SCDOT contract 2273500 bid tabulation

2026 Georgetown Pavement Improvement. Let by South Carolina DOT on January 13, 2026, Georgetown, District 5. 4 bids received; low bid $7,138,854 by King Asphalt, Inc..

Owner
South Carolina DOT
Letting
13 JAN 2026
Pay items
39
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1King Asphalt, Inc.$7,138,854Low
2Coastal Asphalt, LLC$7,371,860+3.0%
3Palmetto Corp. of Conway$7,962,788+12%
4L. Dean Weaver Company LLC$8,784,094+23%
SCDOT contract 2273500: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. King Asphalt, Inc.2. Coastal Asphalt, LLC3. Palmetto Corp. of Conway4. L. Dean Weaver Company LLC
0010Mobilization (1031000)LS1$285,000$205,000$290,000$418,000
0020Bonds and insurance (1032010)LS1$75,000$40,000$150,000$152,600
0030Railroad insurance and flagging CSX (1071403)LS1$25,000$15,000$45,000$25,000
0040Borrow excavation (2033000)CY3,153.60$85.40$60.00$44.50$95.00
0050Excavation for shoulder paving (2036000)STA384.17$39.75$82.00$39.35$85.00
0060Hauling of excavated shoulder material (2072000)STA384.17$63.00$12.00$81.45$86.00
0070Additional rock for full depth reclamation (3059001)TON260$67.90$55.00$113.50$134.00
0080Maintenance stone (3059900)TON36.50$80.00$100.00$145.00$124.00
0090Cement modified recycled base (12" unif)-curing method B (3063242)SY180,406.20$6.85$6.50$7.10$7.30
0100Portland cement for cement modified recycled base course (3064000)TON5,593.32$185.00$245.00$225.00$219.00
0110HMA shoulder widening course (3104000)TON2,676.96$72.90$66.00$84.95$88.90
0120Liquid asphalt binder PG64-22 (4011004)TON1,539.90$600.00$575.00$585.00$665.00
0130Aramid fiber (4011500)LB1,501.54$45.00$65.00$67.00$55.00
0140Full depth asph. pav. patching 8" unif (4012080)SY3,650$71.00$75.00$70.20$79.00
0150Milling existing asphalt pavement (variable) (4013990)SY1,700$15.00$20.00$37.25$28.00
0160Asphalt intermediate course type B (4030320)TON503.36$79.30$100.00$94.60$121.00
0170Asphalt surface course type B (4040320)TON19,991.44$74.15$82.75$97.45$98.00
0180Asphalt surface course type C (4040340)TON3,158.47$72.35$82.75$95.15$91.00
0190Asphalt surface course type D (4040350)TON230$105.55$100.00$152.50$156.00
0200Driveway paving-surface type D (4047230)TON1,006.25$200.00$135.00$220.00$234.00
0210Traffic control (6011000)LS1$440,000$475,000$357,420$698,915
0220Permanent construction signs (ground mounted) (6051120)SF1,925$5.85$5.60$5.60$6.95
02304" white broken lines -(gaps excluded)-fast dry paint (6240005)LF1,335$0.10$0.10$0.10$0.12
02404" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF486,987$0.10$0.10$0.10$0.12
025024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF1,320$1.25$1.25$1.25$1.18
0260Railroad crossing symbols - fast dry paint (6240045)EACH6$0.01$0.01$0.01$5.25
02704" yellow broken lines(gaps exc) - fast dry paint (6240105)LF35,010$0.10$0.10$0.10$0.12
02804"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF230,085$0.10$0.10$0.10$0.12
02904" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005)LF445$0.42$0.42$0.42$0.60
03004" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF162,329$0.40$0.40$0.40$0.42
031024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF440$10.00$10.00$10.00$10.30
0320Railroad crossing symbols - thermoplastic - 125 mil. (6271045)EACH2$700.00$700.00$700.00$650.00
03304" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064)LF11,670$0.42$0.42$0.42$0.42
03404" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074)LF76,695$0.40$0.40$0.40$0.42
0350Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH1,040$4.00$4.00$4.00$5.15
0360Milled-in rumble strip (6321000)MI30.74$500.00$500.00$500.00$555.00
0370Premash reset W-beam strong post system (8051900)LF120$31.78$31.78$31.78$32.00
0380Premash reset type T TL3 leading 50' (8052420)EACH4$1,410.00$1,409.60$1,409.60$1,400.00
0390Permanent grassing for non-permitted resurfacing projects (8100102)ACRE10.01$4,255.00$3,500.00$3,500.00$3,500.00
SCDOT contract 2273500: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy