TxDOT contract A00193907 bid tabulation
Hazard Elimination & Safety, IH 610 (IH 10(W) to IH 10(E)). Let by Texas DOT on September 5, 2025, Harris, Houston District. 7 bids received; low bid $9,515,227 by Sice, Inc., -5.0% against the engineer's estimate of $10,013,612.
- Owner
- Texas DOT
- Letting
- 05 SEP 2025
- Pay items
- 76
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Sice, Inc. | $9,515,227 | Low | -5.0% |
| 2 | Traf-Tex, Inc. | $9,989,980 | +5.0% | 0.0% |
| 3 | Third Coast Services LLC | $10,516,295 | +11% | +5.0% |
| 4 | Highway Intelligent Traffic Solutions, Inc. | $11,209,946 | +18% | +12% |
| 5 | Florida Traffic Control Devices, Inc. | $12,288,650 | +29% | +23% |
| 6 | Select Maintenance, L.L.C. | $13,746,699 | +44% | +37% |
| 7 | Allstate Signal & Construction, LLC | $15,978,764 | +68% | +60% |
Engineer's estimate: $10,013,612.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Sice, Inc. | 2. Traf-Tex, Inc. | 3. Third Coast Services LLC | 4. Highway Intelligent Traffic Solutions, Inc. | 5. Florida Traffic Control Devices, Inc. | 6. Select Maintenance, L.L.C. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 1.25 | $13,000 | $6,055.95 | $8,738.00 | $9,265.67 | $14,305 | $1,332.00 | $100,000 |
| 2 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 77 | $40.00 | $607.87 | $152.00 | $210.58 | $61.50 | $94.00 | $150.00 |
| 3 | Block sodding (162-7002) | SY | 4,500 | $10.00 | $5.63 | $5.80 | $19.16 | $11.21 | $5.65 | $15.00 |
| 4 | Drilled shaft (high mast pole) (66 in) (416-7038) | LF | 1,611 | $1,200.00 | $997.12 | $900.00 | $772.04 | $1,173.94 | $1,119.00 | $850.00 |
| 5 | Riprap (concrete)(4 in) (432-7001) | CY | 165.36 | $1,100.00 | $982.17 | $1,549.00 | $784.53 | $799.50 | $1,110.00 | $1,225.00 |
| 6 | Mobilization (500-7001) | LS | 1 | $476,839 | $478,809 | $548,505 | $1,051,629 | $770,705 | $800,000 | $1,300,000 |
| 7 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $750.00 | $18,920 | $5,000.00 | $16,528 | $84,451 | $134,000 | $80,000 |
| 8 | TMA (stationary) (505-7001) | DAY | 340 | $400.00 | $363.99 | $248.00 | $503.15 | $206.86 | $160.00 | $350.00 |
| 9 | Concrete sidewalks (5") (531-7002) | SY | 87 | $100.00 | $652.20 | $136.00 | $286.80 | $123.00 | $221.00 | $350.00 |
| 10 | HI MST IL pole (175 FT)(100 MPH) (613-7008) | EACH | 33 | $68,000 | $69,346 | $66,620 | $65,058 | $67,823 | $73,370 | $100,000 |
| 11 | LED HI MST IL asm (6 fixt) (type B) (614-7003) | EACH | 25 | $29,670 | $36,115 | $40,660 | $36,422 | $40,278 | $40,790 | $50,000 |
| 12 | LED HI MST IL asm(6 fixt) (type B)SHLD (614-7010) | EACH | 8 | $36,993 | $40,723 | $36,648 | $40,345 | $41,000 | $50,000 | |
| 13 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 4,510 | $15.25 | $11.19 | $11.20 | $10.42 | $22.24 | $15.00 | $25.00 |
