ODOT contract 15658 bid tabulation
Us101: 80 acres landslide repair. Let by Oregon DOT on April 9, 2026, Region 3. 5 bids received.
- Owner
- Oregon DOT
- Letting
- 09 APR 2026
- Pay items
- 41
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 |
|---|---|---|---|---|---|---|---|---|
| 1 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 462.50 | $39.00 | $39.00 | $45.00 | $38.70 | $58.00 |
| 2 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 530 | $215.00 | $200.00 | $210.00 | $190.00 | $203.00 |
| 3 | Sequential arrow signs (0222-0162000E) | EACH | 1 | $6,500.00 | $5,000.00 | $6,000.00 | $1,500.00 | $1,369.00 |
| 4 | Sediment barrier, type 8 (0280-0115080F) | LF | 1,832 | $9.00 | $11.00 | $10.00 | $10.00 | $12.00 |
| 5 | Automated flagger assistance device (0223-0200000E) | EACH | 2 | $14,500 | $5,000.00 | $6,000.00 | $7,000.00 | $3,346.00 |
| 6 | Portable changeable message signs (0222-0164000E) | EACH | 1 | $10,000 | $7,500.00 | $7,000.00 | $1,500.00 | $3,954.00 |
| 7 | Reflective barrier panels (0226-0141100E) | EACH | 104 | $35.00 | $36.00 | $34.00 | $36.50 | $69.00 |
| 8 | Riprap geotextile, type 2 (0350-0104000J) | SY | 7,225 | $3.50 | $5.00 | $3.00 | $2.25 | $9.00 |
| 9 | Stone embankment (0330-0126000K) | CY | 34,730 | $41.00 | $48.00 | $61.46 | $84.90 | $90.00 |
| 10 | Guardrail terminals, downstream anchor terminal (0810-0132200E) | EACH | 1 | $1,900.00 | $1,900.00 | $4,000.00 | $1,880.00 | $3,299.00 |
| 11 | Delineators, type 1 (0840-0100000E) | EACH | 6 | $87.00 | $88.00 | $110.00 | $89.00 | $114.00 |
| 12 | Guardrail height conversion, type 2A (0810-0147000E) | EACH | 1 | $1,750.00 | $1,550.00 | $1,000.00 | $1,500.00 | $2,508.00 |
| 13 | Temporary barrier (0226-0126100F) | LF | 588 | $51.00 | $40.00 | $30.00 | $32.00 | $61.00 |
| 14 | General excavation (0330-0105000K) | CY | 59,817 | $28.00 | $28.00 | $24.39 | $33.35 | $43.00 |
| 15 | Permanent seeding (1030-0108000R) | ACRE | 1.30 | $6,500.00 | $7,000.00 | $6,000.00 | $9,850.00 | $6,033.00 |
| 16 | Aggregate base (0640-0100000M) | TON | 610 | $17.00 | $45.00 | $32.00 | $68.00 | $63.00 |
| 17 | Pollution control plan (0290-0100000A) | LS | 1 | $2,500.00 | $1,000.00 | $1,200.00 | $100.00 | $5,000.00 |
| 18 | Temporary removable tape (0225-0150000F) | LF | 650 | $14.50 | $4.00 | $4.00 | $3.00 | $3.00 |
| 19 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 900 | $13.50 | $7.00 | $13.00 | $12.50 | $24.00 |
| 20 | Temporary signs (0222-0102000J) | SF | 220 | $20.00 | $40.00 | $39.00 | $35.00 | $28.00 |
| 21 | 18 inch culvert pipe, over 20 FT depth (0445-010018DF) | LF | 45 | $217.00 | $500.00 | $350.00 | $900.00 | $408.00 |
| 22 | Clearing and grubbing (0320-0100000A) | ACRE | 1.30 | $16,154 | $34,615 | $106,154 | $22,308 | $56,157 |
| 23 | Connection to existing structures (0490-0104000E) | EACH | 1 | $1,100.00 | $1,000.00 | $1,200.00 | $1,700.00 | $2,606.00 |
| 24 | Mono-directional white type iar markers, recessed (0855-0106100E) | EACH | 11 | $38.00 | $38.50 | $200.00 | $39.00 | $96.00 |
| 25 | Temporary barricades, type II (0224-0104000E) | EACH | 2 | $50.00 | $50.00 | $65.00 | $70.00 | $85.00 |
| 26 | Temporary barricades, type III (0224-0105000E) | EACH | 3 | $75.00 | $250.00 | $180.00 | $195.00 | $256.00 |
| 27 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $10,000 | $30,000 | $7,900.00 | $1,200.00 | $15,000 |
| 28 | Sloped end sections, 8 inch (0445-0700080E) | EACH | 1 | $850.00 | $1,000.00 | $200.00 | $4,000.00 | $950.00 |
| 29 | Temporary impact attenuator, narrow site system (0226-0134000E) | EACH | 2 | $2,450.00 | $4,400.00 | $4,500.00 | $4,000.00 | $7,815.00 |
| 30 | Thermoplastic, sprayed, surface, non-profiled (0865-0119600F) | LF | 1,390 | $5.00 | $5.00 | $12.00 | $5.00 | $12.00 |
| 31 | BI-directional yellow type iar markers, recessed (0855-0107100E) | EACH | 11 | $38.00 | $38.50 | $200.00 | $39.00 | $96.00 |
| 32 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $27,500 | $25,000 | $36,000 | $14,500 | $19,152 |
| 33 | Repair temporary impact attenuator, narrow site system (0226-0141300E) | EACH | 4 | $1,000.00 | $1,650.00 | $200.00 | $1,100.00 | $2,084.00 |
| 34 | 18 inch subgrade stabilization (0331-0109000J) | SY | 100 | $65.00 | $250.00 | $27.00 | $100.00 | $58.00 |
| 35 | 8 inch culvert pipe, 5 FT depth (0445-010008AF) | LF | 300 | $46.00 | $50.00 | $63.00 | $63.00 | $61.00 |
| 36 | Sediment fence (0280-0113000F) | LF | 683 | $4.50 | $7.00 | $6.00 | $4.00 | $11.00 |
| 37 | Asphalt pavement sawcutting, greater than 14 inches deep (0310-0119130F) | LF | 430 | $14.00 | $10.00 | $16.00 | $15.50 | $9.00 |
| 38 | Temporary plastic drums (0224-0145000E) | EACH | 42 | $55.00 | $25.00 | $65.00 | $55.00 | $23.00 |
| 39 | Straw bale (0280-0119000E) | EACH | 30 | $19.00 | $50.00 | $30.00 | $14.00 | $100.00 |
| 40 | Construction entrance, type 1 (0280-0110010E) | EACH | 1 | $3,500.00 | $2,500.00 | $3,500.00 | $11,000 | $5,470.00 |
| 41 | Flaggers (0223-0168000T) | HR | 100 | $101.00 | $90.00 | $86.00 | $90.00 | $84.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of April 9, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.