TxDOT contract A00210231 bid tabulation
Surfacing/Roadway Restoration, IH 10 (Gessner Road to North Post Oak Road). Let by Texas DOT on December 3, 2025, Harris, Houston District. 5 bids received; low bid $1,682,562 by TRP Infrastructure Services, LLC, -17% against the engineer's estimate of $2,032,968.
- Owner
- Texas DOT
- Letting
- 03 DEC 2025
- Pay items
- 70
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | TRP Infrastructure Services, LLC | $1,682,562 | Low | -17% |
| 2 | Stripe Lines, Inc. | $1,811,461 | +8.0% | -11% |
| 3 | Stripe-A-Zone, LLC | $1,817,044 | +8.0% | -11% |
| 4 | Professional Traffic Control LLC | $1,857,391 | +10% | -9.0% |
| 5 | Batterson, LLP | $1,993,509 | +18% | -2.0% |
Engineer's estimate: $2,032,968.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. TRP Infrastructure Services, LLC | 2. Stripe Lines, Inc. | 3. Stripe-A-Zone, LLC | 4. Professional Traffic Control LLC | 5. Batterson, LLP |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (500-7001) | LS | 1 | $45,000 | $15,000 | $5,000.00 | $50,000 | $25,000 | $10,000 |
| 2 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $5,400.00 | $1,500.00 | $1,000.00 | $750.00 | $3,500.00 | $2,500.00 |
| 3 | Portable changeable message sign (503-7001) | DAY | 63 | $100.00 | $55.00 | $10.00 | $75.00 | $25.00 | $150.00 |
| 4 | TMA (stationary) (505-7001) | DAY | 10 | $230.00 | $1,500.00 | $1.00 | $750.00 | $1.00 | $1,500.00 |
| 5 | TMA (mobile operation) (505-7003) | DAY | 252 | $270.00 | $10.00 | $10.00 | $1.00 | $1.00 | $100.00 |
| 6 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 18 | $770.00 | $648.00 | $850.00 | $645.00 | $625.00 | $650.00 |
| 7 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014) | EACH | 953 | $13.50 | $15.00 | $20.00 | $24.50 | $12.00 | $20.00 |
| 8 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BR) (658-7033) | EACH | 233 | $13.50 | $15.00 | $20.00 | $24.50 | $15.00 | $20.00 |
| 9 | Reflectorized pavement marking type II (Y) 12" (solid) (666-7215) | LF | 2,122 | $0.90 | $1.30 | $3.00 | $1.00 | $2.25 | $2.00 |
| 10 | Reflectorized pavement marking type III (W)(12")(solid) (666-7242) | LF | 31,640 | $1.80 | $3.00 | $3.00 | $5.00 | $3.25 | $3.00 |
| 11 | Reflectorized pavement marking type III (W)(12")(DOT) (666-7243) | LF | 6,960 | $3.60 | $2.00 | $3.20 | $2.00 | $3.50 | $3.00 |
| 12 | Reflectorized pavement marking type III (W)(24")(solid) (666-7244) | LF | 7,454 | $7.20 | $7.25 | $9.36 | $6.50 | $6.75 | $10.00 |
| 13 | Reflectorized pavement marking type III (Y)(12")(solid) (666-7252) | LF | 264 | $3.60 | $4.40 | $5.00 | $7.00 | $3.25 | $7.00 |
| 14 | Reflectorized pavement marking type III (BLK)(6")(shadow) (666-7262) | LF | 27,590 | $1.80 | $0.61 | $0.92 | $0.61 | $0.80 | $0.85 |
| 15 | Pavement sler (arrow) (666-7353) | EACH | 209 | $5.50 | $26.00 | $25.09 | $18.25 | $22.00 | $12.00 |
| 16 | Pavement sler (word) (666-7354) | EACH | 243 | $5.50 | $32.00 | $25.84 | $18.25 | $25.00 | $12.00 |
| 17 | Pavement sler (double arrow) (666-7356) | EACH | 53 | $5.50 | $37.00 | $27.21 | $24.00 | $40.00 | $22.00 |
| 18 | Pavement sler (uturn arrow) (666-7358) | EACH | 30 | $10.00 | $38.00 | $21.78 | $24.00 | $70.00 | $30.00 |