| 14 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 865 | $18.18 | $14.65 | $20.35 | $11.96 | $45.17 | $18.15 | $25.00 |
| 15 | Conduit (RM) (1") (618-7072) | LF | 155 | $36.19 | $16.50 | $25.92 | $38.19 | $22.20 | $35.00 | |
| 16 | Conduit (prepare) (618-7090) | LF | 100 | $4.41 | $3.55 | $3.49 | $38.12 | $4.35 | $10.00 | |
| 17 | Electrical conductor (no.8) bare (620-7007) | LF | 5,760 | $2.30 | $1.53 | $1.51 | $1.65 | $3.12 | $1.40 | $2.00 |
| 18 | Electrical conductor (no.8) insulated (620-7008) | LF | 11,495 | $2.20 | $1.73 | $1.83 | $1.89 | $3.43 | $1.80 | $2.50 |
| 19 | Ground box type A (122311) (624-7001) | EACH | 53 | $1,100.00 | $996.77 | $1,029.00 | $737.69 | $1,795.82 | $707.00 | $2,000.00 |
| 20 | Ground box type A (122311)W/apron (624-7002) | EACH | 14 | $1,190.00 | $1,056.74 | $1,076.00 | $970.27 | $2,003.15 | $1,344.00 | $3,500.00 |
| 21 | Remove ground box (624-7013) | EACH | 30 | $276.78 | $222.00 | $289.55 | $423.66 | $319.00 | $250.00 | |
| 22 | Replace of ground boxes (690-7007) | EACH | 2 | $1,200.00 | $1,333.86 | $2,434.00 | $797.48 | $2,404.13 | $956.00 | $5,000.00 |
| 23 | Replace of electrical service (690-7019) | EACH | 11 | $1,500.00 | $6,215.20 | $8,460.00 | $8,288.20 | $8,305.87 | $6,320.00 | $7,500.00 |
| 24 | Remove above-ground conduit (690-7144) | LF | 155 | $7.68 | $20.00 | $7.89 | $16.04 | $12.50 | $10.00 | |
| 25 | Replace above-ground conduit (690-7145) | LF | 1,551 | $16.00 | $32.02 | $29.00 | $15.45 | $38.83 | $28.90 | $15.00 |
| 26 | Replace underground conduit (690-7148) | LF | 3,100 | $7.00 | $12.79 | $9.40 | $11.22 | $23.06 | $8.35 | $15.00 |
| 27 | Remove conductor (690-7150) | LF | 3,315 | $0.38 | $0.90 | $0.61 | $4.32 | $1.65 | $1.50 | |
| 28 | Replace conductor (690-7151) | LF | 4,651 | $1.35 | $1.40 | $2.16 | $3.15 | $4.32 | $2.25 | $3.00 |
| 29 | Install electrical splice (690-7157) | EACH | 34 | $54.00 | $54.02 | $43.00 | $64.50 | $114.60 | $130.00 | $100.00 |
| 30 | Remove underpass luminaire (HPS) (690-7168) | EACH | 810 | $100.00 | $92.07 | $36.00 | $24.47 | $63.83 | $100.00 | $75.00 |
| 31 | Install underpass luminaire (LED) (690-7170) | EACH | 806 | $300.00 | $349.36 | $529.00 | $852.03 | $312.65 | $590.00 | $600.00 |
| 32 | Replace underpass luminaire (LED) (690-7172) | EACH | 516 | $310.00 | $463.11 | $534.00 | $495.88 | $338.55 | $663.00 | $600.00 |
| 33 | Remove induction fluorescent fixture (690-7174) | EACH | 66 | $105.00 | $120.77 | $37.00 | $6.99 | $65.35 | $190.00 | $200.00 |
| 34 | Remove luminaire fixture (HPS) (690-7177) | EACH | 1,415 | $855.00 | $30.45 | $37.00 | $25.50 | $68.33 | $200.00 | $60.00 |
