TxDOT contract A00196614 bid tabulation
Hazard Elimination & Safety, Various (DISTRICT WIDE to .). Let by Texas DOT on June 2, 2026, Jefferson, Beaumont District. 6 bids received; low bid $5,188,815 by Interstate Barricades & Markings, Inc., -23% against the engineer's estimate of $6,716,109.
- Owner
- Texas DOT
- Letting
- 02 JUN 2026
- Pay items
- 54
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Interstate Barricades & Markings, Inc. | $5,188,815 | Low | -23% |
| 2 | Stripe-A-Zone, LLC | $5,346,648 | +3.0% | -20% |
| 3 | TRP Infrastructure Services, LLC | $5,662,517 | +9.0% | -16% |
| 4 | Stripe Lines, Inc. | $6,134,408 | +18% | -9.0% |
| 5 | Centerline Technologies, LLC | $7,437,787 | +43% | +11% |
| 6 | Batterson, LLP | $7,781,056 | +50% | +16% |
Engineer's estimate: $6,716,109.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Interstate Barricades & Markings, Inc. | 2. Stripe-A-Zone, LLC | 3. TRP Infrastructure Services, LLC | 4. Stripe Lines, Inc. | 5. Centerline Technologies, LLC | 6. Batterson, LLP |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (500-7001) | LS | 1 | $430,000 | $35,000 | $30,000 | $95,000 | $25,000 | $10,000 | $225,000 |
| 2 | Barricades, signs and traffic handling (502-7001) | MO | 11 | $5,000.00 | $1.00 | $1,000.00 | $500.00 | $2,500.00 | $1.00 | $5,500.00 |
| 3 | TMA (stationary) (505-7001) | DAY | 91 | $250.00 | $1.00 | $1.00 | $1,000.00 | $150.00 | $1.00 | $500.00 |
| 4 | TMA (mobile operation) (505-7003) | DAY | 403 | $300.00 | $1.00 | $1.00 | $1.00 | $35.00 | $1.00 | $250.00 |
| 5 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 90,004 | $0.20 | $0.18 | $0.18 | $0.25 | $0.25 | $1.00 | |
| 6 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 45,152 | $0.20 | $0.18 | $0.20 | $0.30 | $0.25 | $1.00 | |
| 7 | Reflectorized pavement marking type I (W)6"(DOT)(090MIL) (666-7008) | LF | 5,160 | $1.07 | $1.00 | $1.00 | $1.40 | $0.57 | $0.88 | $1.00 |
| 8 | Reflectorized pavement marking type I (W)8"(DOT)(090MIL) (666-7017) | LF | 1,920 | $1.17 | $1.50 | $1.50 | $1.55 | $0.71 | $0.88 | $1.25 |
| 9 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 110,903 | $1.00 | $0.95 | $0.73 | $0.73 | $0.71 | $0.88 | $0.89 |
| 10 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 6,094 | $1.70 | $1.50 | $2.75 | $3.40 | $2.08 | $3.00 | $3.00 |
| 11 | RE PV marking type I(black)6"(shadow)(090MIL) (666-7137) | LF | 198,150 | $0.60 | $0.65 | $0.70 | $0.48 | $0.50 | $0.65 | $0.95 |
| 12 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 1,060,026 | $0.65 | $0.66 | $0.80 | $0.68 | $0.74 | $0.88 | |
| 13 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 497,399 | $0.65 | $0.67 | $0.80 | $0.68 | $0.74 | $0.88 | |
| 14 | Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273) | LF | 107,710 | $0.65 | $0.69 | $0.80 | $0.68 | $0.74 | $0.88 | |
| 15 | Pavement sler 6" (666-7347) | LF | 2,767,660 | $0.11 | $0.08 | $0.12 | $0.10 | $0.21 | $0.25 | $0.20 |
| 16 | Pavement sler 8" (666-7348) | LF | 79,577 | $0.25 | $0.13 | $0.15 | $0.24 | $0.30 | $0.30 | $0.30 |
| 17 | Pavement sler 12" (666-7350) | LF | 6,094 | $0.60 | $0.20 | $0.75 | $0.70 | $0.46 | $0.45 | $0.50 |
| 18 | Pavement sler 24" (666-7352) | LF | 16,371 | $0.40 | $0.40 | $0.50 | $1.25 | $0.80 | $1.00 | $1.00 |
| 19 | Pavement sler (arrow) (666-7353) | EACH | 854 | $3.50 | $5.00 | $15.00 | $24.00 | $10.00 | $75.00 | $25.00 |
| 20 | Pavement sler (word) (666-7354) | EACH | 250 | $5.20 | $7.00 | $15.00 | $29.00 | $10.00 | $75.00 | $25.00 |
| 21 | Pavement sler (double arrow) (666-7356) | EACH | 65 | $35.00 | $10.00 | $15.00 | $34.00 | $10.00 | $75.00 | $30.00 |
| 22 | Pavement sler (uturn arrow) (666-7358) | EACH | 26 | $30.00 | $10.00 | $15.00 | $35.00 | $10.00 | $75.00 | $40.00 |
| 23 | Pavement sler (yld tri) (666-7365) | EACH | 1,185 | $7.50 | $1.00 | $5.00 | $10.00 | $10.00 | $10.00 | $5.00 |
| 24 | Pavement sler (bike arrow) (666-7368) | EACH | 2 | $26.00 | $1.00 | $15.00 | $24.00 | $10.00 | $75.00 | $100.00 |