| 19 | Pavement sler (symbol) (666-7363) | EACH | 33 | $15.30 | $95.00 | $21.78 | $105.00 | $40.00 | $35.00 |
| 20 | Pavement sler (yld tri) (666-7365) | EACH | 171 | $3.60 | $11.00 | $21.78 | $11.50 | $10.00 | $10.00 |
| 21 | Pavement sler (number) (666-7367) | EACH | 12 | $19.00 | $10.50 | $21.78 | $8.00 | $25.00 | $10.00 |
| 22 | Pavement sler (bike arrow) (666-7368) | EACH | 4 | $9.00 | $26.00 | $21.78 | $25.00 | $20.00 | $10.00 |
| 23 | Pavement sler (bike word) (666-7370) | EACH | 4 | $9.00 | $26.00 | $21.78 | $25.00 | $20.00 | $10.00 |
| 24 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 209 | $270.00 | $180.00 | $131.43 | $170.00 | $250.00 | $180.00 |
| 25 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 53 | $270.00 | $307.00 | $188.99 | $290.00 | $310.00 | $360.00 |
| 26 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 30 | $270.00 | $326.00 | $195.94 | $298.00 | $350.00 | $305.00 |
| 27 | Prefabricated PM type C (W)(number) (668-7102) | EACH | 12 | $68.00 | $198.00 | $89.02 | $284.00 | $200.00 | $100.00 |
| 28 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 243 | $330.00 | $265.00 | $168.10 | $223.00 | $260.00 | $255.00 |
| 29 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 171 | $54.00 | $63.00 | $68.88 | $60.00 | $35.00 | $40.00 |
| 30 | Prefabricated PM type C (W)(bike arrow) (668-7113) | EACH | 4 | $135.00 | $133.00 | $87.77 | $150.00 | $175.00 | $185.00 |
| 31 | Prefabricated PM type C (W)(bike word) (668-7116) | EACH | 4 | $135.00 | $190.00 | $130.09 | $200.00 | $180.00 | $185.00 |
| 32 | Prefabricated PM type C (multi)(shield) (668-7135) | EACH | 33 | $2,520.00 | $2,600.00 | $1,900.00 | $4,800.00 | $2,600.00 | $2,500.00 |
| 33 | Reflectorized pavement marker type I-C (672-7002) | EACH | 242 | $5.50 | $5.50 | $5.13 | $6.75 | $6.00 | $5.00 |
| 34 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 284 | $5.50 | $4.00 | $5.13 | $6.75 | $6.00 | $5.00 |
| 35 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 9,940 | $5.50 | $4.00 | $5.13 | $6.75 | $5.00 | $5.00 |
| 36 | Eliminating existing PM & markers (6") (677-7002) | LF | 225,130 | $0.60 | $0.35 | $0.42 | $0.34 | $0.45 | $0.25 |
| 37 | Eliminating existing PM & markers (8") (677-7004) | LF | 67,161 | $0.80 | $0.50 | $0.55 | $0.45 | $0.55 | $0.55 |
| 38 | Eliminating existing PM & markers (10") (677-7005) | LF | 61,250 | $1.00 | $0.70 | $0.65 | $0.60 | $1.00 | $3.00 |
| 39 | Eliminating existing PM & markers (12") (677-7006) | LF | 47,902 | $1.00 | $1.00 | $0.70 | $2.00 | $0.85 | $2.00 |
| 40 | Eliminating existing PM & markers (24") (677-7008) | LF | 2,661 | $1.80 | $2.70 | $4.98 | $2.00 | $2.00 | $3.00 |
| 41 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 209 | $63.00 | $39.00 | $50.00 | $46.00 | $50.00 | $50.00 |
| 42 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 53 | $70.00 | $54.00 | $50.00 | $68.00 | $65.00 | $65.00 |
| 43 | Eliminating existing PM & markers (uturn arrow) (677-7012) | EACH | 30 | $63.00 | $68.00 | $50.00 | $68.00 | $75.00 | $65.00 |
| 44 | Eliminating existing PM & markers (number) (677-7014) | EACH | 12 | $50.00 | $39.00 | $50.00 | $32.00 | $45.00 | $30.00 |
| 45 | Eliminating existing PM & markers (word) (677-7015) | EACH | 243 | $76.00 | $45.00 | $50.00 | $46.00 | $55.00 | $50.00 |