| 35 | Replace steel service pole (690-7192) | EACH | 11 | $500.00 | $3,787.84 | $1,777.00 | $1,554.18 | $2,476.63 | $2,355.00 | $4,500.00 |
| 36 | Replace hand hole cover (690-7199) | EACH | 40 | $107.00 | $464.03 | $282.00 | $222.14 | $420.83 | $318.00 | $250.00 |
| 37 | Install ground rod (690-7200) | EACH | 20 | $122.00 | $62.87 | $105.00 | $43.48 | $80.12 | $106.00 | $125.00 |
| 38 | Replace fused disconnect (690-7204) | EACH | 11 | $438.00 | $637.26 | $518.00 | $531.56 | $615.00 | $565.00 | $725.00 |
| 39 | Replace wall pack luminaire (690-7212) | EACH | 13 | $405.34 | $718.00 | $495.89 | $492.00 | $705.00 | $550.00 | |
| 40 | Replace starting aid (690-7221) | EACH | 11 | $5.00 | $371.13 | $388.00 | $17.80 | $239.85 | $281.00 | $375.00 |
| 41 | Replace photocell and bracket (690-7222) | EACH | 11 | $104.00 | $171.66 | $104.00 | $66.84 | $79.95 | $255.00 | $250.00 |
| 42 | Replace control trans (high mast) (690-7223) | EACH | 26 | $434.00 | $793.84 | $340.00 | $654.18 | $246.00 | $838.00 | $750.00 |
| 43 | Replace control trans (elect service) (690-7224) | EACH | 26 | $319.00 | $465.55 | $280.00 | $356.42 | $184.50 | $1,065.00 | $450.00 |
| 44 | Replace control circuit (high mast) (690-7225) | EACH | 26 | $113.00 | $735.56 | $700.00 | $64.50 | $615.00 | $194.00 | $375.00 |
| 45 | Replace control circuit (elect service) (690-7226) | EACH | 26 | $69.00 | $582.10 | $400.00 | $181.27 | $307.50 | $194.00 | $275.00 |
| 46 | Replace hand-off-auto switch (690-7229) | EACH | 34 | $94.00 | $235.32 | $268.00 | $64.50 | $116.85 | $519.00 | $325.00 |
| 47 | Replace contactor (690-7230) | EACH | 34 | $174.00 | $386.51 | $360.00 | $356.42 | $307.50 | $442.00 | $550.00 |
| 48 | Replace meter base (690-7231) | EACH | 20 | $50.00 | $400.88 | $780.00 | $260.74 | $369.00 | $860.00 | $150.00 |
| 49 | Replace time clock (690-7232) | EACH | 51 | $25.00 | $123.32 | $155.00 | $257.17 | $79.95 | $540.00 | $175.00 |
| 50 | Replace breaker panel (690-7233) | EACH | 26 | $88.00 | $442.04 | $714.00 | $289.85 | $325.95 | $1,190.00 | $3,500.00 |
| 51 | Replace circuit breaker (690-7235) | EACH | 80 | $84.00 | $131.25 | $155.00 | $134.57 | $79.95 | $224.00 | $200.00 |
| 52 | Replace flex power cable or cord (690-7236) | LF | 9,300 | $11.00 | $3.36 | $7.50 | $4.14 | $11.07 | $4.85 | $8.00 |
| 53 | Replace twist lock connector (690-7237) | EACH | 34 | $137.00 | $334.21 | $324.00 | $175.43 | $202.95 | $362.00 | $300.00 |
| 54 | Replace safety lanyard (690-7238) | LF | 126 | $135.00 | $591.07 | $37.00 | $16.05 | $553.50 | $252.00 | $150.00 |
| 55 | Raise and lower ring (high mast light) (690-7239) | EACH | 208 | $135.00 | $338.52 | $288.00 | $611.91 | $392.25 | $400.00 | $350.00 |
| 56 | RE-strap existing conduit (690-7240) | EACH | 51 | $44.00 | $114.38 | $8.40 | $17.80 | $64.13 | $55.00 | $10.00 |
