TDOT contract CNZ205 bid tabulation
The on-call cable barrier repair on various interstate and state routes. Let by Tennessee DOT on August 15, 2025, Counties Bradley, Coffee, Cumberland, Grundy, Hamilton, Marion, Putnam, And Sequatchie. 2 bids received; low bid $494,743 by Lu, Inc..
- Owner
- Tennessee DOT
- Letting
- 15 AUG 2025
- Pay items
- 23
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lu, Inc. | $494,743 | Low |
| 2 | Reynolds Fence and Guardrail, Inc. | $802,550 | +62% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lu, Inc. | 2. Reynolds Fence and Guardrail, Inc. |
|---|---|---|---|---|---|
| 1 | Cable barrier (MASH TL-3) (705-06.40) | LF | 100 | $10.91 | $17.00 |
| 2 | Cable barrier anchor (MASH TL-3) (705-06.41) | EACH | 2 | $1,299.38 | $2,100.00 |
| 3 | Longitudinal cable barrier (705-80.01) | LF | 375 | $7.80 | $20.00 |
| 4 | Longitudinal cable barrier (end terminal) TL-3 (705-80.03) | EACH | 2 | $777.20 | $3,500.00 |
| 5 | Socketed line post W/all accessories (705-80.04) | EACH | 1,940 | $215.12 | $310.00 |
| 6 | Terminal post W/all accessories (705-80.06) | EACH | 65 | $212.94 | $450.00 |
| 7 | Cable release post (top) W/all accessories (705-80.07) | EACH | 10 | $100.85 | $320.00 |
| 8 | Line post W/FTNG & all acc. (705-80.10) | EACH | 10 | $135.51 | $550.00 |
| 9 | Check cable tension (705-80.12) | LS | 1 | $8,736.00 | $3,000.00 |
| 10 | End terminal hardware for attaching single cable (705-80.14) | EACH | 10 | $52.97 | $80.00 |
| 11 | Retensioning cable barrier section after repair (705-80.15) | EACH | 60 | $36.73 | $150.00 |
| 12 | Longitudinal cable barrier training (705-80.17) | EACH | 1 | $168.09 | $500.00 |
| 13 | Hardware for attaching all cables to A single post (705-80.19) | EACH | 375 | $78.62 | $80.00 |
| 14 | Longitudinal cable barrier splice (torpedo, turnbuckle) (705-80.20) | EACH | 50 | $38.05 | $200.00 |
| 15 | Longitudinal cable barrier cable (705-80.21) | LF | 500 | $2.67 | $17.00 |
| 16 | Terminal post W/footing and all accessories (705-80.22) | EACH | 5 | $69.30 | $400.00 |
| 17 | Longitudinal cable barrier (end terminal) TL-4 (705-80.23) | EACH | 1 | $2,079.00 | $3,500.00 |
| 18 | Concrete monolithic block for cable end terminal foundation (705-80.24) | EACH | 1 | $408.87 | $1,500.00 |
| 19 | Cable barrier terminal (removal) (706-80.18) | EACH | 2 | $51.98 | $375.00 |
| 20 | Lane closure (712-01.02) | EACH | 5 | $138.60 | $1,100.00 |
| 21 | Lane closure(night work) (712-01.03) | EACH | 5 | $346.50 | $1,200.00 |
| 22 | Truck mounted attenuator W/mssage board (712-08.20) | DAY | 5 | $455.00 | $350.00 |
| 23 | Mobilization (per call-out) (717-01.03) | EACH | 20 | $51.98 | $3,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.