TDOT contract CN262057 bid tabulation
R2bvar-m3-069 the on-call cable barrier repair on various interstate and state routes. Let by Tennessee DOT on August 14, 2026, Counties Bradley, Coffee, Cumberland, Grundy, Hamilton, Marion, Mcminn, Putnam, And Sequatchie. 4 bids received; low bid $475,510 by Mountain Home Construction LLC.
- Owner
- Tennessee DOT
- Letting
- 14 AUG 2026
- Pay items
- 25
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mountain Home Construction LLC | $475,510 | Low |
| 2 | Superior Traffic Control, LLC | $558,410 | +17% |
| 3 | Lu, Inc. | $580,869 | +22% |
| 4 | Reynolds Fence and Guardrail, Inc. | $646,390 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mountain Home Construction LLC | 2. Superior Traffic Control, LLC | 3. Lu, Inc. | 4. Reynolds Fence and Guardrail, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Cable barrier (MASH TL-3) (705-06.40) | LF | 100 | $1.00 | $10.00 | $9.17 | $11.00 |
| 2 | Cable barrier anchor (MASH TL-3) (705-06.41) | EACH | 2 | $300.00 | $1,400.00 | $1,091.48 | $1,345.00 |
| 3 | Longitudinal cable barrier (705-80.01) | LF | 460 | $8.00 | $10.00 | $6.55 | $17.00 |
| 4 | Longitudinal cable barrier (end terminal) TL-3 (705-80.03) | EACH | 2 | $500.00 | $1,200.00 | $652.84 | $2,700.00 |
| 5 | Socketed line post W/all accessories (705-80.04) | EACH | 1,940 | $205.50 | $230.00 | $227.71 | $225.00 |
| 6 | Terminal post W/all accessories (705-80.06) | EACH | 70 | $200.00 | $250.00 | $225.40 | $275.00 |
| 7 | Cable release post (top) W/all accessories (705-80.07) | EACH | 10 | $190.00 | $150.00 | $84.72 | $700.00 |
| 8 | Line post W/FTNG & all acc. (705-80.10) | EACH | 20 | $200.00 | $150.00 | $143.44 | $150.00 |
| 9 | Check cable tension (705-80.12) | LS | 1 | $2,500.00 | $5,000.00 | $7,338.24 | $9,500.00 |
| 10 | End terminal hardware for attaching single cable (705-80.14) | EACH | 10 | $25.00 | $55.00 | $44.50 | $380.00 |
| 11 | Retensioning cable barrier section after repair (705-80.15) | EACH | 60 | $17.00 | $50.00 | $30.85 | $40.00 |
| 12 | Longitudinal cable barrier training (705-80.17) | EACH | 1 | $50.00 | $200.00 | $141.19 | $170.00 |
| 13 | Hardware for attaching all cables to A single post (705-80.19) | EACH | 410 | $67.00 | $81.00 | $83.22 | $110.00 |
| 14 | Longitudinal cable barrier splice (torpedo, turnbuckle) (705-80.20) | EACH | 50 | $125.00 | $200.00 | $31.96 | $380.00 |
| 15 | Longitudinal cable barrier cable (705-80.21) | LF | 500 | $4.00 | $6.00 | $2.24 | $3.00 |
| 16 | Terminal post W/footing and all accessories (705-80.22) | EACH | 5 | $75.00 | $100.00 | $58.21 | $90.00 |
| 17 | Longitudinal cable barrier (end terminal) TL-4 (705-80.23) | EACH | 1 | $850.00 | $3,000.00 | $1,746.36 | $2,650.00 |
| 18 | Concrete monolithic block for cable end terminal foundation (705-80.24) | EACH | 1 | $200.00 | $3,000.00 | $343.45 | $450.00 |
| 19 | Self tapping screw (cable barrier) (705-80.25) | EACH | 150 | $0.10 | $10.00 | $0.99 | $10.00 |
| 20 | Cable barrier terminal (removal) (706-80.18) | EACH | 2 | $2.50 | $100.00 | $43.66 | $55.00 |
| 21 | Cable barrier (removal) (706-80.19) | LF | 500 | $1.00 | $10.00 | $116.42 | $2.00 |
| 22 | Lane closure (712-01.02) | EACH | 5 | $2.50 | $500.00 | $4.35 | $150.00 |
| 23 | Lane closure(night work) (712-01.03) | EACH | 5 | $2.50 | $500.00 | $291.06 | $450.00 |
| 24 | Truck mounted attenuator W/mssage board (712-08.20) | DAY | 5 | $2,000.00 | $850.00 | $481.62 | $600.00 |
| 25 | Mobilization (per call-out) (717-01.03) | EACH | 20 | $2.50 | $100.00 | $43.66 | $3,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 14, 2026. Compiled by Mirage Metrics.