| 57 | Replace nuts, washers & other hardware (690-7241) | EACH | 288 | $22.00 | $69.16 | $30.00 | $260.98 | $153.89 | $450.00 | $150.00 |
| 58 | Troubleshoot for repairs (690-7242) | HR | 611 | $70.00 | $87.22 | $250.00 | $815.87 | $147.64 | $145.00 | $165.00 |
| 59 | Replace safety switch (690-7251) | EACH | 31 | $245.00 | $1,005.90 | $821.00 | $418.30 | $547.52 | $992.00 | $700.00 |
| 60 | Replace 5/16" wire rope (690-7279) | EACH | 16 | $1,600.00 | $5,265.88 | $3,010.00 | $4,900.47 | $2,123.26 | $5,040.00 | $5,500.00 |
| 61 | Replace 3/8" wire rope (690-7280) | EACH | 16 | $2,330.00 | $2,451.19 | $2,868.00 | $2,080.56 | $2,562.78 | $2,235.00 | $3,000.00 |
| 62 | Replace high mast winch (690-7281) | EACH | 31 | $2,060.00 | $2,954.69 | $4,350.00 | $2,468.73 | $3,170.40 | $2,738.00 | $4,000.00 |
| 63 | Replace wire rope pulley (690-7282) | EACH | 31 | $344.00 | $1,539.77 | $997.00 | $785.76 | $413.22 | $1,015.00 | $1,000.00 |
| 64 | Replace electrical cable pulley (690-7283) | EACH | 31 | $500.00 | $2,070.07 | $723.00 | $518.36 | $763.12 | $750.00 | $625.00 |
| 65 | Replace access hole cover (690-7285) | EACH | 28 | $147.00 | $423.81 | $360.00 | $227.98 | $104.55 | $300.00 | $300.00 |
| 66 | Replace high mast springs (690-7286) | EACH | 31 | $85.00 | $444.13 | $218.00 | $202.29 | $234.93 | $292.00 | $300.00 |
| 67 | Remove/reinstl HI mast pole for repair (690-7287) | EACH | 16 | $4,150.00 | $9,186.27 | $9,383.00 | $6,630.99 | $9,230.51 | $12,500 | $8,500.00 |
| 68 | Repl aluminum cable strap (690-7289) | EACH | 166 | $11.00 | $26.04 | $191.00 | $1.78 | $64.13 | $20.00 | $10.00 |
| 69 | Replace high mast luminaires (LED) (690-7292) | EACH | 524 | $850.00 | $767.76 | $985.00 | $1,065.31 | $1,032.06 | $1,080.00 | $1,500.00 |
| 70 | Install high mast fixture (LED) (690-7293) | EACH | 730 | $820.00 | $781.29 | $985.00 | $1,065.31 | $1,030.10 | $1,055.00 | $1,500.00 |
| 71 | LED shields for high mast fixtures (690-7297) | EACH | 396 | $160.00 | $161.23 | $145.00 | $200.64 | $224.34 | $280.00 | $200.00 |
| 72 | Replace aviation warning fixture (LED) (690-7299) | EACH | 624 | $325.00 | $371.99 | $455.00 | $412.97 | $565.92 | $570.00 | $450.00 |
| 73 | Remove LED shields (690-7300) | EACH | 60 | $11.00 | $68.50 | $28.00 | $6.12 | $22.57 | $97.00 | $75.00 |
| 74 | Remove HPS shields (690-7301) | EACH | 60 | $11.00 | $99.33 | $26.00 | $6.12 | $22.57 | $97.00 | $75.00 |
| 75 | Install circuit breaker (690-7304) | EACH | 1 | $750.12 | $345.00 | $268.86 | $1,369.19 | $254.75 | $1,500.00 | |
| 76 | Remove high mast lighting assembly (6019-7001) | EACH | 42 | $4,000.00 | $2,653.42 | $7,018.00 | $1,980.39 | $5,734.36 | $4,375.00 | $4,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.