TDOT contract CNZ169 bid tabulation
The construction of a 40' x 80' tdot maintenance building at 1248 b manufacturers row in trenton. Let by Tennessee DOT on June 27, 2025, Gibson County. 3 bids received; low bid $820,000 by Mountain Home Construction LLC.
- Owner
- Tennessee DOT
- Letting
- 27 JUN 2025
- Pay items
- 4
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mountain Home Construction LLC | $820,000 | Low |
| 2 | Graves & Graves Construction Company, Inc. | $996,327 | +22% |
| 3 | H & H Construction, Inc. | $1,031,239 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mountain Home Construction LLC | 2. Graves & Graves Construction Company, Inc. | 3. H & H Construction, Inc. |
|---|---|---|---|---|---|---|
| 1 | Site preparation (607-65.20) | EACH | 1 | $215,000 | $216,500 | $269,411 |
| 2 | Building (foundation and structure) (680-02.01) | EACH | 1 | $318,000 | $421,827 | $372,277 |
| 3 | Building (interior construction) (680-02.02) | EACH | 1 | $215,000 | $308,200 | $337,989 |
| 4 | Mobilization (717-01) | LS | 1 | $72,000 | $49,800 | $51,562 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.