ODOT contract 15665 bid tabulation
Us101: burnt hill repair. Let by Oregon DOT on June 4, 2026, Region 3. 3 bids received.
- Owner
- Oregon DOT
- Letting
- 04 JUN 2026
- Pay items
- 22
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 |
|---|---|---|---|---|---|---|
| 1 | Embankment in place (0330-0123000K) | CY | 400 | $54.00 | $1.00 | $114.25 |
| 2 | Aggregate shoulders (0640-0101000M) | TON | 75 | $60.00 | $120.00 | $102.75 |
| 3 | Turbidity monitoring (0290-0200000A) | LS | 1 | $1,600.00 | $500.00 | $660.00 |
| 4 | Mainline video with laser profile inspection (0415-0401000F) | LF | 660 | $12.00 | $9.00 | $10.00 |
| 5 | Automated flagger assistance device (0223-0200000E) | EACH | 2 | $1,200.00 | $1,000.00 | $1,320.00 |
| 6 | Clearing and grubbing (0320-0100000A) | ACRE | 0.20 | $140,000 | $200,000 | $81,265 |
| 7 | Temporary non-reflective tape (0225-0152000F) | LF | 2,000 | $9.00 | $10.00 | $5.75 |
| 8 | Temporary barricades, type III (0224-0105000E) | EACH | 4 | $190.00 | $180.00 | $234.00 |
| 9 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 1 | $3,200.00 | $3,000.00 | $13,432 |
| 10 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $2,000.00 | $10,000 | $3,341.00 |
| 11 | Loose riprap, class 50 (0390-0105000K) | CY | 3 | $260.00 | $750.00 | $561.25 |
| 12 | Temporary signs (0222-0102000J) | SF | 155 | $35.00 | $30.00 | $43.50 |
| 13 | Flaggers (0223-0168000T) | HR | 200 | $80.00 | $85.00 | $230.00 |
| 14 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 2 | $100.00 | $500.00 | $1,800.00 |
| 15 | Concrete inlets, type D (0470-0311000E) | EACH | 3 | $2,800.00 | $6,500.00 | $6,739.00 |
| 16 | Temporary plastic drums (0224-0145000E) | EACH | 30 | $80.00 | $40.00 | $162.50 |
| 17 | 18 inch storm sewer pipe, 10 FT depth (0445-035018BF) | LF | 440 | $260.00 | $200.00 | $242.50 |
| 18 | Permanent seeding (1030-0108000R) | ACRE | 0.20 | $20,000 | $15,000 | $26,153 |
| 19 | Pollution control plan (0290-0100000A) | LS | 1 | $800.00 | $250.00 | $813.75 |
| 20 | Sloped end sections, 18 inch (0445-0700180E) | EACH | 1 | $300.00 | $650.00 | $5,097.75 |
| 21 | 18 inch storm sewer pipe, 5 FT depth (0445-035018AF) | LF | 220 | $228.00 | $180.00 | $254.00 |
| 22 | Check dam, type 1 (0280-0106010E) | EACH | 35 | $123.00 | $300.00 | $287.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of June 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.