| 46 | Eliminating existing PM & markers (shield) (677-7022) | EACH | 33 | $40.00 | $254.00 | $114.00 | $525.00 | $125.00 | $250.00 |
| 47 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 171 | $18.00 | $32.00 | $35.00 | $34.00 | $30.00 | $10.00 |
| 48 | Eliminating existing PM & marks (bike arrow) (677-7025) | EACH | 4 | $72.00 | $39.00 | $87.33 | $50.00 | $40.00 | $25.00 |
| 49 | Eliminating existing PM & marks (bike word) (677-7028) | EACH | 4 | $72.00 | $39.00 | $87.33 | $50.00 | $40.00 | $25.00 |
| 50 | Pavement surface preparation for marking (6") (678-7002) | LF | 225,130 | $0.20 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 51 | Pavement surface preparation for marking (8") (678-7004) | LF | 67,161 | $0.10 | $0.02 | $0.03 | $0.01 | $0.05 | $0.05 |
| 52 | Pavement surface preparation for marking (10") (678-7005) | LF | 61,250 | $0.15 | $0.03 | $0.04 | $0.01 | $0.20 | $0.10 |
| 53 | Pavement surface preparation for marking (12") (678-7006) | LF | 40,986 | $0.20 | $0.25 | $0.20 | $0.05 | $0.20 | $0.15 |
| 54 | Pavement surface preparation for marking (24") (678-7008) | LF | 7,454 | $1.80 | $0.45 | $0.40 | $0.25 | $0.50 | $0.20 |
| 55 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 209 | $5.20 | $11.50 | $10.00 | $12.00 | $10.00 | $3.00 |
| 56 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 53 | $10.00 | $16.25 | $10.00 | $12.00 | $20.00 | $3.00 |
| 57 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 30 | $15.30 | $16.25 | $10.00 | $12.00 | $30.00 | $3.00 |
| 58 | Pavement surface preparation for marking (number) (678-7015) | EACH | 12 | $81.00 | $13.50 | $10.00 | $12.00 | $10.00 | $3.00 |
| 59 | Pavement surface preparation for marking (word) (678-7016) | EACH | 243 | $5.50 | $13.50 | $10.00 | $12.00 | $5.00 | $3.00 |
| 60 | Pavement surface preparation for marking (36")(yld tri) (678-7023) | EACH | 171 | $4.50 | $5.40 | $10.00 | $7.00 | $5.00 | $3.00 |
| 61 | Pavement surface preparation for marking (shield) (678-7025) | EACH | 33 | $4.90 | $51.00 | $10.00 | $110.00 | $40.00 | $10.00 |
| 62 | Pavement surface preparation for marking (bike arrow) (678-7026) | EACH | 4 | $8.50 | $11.25 | $10.00 | $30.00 | $10.00 | $3.00 |
| 63 | Pavement surface preparation for marking (bike word) (678-7029) | EACH | 4 | $9.00 | $11.25 | $10.00 | $30.00 | $10.00 | $3.00 |
| 64 | Prefb PV MK W/wnty type B(W)6"(broken)CNTST (6064-7003) | LF | 61,250 | $12.00 | $10.86 | $12.90 | $9.75 | $11.75 | $12.00 |
| 65 | Mltply PV MK W/wty (W) (6") (solid) (6065-7001) | LF | 87,432 | $0.60 | $0.60 | $0.80 | $0.60 | $0.72 | $0.65 |
| 66 | Mltply PV MK W/wty (W) (6") (broken) (6065-7002) | LF | 27,590 | $0.70 | $0.75 | $0.80 | $0.62 | $0.72 | $0.65 |
| 67 | Mltply PV MK W/wty (W) (6") (DOT) (6065-7003) | LF | 1,962 | $1.40 | $1.50 | $0.80 | $1.00 | $1.00 | $1.00 |
| 68 | Mltply PV MK W/wty (Y) (6") (solid) (6065-7004) | LF | 80,556 | $0.60 | $0.60 | $0.80 | $0.60 | $0.72 | $0.65 |
| 69 | Mltply PV MK W/wty (W) (8") (solid) (6065-7007) | LF | 65,541 | $0.95 | $1.00 | $1.16 | $0.95 | $1.35 | $1.20 |
| 70 | Mltply PV MK W/wty (W) (8") (DOT) (6065-7009) | LF | 1,620 | $1.65 | $1.40 | $1.16 | $1.25 | $1.50 | $1.20 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.