TxDOT contract A00210231 bid tabulation

Surfacing/Roadway Restoration, IH 10 (Gessner Road to North Post Oak Road). Let by Texas DOT on December 3, 2025, Harris, Houston District. 5 bids received; low bid $1,682,562 by TRP Infrastructure Services, LLC, -17% against the engineer's estimate of $2,032,968.

Owner
Texas DOT
Letting
03 DEC 2025
Pay items
70
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1TRP Infrastructure Services, LLC$1,682,562Low-17%
2Stripe Lines, Inc.$1,811,461+8.0%-11%
3Stripe-A-Zone, LLC$1,817,044+8.0%-11%
4Professional Traffic Control LLC$1,857,391+10%-9.0%
5Batterson, LLP$1,993,509+18%-2.0%
TxDOT contract A00210231: bids by rank

Engineer's estimate: $2,032,968.

Bid tabulation

LinePay itemUnitQuantityEstimate1. TRP Infrastructure Services, LLC2. Stripe Lines, Inc.3. Stripe-A-Zone, LLC4. Professional Traffic Control LLC5. Batterson, LLP
1Mobilization (500-7001)LS1$45,000$15,000$5,000.00$50,000$25,000$10,000
2Barricades, signs and traffic handling (502-7001)MO4$5,400.00$1,500.00$1,000.00$750.00$3,500.00$2,500.00
3Portable changeable message sign (503-7001)DAY63$100.00$55.00$10.00$75.00$25.00$150.00
4TMA (stationary) (505-7001)DAY10$230.00$1,500.00$1.00$750.00$1.00$1,500.00
5TMA (mobile operation) (505-7003)DAY252$270.00$10.00$10.00$1.00$1.00$100.00
6Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH18$770.00$648.00$850.00$645.00$625.00$650.00
7Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014)EACH953$13.50$15.00$20.00$24.50$12.00$20.00
8Install delineator assembly (D-SY)SZ 1(BRF)CTB (BR) (658-7033)EACH233$13.50$15.00$20.00$24.50$15.00$20.00
9Reflectorized pavement marking type II (Y) 12" (solid) (666-7215)LF2,122$0.90$1.30$3.00$1.00$2.25$2.00
10Reflectorized pavement marking type III (W)(12")(solid) (666-7242)LF31,640$1.80$3.00$3.00$5.00$3.25$3.00
11Reflectorized pavement marking type III (W)(12")(DOT) (666-7243)LF6,960$3.60$2.00$3.20$2.00$3.50$3.00
12Reflectorized pavement marking type III (W)(24")(solid) (666-7244)LF7,454$7.20$7.25$9.36$6.50$6.75$10.00
13Reflectorized pavement marking type III (Y)(12")(solid) (666-7252)LF264$3.60$4.40$5.00$7.00$3.25$7.00
14Reflectorized pavement marking type III (BLK)(6")(shadow) (666-7262)LF27,590$1.80$0.61$0.92$0.61$0.80$0.85
15Pavement sler (arrow) (666-7353)EACH209$5.50$26.00$25.09$18.25$22.00$12.00
16Pavement sler (word) (666-7354)EACH243$5.50$32.00$25.84$18.25$25.00$12.00
17Pavement sler (double arrow) (666-7356)EACH53$5.50$37.00$27.21$24.00$40.00$22.00
18Pavement sler (uturn arrow) (666-7358)EACH30$10.00$38.00$21.78$24.00$70.00$30.00
19Pavement sler (symbol) (666-7363)EACH33$15.30$95.00$21.78$105.00$40.00$35.00
20Pavement sler (yld tri) (666-7365)EACH171$3.60$11.00$21.78$11.50$10.00$10.00
21Pavement sler (number) (666-7367)EACH12$19.00$10.50$21.78$8.00$25.00$10.00
22Pavement sler (bike arrow) (666-7368)EACH4$9.00$26.00$21.78$25.00$20.00$10.00
23Pavement sler (bike word) (666-7370)EACH4$9.00$26.00$21.78$25.00$20.00$10.00
24Prefabricated PM type C (W)(arrow) (668-7091)EACH209$270.00$180.00$131.43$170.00$250.00$180.00
25Prefabricated PM type C (W)(double arrow) (668-7093)EACH53$270.00$307.00$188.99$290.00$310.00$360.00
26Prefabricated PM type C (W)(uturn arrow) (668-7096)EACH30$270.00$326.00$195.94$298.00$350.00$305.00
27Prefabricated PM type C (W)(number) (668-7102)EACH12$68.00$198.00$89.02$284.00$200.00$100.00
28Prefabricated PM type C (W)(word) (668-7103)EACH243$330.00$265.00$168.10$223.00$260.00$255.00
29Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH171$54.00$63.00$68.88$60.00$35.00$40.00
30Prefabricated PM type C (W)(bike arrow) (668-7113)EACH4$135.00$133.00$87.77$150.00$175.00$185.00
31Prefabricated PM type C (W)(bike word) (668-7116)EACH4$135.00$190.00$130.09$200.00$180.00$185.00
32Prefabricated PM type C (multi)(shield) (668-7135)EACH33$2,520.00$2,600.00$1,900.00$4,800.00$2,600.00$2,500.00
