TxDOT contract A00187100 bid tabulation

Preventive Maintenance, Various (BROWNWOOD AREA to .). Let by Texas DOT on January 7, 2026, Brown, Brownwood District. 6 bids received; low bid $1,851,159 by D. I. J. Construction, Inc., -20% against the engineer's estimate of $2,313,757.

Owner
Texas DOT
Letting
07 JAN 2026
Pay items
26
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1D. I. J. Construction, Inc.$1,851,159Low-20%
2Stripe-A-Zone, LLC$1,857,3810.0%-20%
3L&L Company$1,877,652+1.0%-19%
4Centerline Technologies, LLC$2,189,164+18%-5.0%
5TRP Infrastructure Services, LLC$2,218,312+20%-4.0%
6Grey Sky Construction LLC$2,367,337+28%+2.0%
TxDOT contract A00187100: bids by rank

Engineer's estimate: $2,313,757.

Bid tabulation

LinePay itemUnitQuantityEstimate1. D. I. J. Construction, Inc.2. Stripe-A-Zone, LLC3. L&L Company4. Centerline Technologies, LLC5. TRP Infrastructure Services, LLC6. Grey Sky Construction LLC
1Asphalt (RC-250) (316-7016)GAL5,015$5.00$3.25$3.25$6.00$6.50$12.00$6.00
2Aggregate (type-B, GR-5)(sac-B) (316-7175)CY206$110.00$40.00$50.00$50.00$150.00$211.00$250.00
3Mobilization (500-7001)LS1$203,500$14,000$50,000$1.00$18,000$25,000$50,000
4Barricades, signs and traffic handling (502-7001)MO7$10,000$100.00$250.00$1.00$1.00$6,900.00$8,500.00
5TMA (mobile operation) (505-7003)DAY232$135.00$1.00$1.00$1.00$1.00$1.00$55.00
6Mill rumble strips (asphalt) (shoulder) (533-7001)LF1,010,084$0.14$0.13$0.13$0.15$0.09$0.15$0.17
7Mill rumble strips (asphalt) (centerline) (533-7002)LF979,952$0.14$0.16$0.16$0.15$0.29$0.23$0.17
8Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH15,002$0.65$0.50$0.01$0.02$0.50$0.90$3.00
9Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF3,454$1.00$1.00$0.80$0.80$0.80$1.70$2.00
10Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF11,435$0.95$0.55$0.70$0.80$0.80$0.79$2.00
11Pavement sler 6" (666-7347)LF2,260$0.35$1.00$0.20$0.20$0.50$0.16$1.00
12Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF58,562$0.46$0.39$0.40$0.40$0.45$0.50$0.45
13Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF1,497,955$0.43$0.38$0.37$0.39$0.45$0.43$0.45
14Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF151,801$0.47$0.39$0.40$0.40$0.45$0.49$0.45
15Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF1,554,577$0.43$0.38$0.39$0.39$0.45$0.43$0.45
16Prefabricated PM type C (W)(24")(solid) (668-7089)LF3,341$12.00$11.35$9.00$10.00$12.00$9.60$10.00
17Prefabricated PM type C (W)(arrow) (668-7091)EACH50$200.00$200.00$200.00$200.00$190.00$186.00$250.00
18Prefabricated PM type C (W)(LN reduct arrow) (668-7100)EACH42$465.00$700.00$375.00$500.00$350.00$363.00$500.00
19Prefabricated PM type C (W)(word) (668-7103)EACH60$253.00$250.00$240.00$280.00$200.00$268.00$250.00
20Prefabricated PM type C (W)(RR crossing) (668-7108)EACH9$590.00$750.00$425.00$500.00$650.00$759.00$700.00
21Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH14$60.00$55.00$75.00$40.00$28.00$64.00$150.00
22Prefabricated PM type C (Y)(24")(solid) (668-7127)LF2,679$13.00$9.50$9.00$12.00$12.00$9.60$20.00
23Reflectorized pavement marker type II-A-A (672-7004)EACH32,579$3.60$4.00$4.00$4.00$4.00$3.40$4.00
24Reflectorized pavement marker type II-C-C (672-7005)EACH277$4.50$5.00$4.25$4.00$4.00$3.40$4.00
25Eliminating existing PM & markers (6") (677-7002)LF2,260$0.73$1.50$1.50$0.60$1.00$0.50$1.00
26Pavement surface preparation for marking (6") (678-7002)LF2,260$0.40$0.75$0.25$0.01$0.01$0.10$1.00
TxDOT contract A00187100: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of January 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy