ODOT contract 15680 bid tabulation
Portland & surrounding areas signal system coordination. Let by Oregon DOT on August 13, 2026, Region 1. 4 bids received.
- Owner
- Oregon DOT
- Letting
- 13 AUG 2026
- Pay items
- 20
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 |
|---|---|---|---|---|---|---|---|
| 1 | Temporary signs (0222-0102000J) | SF | 350 | $12.00 | $30.00 | $26.00 | $25.00 |
| 2 | Traffic signal modification, OR212/224 at fred meyer access (0990-0102000A) | EACH | 1 | $16,400 | $16,800 | $19,245 | $30,000 |
| 3 | Temporary barricades, type II (0224-0104000E) | EACH | 6 | $70.00 | $50.00 | $75.00 | $100.00 |
| 4 | Flaggers (0223-0168000T) | HR | 320 | $61.50 | $89.00 | $80.00 | $70.00 |
| 5 | Pollution control plan (0290-0100000A) | LS | 1 | $1,000.00 | $1,500.00 | $1,000.00 | $1,500.00 |
| 6 | Removal of electrical systems (0950-0101000A) | LS | 1 | $2,500.00 | $8,300.00 | $4,500.00 | $15,000 |
| 7 | Traffic signal modification, OR99W at durham (0990-0102000A) | EACH | 1 | $27,000 | $28,200 | $30,230 | $40,000 |
| 8 | Flagger station lighting (0223-0168100E) | EACH | 4 | $650.00 | $500.00 | $1,350.00 | $1,500.00 |
| 9 | Temporary barricades, type III (0224-0105000E) | EACH | 6 | $190.00 | $225.00 | $175.00 | $200.00 |
| 10 | Traffic signal modification, OR217 NB at 72ND (0990-0102000A) | EACH | 1 | $15,400 | $16,000 | $18,025 | $30,000 |
| 11 | Traffic signal modification, OR141 at burnham (0990-0102000A) | EACH | 1 | $17,600 | $17,800 | $19,765 | $30,000 |
| 12 | Temporary plastic drums (0224-0145000E) | EACH | 20 | $55.00 | $50.00 | $20.00 | $30.00 |
| 13 | Traffic signal modification, OR99W at fischer (0990-0102000A) | EACH | 1 | $16,300 | $16,800 | $19,210 | $30,000 |
| 14 | Sequential arrow signs (0222-0162000E) | EACH | 2 | $500.00 | $500.00 | $1,200.00 | $1,500.00 |
| 15 | Traffic signal modification, OR8 at 26TH (0990-0102000A) | EACH | 1 | $25,600 | $26,000 | $29,205 | $40,000 |
| 16 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 1 | $400.00 | $1.00 | $1.00 | $2,500.00 |
| 17 | Traffic signal modification, or 8 at fred meyer access (0990-0102000A) | EACH | 1 | $16,200 | $16,400 | $20,565 | $30,000 |
| 18 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 1 | $4,950.00 | $5,500.00 | $2,500.00 | $3,000.00 |
| 19 | Traffic signal modification, OR99W at royalty pkwy (0990-0102000A) | EACH | 1 | $30,000 | $29,000 | $30,230 | $40,000 |
| 20 | Traffic signal modification, OR99W at edy (0990-0102000A) | EACH | 1 | $28,500 | $26,500 | $27,590 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of August 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.