.00 | $1,000.00 |
| 36 | Sloped end sections, 18 inch (0445-0700180E) | EACH | 8 | $200.00 | $125.00 | $200.00 | $4,500.00 |
| 37 | Matting, type D (0280-0105040J) | SY | 6,625 | $8.00 | $7.75 | $7.75 | $7.00 |
| 38 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 2 | $600.00 | $500.00 | $1,500.00 | $7,500.00 |
| 39 | Portable changeable message signs (0222-0164000E) | EACH | 5 | $8,000.00 | $20,000 | $10,200 | $7,100.00 |
| 40 | Removal of pipes (0310-0100000F) | LF | 212 | $22.00 | $10.00 | $13.00 | $100.00 |
| 41 | Drain orientation readings (1999-9Z90000E) | EACH | 50 | $500.00 | $500.00 | $500.00 | $500.00 |
| 42 | Steel casing (1999-9Z90000F) | LF | 2,200 | $125.00 | $125.00 | $125.00 | $125.00 |
| 43 | Delineators, type 1 (0840-0100000E) | EACH | 15 | $86.00 | $65.00 | $150.00 | $25.00 |
| 44 | Thermoplastic, sprayed, surface, non-profiled (0865-0119600F) | LF | 6,500 | $4.00 | $2.50 | $2.50 | $2.50 |
| 45 | Check dam, type 1 (0280-0106010E) | EACH | 10 | $200.00 | $325.00 | $300.00 | $450.00 |
| 46 | Clearing and grubbing (0320-0100000A) | ACRE | 0.83 | $236,627 | $30,120 | $24,096 | $30,120 |
| 47 | Subgrade geotextile (0350-0105000J) | SY | 2,750 | $2.00 | $2.50 | $1.75 | $3.00 |
| 48 | Extra for asphalt approaches (0749-0100000E) | EACH | 6 | $1,600.00 | $500.00 | $1,350.00 | $1,000.00 |
| 49 | Compost erosion blanket (0280-0105100J) | SY | 5,300 | $7.00 | $6.75 | $6.75 | $7.00 |
| 50 | Sloped end sections, 36 inch (0445-0700360E) | EACH | 1 | $260.00 | $200.00 | $300.00 | $5,500.00 |
| 51 | 24 inch culvert pipe, 5 FT depth (0445-010024AF) | LF | 55 | $200.00 | $300.00 | $300.00 | $750.00 |
| 52 | Asphalt pavement sawcutting, 6 to 14 inches deep (0310-0119120F) | LF | 3,825 | $6.00 | $5.00 | $3.50 | $5.00 |
| 53 | Securing concrete barrier (0820-0400000F) | LF | 3,612.50 | $19.00 | $15.00 | $17.50 | $29.00 |
| 54 | Pollution control plan (0290-0100000A) | LS | 1 | $1,200.00 | $500.00 | $100.00 | $1,000.00 |
| 55 | Topsoil (1040-0101000K) | CY | 1,767 | $103.00 | $97.00 | $97.00 | $98.00 |
| 56 | Flagger station lighting (0223-0168100E) | EACH | 2 | $15,650 | $750.00 | $600.00 | $4,250.00 |
| 57 | Aggregate base (0640-0100000M) | TON | 3,274 | $32.00 | $55.00 | $65.00 | $120.00 |
| 58 | Concrete barrier, tall (0820-0127000F) | LF | 1,975 | $140.00 | $130.00 | $160.00 | $147.00 |
| 59 | Temporary plastic drums (0224-0145000E) | EACH | 232 | $67.00 | $55.00 | $25.00 | $110.00 |
| 60 | Temporary signs (0222-0102000J) | SF | 460 | $38.00 | $40.00 | $33.00 | $30.00 |
| 61 | Temporary non-reflective tape (0225-0152000F) | LF | 9,140 | $6.00 | $4.00 | $6.20 | $5.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of April 2, 2026. Compiled by Mirage Metrics.