| 25 | Pavement sler (bike symbol) (666-7369) | EACH | 2 | $57.00 | $1.00 | $15.00 | $24.00 | $10.00 | $75.00 | $100.00 |
| 26 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 294,610 | $0.65 | $0.49 | $0.49 | $0.60 | $0.47 | $0.60 | $0.55 |
| 27 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 1,295,101 | $0.58 | $0.49 | $0.45 | $0.60 | $0.47 | $0.60 | $0.55 |
| 28 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 303,830 | $0.75 | $0.49 | $0.49 | $0.60 | $0.47 | $0.60 | $0.55 |
| 29 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 1,148,156 | $0.60 | $0.49 | $0.49 | $0.60 | $0.47 | $0.60 | $0.55 |
| 30 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 115,689 | $5.00 | $3.15 | $2.85 | $5.29 | $5.50 | $5.00 | |
| 31 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 16,644 | $13.00 | $10.00 | $10.75 | $9.20 | $7.21 | $15.00 | $17.00 |
| 32 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 877 | $222.30 | $175.00 | $240.00 | $175.00 | $106.58 | $225.00 | $220.00 |
| 33 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 62 | $303.00 | $240.00 | $410.00 | $282.00 | $171.58 | $250.00 | $425.00 |
| 34 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 32 | $330.00 | $275.00 | $415.00 | $291.00 | $179.44 | $250.00 | $385.00 |
| 35 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 250 | $295.20 | $250.00 | $300.00 | $250.00 | $147.99 | $250.00 | $300.00 |
| 36 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 1,358 | $30.00 | $25.00 | $72.00 | $58.00 | $35.94 | $30.00 | $50.00 |
| 37 | Prefabricated PM type C (W)(bike arrow) (668-7113) | EACH | 2 | $118.76 | $50.00 | $190.00 | $122.00 | $57.27 | $150.00 | $100.00 |
| 38 | Prefabricated PM type C (W)(bike symbol) (668-7115) | EACH | 2 | $203.13 | $100.00 | $190.00 | $123.00 | $99.26 | $150.00 | $100.00 |
| 39 | Prefabricated PM type C (Y)(24")(solid) (668-7127) | LF | 6,019 | $13.00 | $10.00 | $10.75 | $9.20 | $7.10 | $16.00 | $17.00 |
| 40 | Prefabricated PM type C (blue&white)(evac sym) (668-7136) | EACH | 5 | $1,500.00 | $1,250.00 | $1,500.00 | $929.79 | $250.00 | $1,000.00 | |
| 41 | Reflectorized pavement marker type I-C (672-7002) | EACH | 15,823 | $5.00 | $5.00 | $3.95 | $4.00 | $3.39 | $4.50 | $5.50 |
| 42 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 30,174 | $4.00 | $5.00 | $3.95 | $4.00 | $3.39 | $4.50 | $5.50 |
| 43 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 5,025 | $4.70 | $5.00 | $3.95 | $4.00 | $3.39 | $4.50 | $5.50 |
| 44 | Eliminating existing PM & markers (6") (677-7002) | LF | 4,427,195 | $0.20 | $0.13 | $0.16 | $0.10 | $0.28 | $0.35 | $0.29 |
| 45 | Eliminating existing PM & markers (8") (677-7004) | LF | 91,295 | $0.70 | $0.25 | $0.50 | $0.64 | $0.60 | $0.45 | $0.79 |
| 46 | Eliminating existing PM & markers (12") (677-7006) | LF | 6,425 | $0.48 | $1.00 | $1.40 | $1.50 | $0.77 | $1.00 | $2.00 |
| 47 | Eliminating existing PM & markers (24") (677-7008) | LF | 20,045 | $2.80 | $2.00 | $2.00 | $2.50 | $2.13 | $2.00 | $4.00 |
| 48 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 867 | $37.51 | $25.00 | $40.00 | $35.00 | $50.00 | $50.00 | $30.00 |
| 49 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 65 | $55.40 | $35.00 | $40.00 | $50.00 | $50.00 | $50.00 | $30.00 |
| 50 | Eliminating existing PM & markers (uturn arrow) (677-7012) | EACH | 32 | $60.00 | $45.00 | $40.00 | $62.00 | $50.00 | $50.00 | $30.00 |
| 51 | Eliminating existing PM & markers (word) (677-7015) | EACH | 246 | $41.02 | $40.00 | $40.00 | $41.00 | $50.00 | $50.00 | $30.00 |
| 52 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 1,311 | $20.00 | $25.00 | $15.00 | $30.00 | $50.00 | $10.00 | $15.00 |
| 53 | Eliminating existing PM & marks (bike arrow) (677-7025) | EACH | 2 | $39.00 | $10.00 | $30.00 | $35.00 | $50.00 | $50.00 | $30.00 |
| 54 | Eliminating existing PM & marks (bike symbol) (677-7027) | EACH | 2 | $49.54 | $20.00 | $30.00 | $35.00 | $50.00 | $50.00 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 2, 2026. Compiled by Mirage Metrics.