33Reflectorized pavement marker type I-C (672-7002)EACH242$5.50$5.50$5.13$6.75$6.00$5.00
34Reflectorized pavement marker type II-A-A (672-7004)EACH284$5.50$4.00$5.13$6.75$6.00$5.00
35Reflectorized pavement marker type II-C-R (672-7006)EACH9,940$5.50$4.00$5.13$6.75$5.00$5.00
36Eliminating existing PM & markers (6") (677-7002)LF225,130$0.60$0.35$0.42$0.34$0.45$0.25
37Eliminating existing PM & markers (8") (677-7004)LF67,161$0.80$0.50$0.55$0.45$0.55$0.55
38Eliminating existing PM & markers (10") (677-7005)LF61,250$1.00$0.70$0.65$0.60$1.00$3.00
39Eliminating existing PM & markers (12") (677-7006)LF47,902$1.00$1.00$0.70$2.00$0.85$2.00
40Eliminating existing PM & markers (24") (677-7008)LF2,661$1.80$2.70$4.98$2.00$2.00$3.00
41Eliminating existing PM & markers (arrow) (677-7009)EACH209$63.00$39.00$50.00$46.00$50.00$50.00
42Eliminating existing PM & markers (double arrow) (677-7010)EACH53$70.00$54.00$50.00$68.00$65.00$65.00
43Eliminating existing PM & markers (uturn arrow) (677-7012)EACH30$63.00$68.00$50.00$68.00$75.00$65.00
44Eliminating existing PM & markers (number) (677-7014)EACH12$50.00$39.00$50.00$32.00$45.00$30.00
45Eliminating existing PM & markers (word) (677-7015)EACH243$76.00$45.00$50.00$46.00$55.00$50.00
46Eliminating existing PM & markers (shield) (677-7022)EACH33$40.00$254.00$114.00$525.00$125.00$250.00
47Eliminating existing PM & markers (36")(yld tri) (677-7024)EACH171$18.00$32.00$35.00$34.00$30.00$10.00
48Eliminating existing PM & marks (bike arrow) (677-7025)EACH4$72.00$39.00$87.33$50.00$40.00$25.00
49Eliminating existing PM & marks (bike word) (677-7028)EACH4$72.00$39.00$87.33$50.00$40.00$25.00
50Pavement surface preparation for marking (6") (678-7002)LF225,130$0.20$0.01$0.01$0.01$0.01$0.01
51Pavement surface preparation for marking (8") (678-7004)LF67,161$0.10$0.02$0.03$0.01$0.05$0.05
52Pavement surface preparation for marking (10") (678-7005)LF61,250$0.15$0.03$0.04$0.01$0.20$0.10
53Pavement surface preparation for marking (12") (678-7006)LF40,986$0.20$0.25$0.20$0.05$0.20$0.15
54Pavement surface preparation for marking (24") (678-7008)LF7,454$1.80$0.45$0.40$0.25$0.50$0.20
55Pavement surface preparation for marking (arrow) (678-7009)EACH209$5.20$11.50$10.00$12.00$10.00$3.00
56Pavement surface preparation for marking (double arrow) (678-7010)EACH53$10.00$16.25$10.00$12.00$20.00$3.00
57Pavement surface preparation for marking (uturn arr) (678-7012)EACH30$15.30$16.25$10.00$12.00$30.00$3.00
58Pavement surface preparation for marking (number) (678-7015)EACH12$81.00$13.50$10.00$12.00$10.00$3.00
59Pavement surface preparation for marking (word) (678-7016)EACH243$5.50$13.50$10.00$12.00$5.00$3.00
60Pavement surface preparation for marking (36")(yld tri) (678-7023)EACH171$4.50$5.40$10.00$7.00$5.00$3.00
61Pavement surface preparation for marking (shield) (678-7025)EACH33$4.90$51.00$10.00$110.00$40.00$10.00
62Pavement surface preparation for marking (bike arrow) (678-7026)EACH4$8.50$11.25$10.00$30.00$10.00$3.00
63Pavement surface preparation for marking (bike word) (678-7029)EACH4$9.00$11.25$10.00$30.00$10.00$3.00
64Prefb PV MK W/wnty type B(W)6"(broken)CNTST (6064-7003)LF61,250$12.00$10.86$12.90$9.75$11.75$12.00
65Mltply PV MK W/wty (W) (6") (solid) (6065-7001)LF87,432$0.60$0.60$0.80$0.60$0.72$0.65
66Mltply PV MK W/wty (W) (6") (broken) (6065-7002)LF27,590$0.70$0.75$0.80$0.62$0.72$0.65
67Mltply PV MK W/wty (W) (6") (DOT) (6065-7003)LF1,962$1.40$1.50$0.80$1.00$1.00$1.00
68Mltply PV MK W/wty (Y) (6") (solid) (6065-7004)LF80,556$0.60$0.60$0.80$0.60$0.72$0.65
69Mltply PV MK W/wty (W) (8") (solid) (6065-7007)LF65,541$0.95$1.00$1.16$0.95$1.35$1.20
70Mltply PV MK W/wty (W) (8") (DOT) (6065-7009)LF1,620$1.65$1.40$1.16$1.25$1.50$1.20
TxDOT contract A00210231: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of December 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy