TDOT contract CNZ143 bid tabulation

Stp-reg2(238),r2svar-f8-064 the crack sealing at various locations on various state routes. Let by Tennessee DOT on May 9, 2025, Counties Bledsoe, Cannon, Clay, Cumberland, Hamilton, Marion, Overton, Putnam, Rhea, Warren, And White. 4 bids received; low bid $738,044 by Reynolds Sealing & Striping, Inc..

Owner
Tennessee DOT
Letting
09 MAY 2025
Pay items
3
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Reynolds Sealing & Striping, Inc.$738,044Low
2Scodeller Construction, Inc.$1,038,570+41%
3Pavement Restorations, Inc.$1,083,483+47%
4Gordon Company, Inc.$1,445,088+96%
TDOT contract CNZ143: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Reynolds Sealing & Striping, Inc.2. Scodeller Construction, Inc.3. Pavement Restorations, Inc.4. Gordon Company, Inc.
1Crack sealant (411-04)LB358,772$1.43$2.63$2.05$4.00
2Traffic control (712-01)LS1$150,000$45,000$188,000$5,000.00
3Mobilization (717-01)LS1$75,000$50,000$160,000$5,000.00
TDOT contract CNZ143: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy