TxDOT contract A00210239 bid tabulation
Surfacing/Roadway Restoration, US 290 (FM 529 to IH 610(W)). Let by Texas DOT on September 2, 2026, Harris, Houston District. 4 bids received; low bid $4,401,269 by Stripe-A-Zone, LLC, -8.7% against the engineer's estimate of $4,823,009.
- Owner
- Texas DOT
- Letting
- 02 SEP 2026
- Pay items
- 47
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Stripe-A-Zone, LLC | $4,401,269 | Low | -9.0% |
| 2 | TRP Infrastructure Services, LLC | $4,443,931 | +1.0% | -8.0% |
| 3 | FC Traffic Control, Inc. | $4,810,539 | +9.0% | 0.0% |
| 4 | Stripe Lines, Inc. | $8,005,471 | +82% | +66% |
Engineer's estimate: $4,823,009.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Stripe-A-Zone, LLC | 2. TRP Infrastructure Services, LLC | 3. FC Traffic Control, Inc. | 4. Stripe Lines, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (500-7001) | LS | 1 | $441,650 | $50,000 | $48,500 | $10,000 | $250,000 |
| 2 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $15,000 | $1,000.00 | $5,000.00 | $5,000.00 | $22,500 |
| 3 | Portable changeable message sign (503-7001) | DAY | 336 | $90.00 | $50.00 | $50.00 | $1.00 | $100.00 |
| 4 | TMA (mobile operation) (505-7003) | DAY | 1,344 | $275.00 | $1.00 | $0.01 | $1.00 | $100.00 |
| 5 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014) | EACH | 3,822 | $10.00 | $30.00 | $25.00 | $22.00 | $25.00 |
| 6 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BR) (658-7020) | EACH | 71 | $45.00 | $30.00 | $33.00 | $25.00 | |
| 7 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032) | EACH | 2,766 | $10.00 | $30.00 | $25.00 | $22.00 | $25.00 |
| 8 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BR) (658-7033) | EACH | 856 | $15.00 | $30.00 | $25.00 | $22.00 | $25.00 |
| 9 | Install delineator assembly (D-SY)SZ 1(BRF)GF2(BR) (658-7038) | EACH | 3 | $45.00 | $30.00 | $33.00 | $25.00 | |
| 10 | Reflectorized pavement marking type III (W)(12")(solid) (666-7242) | LF | 51,968 | $1.50 | $1.65 | $2.50 | $1.80 | $4.25 |
| 11 | Reflectorized pavement marking type III (W)(12")(DOT) (666-7243) | LF | 19,611 | $1.50 | $1.95 | $2.00 | $1.80 | $4.25 |
| 12 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 30,542 | $0.75 | $1.40 | $0.75 | $0.85 | $1.15 |
| 13 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 31,135 | $0.75 | $1.40 | $0.75 | $0.85 | $1.15 |
| 14 | Pavement sler 6" (666-7347) | LF | 61,677 | $0.15 | $0.25 | $0.15 | $0.10 | $0.40 |
| 15 | Pavement sler (arrow) (666-7353) | EACH | 121 | $11.00 | $36.00 | $25.00 | $25.00 | $25.00 |
| 16 | Pavement sler (word) (666-7354) | EACH | 131 | $15.00 | $36.00 | $30.00 | $25.00 | $25.00 |
| 17 | Pavement sler (double arrow) (666-7356) | EACH | 5 | $40.00 | $47.00 | $35.00 | $45.00 | $25.00 |
| 18 | Reflectorized pavement marking type III (W) (entr gore) (666-7442) | EACH | 68 | $700.00 | $800.00 | $500.00 | $750.00 | $350.00 |
| 19 | Reflectorized pavement marking type III (W) (exit gore) (666-7443) | EACH | 60 | $900.00 | $1,850.00 | $1,150.00 | $750.00 | $450.00 |
| 20 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 121 | $200.00 | $180.00 | $300.00 | $190.00 | $225.00 |
| 21 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 14 | $300.00 | $260.00 | $300.00 | $325.00 | $275.00 |
| 22 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 131 | $275.00 | $220.00 | $300.00 | $265.00 | $220.00 |
| 23 | Prefabricated PM type C (multi)(shield) (668-7135) | EACH | 56 | $1,800.00 | $2,500.00 | $2,000.00 | $2,500.00 | $2,500.00 |
| 24 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 14,184 | $4.00 | $4.10 | $4.00 | $5.50 | $5.00 |
| 25 | Eliminating existing PM & markers (6") (677-7002) | LF | 61,677 | $0.30 | $0.50 | $0.20 | $0.45 | $0.35 |
| 26 | Eliminating existing PM & markers (10") (677-7005) | LF | 274,405 | $0.40 | $0.90 | $0.65 | $0.55 | $0.95 |
| 27 | Eliminating existing PM & markers (12") (677-7006) | LF | 71,579 | $0.75 | $1.00 | $1.50 | $0.85 | $1.15 |
| 28 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 121 | $40.00 | $60.00 | $35.00 | $40.00 | $25.00 |
| 29 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 5 | $70.00 | $80.00 | $50.00 | $45.00 | $25.00 |
| 30 | Eliminating existing PM & markers (word) (677-7015) | EACH | 131 | $45.00 | $60.00 | $40.00 | $50.00 | $25.00 |
| 31 | Eliminating existing PM & markers (entr gore) (677-7016) | EACH | 68 | $200.00 | $420.00 | $300.00 | $450.00 | $150.00 |
| 32 | Eliminating existing PM & markers (exit gore) (677-7017) | EACH | 60 | $220.00 | $500.00 | $550.00 | $450.00 | $150.00 |
| 33 | Eliminating existing PM & markers (shield) (677-7022) | EACH | 56 | $110.00 | $210.00 | $200.00 | $125.00 | $50.00 |
| 34 | Pavement surface preparation for marking (6") (678-7002) | LF | 61,677 | $0.07 | $0.05 | $0.25 | $0.01 | $0.30 |
| 35 | Pavement surface preparation for marking (10") (678-7005) | LF | 274,405 | $0.03 | $0.10 | $0.30 | $0.05 | $0.45 |
| 36 | Pavement surface preparation for marking (12") (678-7006) | LF | 65,014 | $0.05 | $0.15 | $0.25 | $0.25 | $0.90 |
| 37 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 122 | $10.00 | $12.00 | $10.00 | $10.00 | $25.00 |
| 38 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 5 | $15.00 | $12.00 | $15.00 | $15.00 | $25.00 |
| 39 | Pavement surface preparation for marking (word) (678-7016) | EACH | 132 | $13.00 | $12.00 | $13.00 | $15.00 | $25.00 |
| 40 | Pavement surface preparation for marking (entr gore) (678-7017) | EACH | 68 | $25.00 | $100.00 | $100.00 | $65.00 | $150.00 |
| 41 | Pavement surface preparation for marking (exit gore) (678-7018) | EACH | 60 | $30.00 | $150.00 | $100.00 | $65.00 | $150.00 |
| 42 | Pavement surface preparation for marking (shield) (678-7025) | EACH | 56 | $53.00 | $40.00 | $50.00 | $50.00 | $50.00 |
| 43 | Prefb PV MK W/wnty type B(W)6"(broken)CNTST (6064-7003) | LF | 236,190 | $10.00 | $9.00 | $9.70 | $11.65 | $19.00 |
| 44 | Refb PV MK W/wnty type B(W)(6")(DOT)CNTST (6064-7009) | LF | 38,215 | $9.50 | $9.00 | $10.00 | $12.00 | $19.00 |
| 45 | Mltply PV MK W/wty (W) (6") (solid) (6065-7001) | LF | 357,550 | $0.50 | $0.60 | $0.50 | $0.58 | $0.90 |
| 46 | Mltply PV MK W/wty (W) (6") (DOT) (6065-7003) | LF | 3,701 | $0.85 | $0.60 | $1.00 | $0.65 | $0.90 |
| 47 | Mltply PV MK W/wty (Y) (6") (solid) (6065-7004) | LF | 442,627 | $0.40 | $0.60 | $0.50 | $0.58 | $0.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 2, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.