TxDOT contract A00196640 bid tabulation

Surfacing/Roadway Restoration, SH 326 (US 69, SOUTH to 0.10 MILES SOUTH OF FM 1293). Let by Texas DOT on May 6, 2026, Hardin, Beaumont District. 5 bids received; low bid $1,527,727 by Texas Materials Group, Inc., -4.6% against the engineer's estimate of $1,601,631.

Owner
Texas DOT
Letting
06 MAY 2026
Pay items
38
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Texas Materials Group, Inc.$1,527,727Low-5.0%
2Select Maintenance, L.L.C.$1,666,854+9.0%+4.0%
3O. Trevino Construction, LLC$1,752,706+15%+9.0%
4Foutsco Paving Company, LLC$1,792,710+17%+12%
5Isi Contracting, Inc.$2,196,092+44%+37%
TxDOT contract A00196640: bids by rank

Engineer's estimate: $1,601,631.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Texas Materials Group, Inc.2. Select Maintenance, L.L.C.3. O. Trevino Construction, LLC4. Foutsco Paving Company, LLC5. Isi Contracting, Inc.
1Removing concrete (curb) (104-7016)LF285$19.00$21.75$20.00$45.83$10.00$80.00
2Asphalt (AC-20-5TR) (316-7007)GAL6,624$4.00$5.00$5.00$5.00$4.50$5.80
3Aggregate (type-PB or PL, GR-4)(sac-A) (316-7241)CY142$220.00$375.00$375.00$375.00$415.00$434.00
4D-GR HMA type D PG64-22 (341-7043)TON147$150.00$147.00$147.00$147.00$300.00$308.00
5Tack coat (341-7082)GAL107$5.00$4.00$4.00$4.00$1.00$4.60
6Stone-MTRX-asphalt SMA-F sac-A PG76-22 (346-7017)TON1,587$200.00$235.00$235.00$235.01$300.00$250.00
7Tack coat (346-7028)GAL1,104$5.00$4.00$4.00$4.00$1.00$4.60
8Plane & text asphalt concrete pavement(1.5") (354-7018)SY420$2.00$28.00$28.43$28.00$10.00$26.00
9Plan & text concrete pavement(0" to 0.5") (354-7023)SY3,100$6.50$12.00$12.43$12.00$1.00$11.90
10Plan & text concrete pavement(0" to 1.5") (354-7026)SY2,034$10.00$12.00$12.43$12.00$1.00$12.50
11Full - depth repair CPJR (8") (361-7036)CY281$450.00$1,142.00$1,050.00$1,428.00$1,525.00$1,500.00
12Cleaning and sealing existing joints (438-7001)LF9,667$10.00$3.25$4.00$11.67$3.70$22.00
13Mobilization (500-7001)LS1$130,000$108,650$165,000$175,000$54,000$200,000
14Barricades, signs and traffic handling (502-7001)MO6$4,000.00$1,000.00$32,250$6,374.00$55,000$7,850.00
15TMA (stationary) (505-7001)DAY84$350.00$326.50$50.00$200.00$1.00$550.00
16TMA (mobile operation) (505-7003)DAY28$250.00$766.00$100.00$200.00$1.00$735.00
17Temporary SDMT cont fence (inlet protection) (506-7040)LF168$9.00$16.00$8.00$4.00$1.00$6.76
18Temporary sediment control fence (remove) (506-7041)LF168$1.00$5.50$1.00$2.00$1.00$1.09
19Concrete curb (type II) (529-7002)LF285$38.00$38.00$35.00$69.00$32.00$231.00
20Intrsct, drvways, & turnout (ACP) (530-7022)SY497$50.00$41.00$40.00$40.00$25.00$93.00
21Work zone pavement marking non-removing (W)6"(broken) (662-7005)LF1,220$0.75$0.65$0.55$0.55$0.50$0.58
22Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF4,706$1.00$0.65$0.55$0.50$0.42$0.49
23Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH193$1.00$1.50$0.50$1.40$1.00$2.90
24Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH102$2.00$1.25$0.50$1.54$1.00$2.90
25Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF1,579$2.00$1.10$1.00$1.00$1.45$1.68
26Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407)LF3,470$1.00$0.95$0.85$0.85$1.05$1.22
27Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF10,751$1.00$0.95$0.85$0.85$0.75$0.87
28Prefabricated PM type C (W)(12")(solid) (668-7087)LF324$9.00$11.00$8.00$8.00$7.85$9.09
29Prefabricated PM type C (W)(24")(solid) (668-7089)LF78$14.00$22.00$18.50$18.50$17.50$20.00
30Prefabricated PM type C (W)(arrow) (668-7091)EACH17$268.00$272.00$275.00$275.01$250.00$290.00
31Prefabricated PM type C (W)(word) (668-7103)EACH5$328.00$353.50$345.00$345.01$380.00$440.00
32Reflectorized pavement marker type II-A-A (672-7004)EACH52$7.00$11.00$6.50$6.50$5.50$6.37
33Reflectorized pavement marker type II-C-R (672-7006)EACH140$7.00$11.00$6.50$6.50$5.50$6.37
34Spalling repair (hydraulic cement) (720-7001)CF800$300.00$173.00$159.00$242.00$140.00$132.00
35Spalling repair (polymeric) (semirigid) (720-7003)GAL26$400.00$146.00$135.00$209.00$160.00$287.00
36Soil dens & raising concrete slabs (HDPF) (3008-7001)LB4,080$6.50$7.00$7.25$5.45$6.19$20.00
37Dowel bar retrofit (3012-7001)EACH174$120.00$136.00$125.00$136.00$125.00$138.75
38Continuous grinding-concrete pavement (3017-7001)SY18,401$20.00$10.00$8.60$6.33$5.92$13.00
TxDOT contract A00196640: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy