TDOT contract CN261030 bid tabulation
The tunnel cleaning on the henley street connector tunnel on s.r. 1 and the smartfix tunnel on s.r. 158 (james white parkway). Let by Tennessee DOT on May 8, 2026, Knox County. 1 bid received; low bid $179,905 by Diamond Specialized, Inc..
- Owner
- Tennessee DOT
- Letting
- 08 MAY 2026
- Pay items
- 6
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Diamond Specialized, Inc. | $179,905 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Diamond Specialized, Inc. |
|---|---|---|---|---|
| 1 | Maintenance of traffic (smartfix I-40 ramp) (712-01.56) | EACH | 12 | $2,265.00 |
| 2 | Maintenance of traffic (henley street tunnels) (712-01.60) | EACH | 12 | $2,350.00 |
| 3 | Graffiti removal (713-20.40) | SF | 250 | $6.00 |
| 4 | Mobilization (717-01) | LS | 1 | $10,945 |
| 5 | Tunnel cleaning (henley street tunnels) (760-01.04) | EACH | 12 | $4,840.00 |
| 6 | Tunnel cleaning (smartfix I-40 ramp) (760-01.07) | EACH | 12 | $4,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of May 8, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.